Rep. Norm Thurston — Voting Record

Utah House District 62 · complete roll-call record from le.utah.gov
← All votes

Bill

Local Land and Water Modifications
Number
S.B. 284 (2026GS)
Sponsor
Sen. Fillmore, Lincoln
Final action
Governor Signed 3/18/2026
Outcome
Became law — signed by Gov. Spencer J. Cox

Summary

This bill modifies provisions related to local land use and water

What it does

  • This bill:
  • defines terms;
  • amends requirements for a modified feasibility request related to a proposed municipal incorporation;
  • clarifies standards for county and municipal land use regulations and requirements;
  • modified requirements for an ordinance establishing a planning commission;
  • modifies planning commission powers and duties;
  • modifies the process for reviewing and approving a new or unlisted business use;
  • establishes requirements for regulating structure height;
  • requires a county or municipal legislative body to make a decision on proposed land use regulation if the planning commission fails to make a timely recommendation;
  • requires counties, municipalities, and special districts to adopt a written plan, beginning on January 1, 2028, for determining the reasonable future water requirement of the public before imposing a water exaction (written plan);
  • requires the state engineer to make rules to establish standards for the written plan;
  • addresses exaction for water and a land use authority's review of a land use application;
  • modifies the requirement to place certain infrastructure completion assurances in an interest-bearing account;
  • establishes requirements relating to development agreements;

Every vote on this bill

2026-02-17Senate Comm - Favorable Recommendation
Senate Economic Development and Workforce Services Committee
4-0-2not eligible / no record
2026-02-24Senate/ substituted
Senate 2nd Reading Calendar
0-0-29not eligible / no record
2026-02-24Senate/ passed 2nd reading
Senate 3rd Reading Calendar
19-10-0not eligible / no record
2026-02-25Senate/ circled
Senate 3rd Reading Calendar
0-0-29not eligible / no record
2026-02-26Senate/ uncircled
Senate 3rd Reading Calendar
0-0-29not eligible / no record
2026-02-26Senate/ passed 3rd reading
Clerk of the House
21-3-5not eligible / no record
2026-03-06House/ circled
House 3rd Reading Calendar for Senate bills
0-0-75not eligible / no record
2026-03-06House/ uncircled
House 3rd Reading Calendar for Senate bills
0-0-75not eligible / no record
2026-03-06House/ substituted
House 3rd Reading Calendar for Senate bills
0-0-75not eligible / no record
2026-03-06House/ passed 3rd reading
Senate Secretary
61-7-7YEA
2026-03-06Senate/ concurs with House amendment
House Speaker
24-3-2not eligible / no record

Bill text

enrolled version · official source
316
10-2a-106
10-2a-206
10-2a-220
10-3-702
10-20-102
10-20-301
10-20-302
10-20-501
10-20-502
10-20-507
10-20-625
10-20-626
10-20-806
10-20-807
10-20-902
10-20-910
10-20-911
10-20-912
10-20-1001
10-20-1101
10-20-1105
10-20-1106
10-20-1107
10-20-1109
10-21-101
10-21-304
13-43-205
17-79-102
17-79-205
17-79-301
17-79-302
17-79-501
17-79-502
17-79-507
17-79-621
17-79-706
17-79-707
17-79-803
17-79-811
17-79-812
17-79-813
17-79-901
17-79-1001
17-79-1005
17-79-1006
17-79-1007
17-79-1009
17B-1-120
63I-2-210
63I-2-217
73-1-4
0
Local Land and Water Modifications
2026 GENERAL SESSION
STATE OF UTAH
Chief Sponsor: Lincoln Fillmore
House Sponsor: Jill Koford
LONG TITLE
General Description:
This bill modifies provisions related to local land use and water planning.
Highlighted Provisions:
This bill:
defines terms;
amends requirements for a modified feasibility request related to a proposed municipal 
incorporation;
clarifies standards for county and municipal land use regulations and requirements;
modifies requirements for an ordinance establishing a planning commission;
modifies planning commission powers and duties;
modifies the process for reviewing and approving a new or unlisted business use;
establishes requirements for regulating structure height;
requires a county or municipal legislative body to make a decision on a proposed land use 
regulation if the planning commission fails to make a timely recommendation;
requires counties, municipalities, and special districts to adopt a written plan, beginning 
on January 1, 2028, for determining the reasonable future water requirement of the 
public before imposing a water exaction (written plan);
requires the state engineer to make rules to establish standards for the written plan; 
addresses exaction for water and a land use authority's review of a land use application;
modifies the requirement to place certain infrastructure completion assurances in an 
interest-bearing account;
establishes requirements relating to development agreements;
modifies the burden of proving that a land use authority's decision was arbitrary, 
capricious, or illegal;
addresses requirements relating to an appeal or variance hearing;
prohibits a legislative body from acting as an appeal authority;
modifies the standard of review of a land use authority's decision to deny or approve a 
land use application;
modifies appeal requirements; 
requires a specified municipality to allow a detached accessory dwelling unit as a 
permitted use in certain zones;
clarifies notice requirements for a proposed county land use ordinance that is ministerial 
in nature;
modifies a county's authority to deny an applicant a building permit or certificate of 
occupancy if the applicant has not completed an infrastructure improvement; and
makes technical and conforming changes. 
Money Appropriated in this Bill:
None
Other Special Clauses:
This bill provides a special effective date.
Utah Code Sections Affected:
AMENDS:
10-2a-106
Effective 
05/06/26
 , as last amended by Laws of Utah 2023, Chapter 224 and 
further amended by Revisor Instructions, Laws of Utah 2023, Chapter 224
10-2a-206
Effective 
05/06/26
 , as last amended by Laws of Utah 2024, Chapter 518
10-2a-220
Effective 
05/06/26
 , as last amended by Laws of Utah 2024, Chapter 518
10-3-702
Effective 
05/06/26
 , as last amended by Laws of Utah 2025, Chapter 354
10-20-102
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-301
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-302
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-501
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-502
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-507
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-806
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-807
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-902
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-910
Effective 
05/06/26
 , as enacted by Laws of Utah 2025, First Special Session, 
Chapter 15
10-20-911
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-1001
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-1101
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-1106
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-1107
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-20-1109
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
10-21-101
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
13-43-205
Effective 
05/06/26
 , as last amended by Laws of Utah 2025, First Special 
Session, Chapter 15
17-79-102
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-205
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-301
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-302
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-501
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-502
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-507
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-706
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-707
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-803
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-811
Effective 
05/06/26
 , as enacted by Laws of Utah 2025, First Special Session, 
Chapter 14
17-79-812
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-901
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-1001
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-1006
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-1007
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17-79-1009
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
17B-1-120
Effective 
05/06/26
 , as last amended by Laws of Utah 2023, Chapters 15, 255
63I-2-210
Effective 
05/06/26
 , as last amended by Laws of Utah 2025, First Special 
Session, Chapter 15
63I-2-217
Effective 
05/06/26
 , as last amended by Laws of Utah 2025, First Special 
Session, Chapter 7
73-1-4
Effective 
05/06/26
Partially Repealed 
12/31/30
 , as last amended by Laws of 
Utah 2024, Chapter 233
ENACTS:
10-20-625
Effective 
05/06/26
 , Utah Code Annotated 1953
10-20-626
Effective 
05/06/26
 , Utah Code Annotated 1953
10-20-912
Effective 
05/06/26
 , Utah Code Annotated 1953
10-21-304
Effective 
10/01/26
 , Utah Code Annotated 1953
17-79-621
Effective 
05/06/26
 , Utah Code Annotated 1953
17-79-813
Effective 
05/06/26
 , Utah Code Annotated 1953
REPEALS AND REENACTS:
10-20-1105
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 15
17-79-1005
Effective 
05/06/26
 , as renumbered and amended by Laws of Utah 2025, 
First Special Session, Chapter 14
Be it enacted by the Legislature of the state of Utah:
Section 1. Section 
10-2a-106
 is amended to read:
10-2a-106
Effective 
05/06/26
. Feasibility request filed before changes to law 
take effect.
(1)
If an individual files a feasibility request for incorporation of a city or town before May 
14, 2019, the process for incorporating the city or town is not subject to 
Laws of Utah 
2019, Chapter 165
 or 
Laws of Utah 2023, Chapter 224
, and is instead subject to the 
municipal incorporation law in effect on the day on which the individual files the 
feasibility request.
(2)
If an individual files a feasibility request for incorporation of a city or town before May 
3, 2023
,
:
(a)
except as provided in Subsection 
(2)(b)
, 
the process for incorporating the city or 
town is not subject to 
Laws of Utah 2023, Chapter 224
, and is subject to the 
municipal incorporation law in effect on the day on which the individual files the 
feasibility request
; and
(b)
the process and requirements for filing a modified feasibility request on or after May 
6, 2026, shall be in accordance with the law in effect on the day on which the 
individual or an incorporation sponsor files a modified feasibility request
.
Section 2. Section 
10-2a-206
 is amended to read:
10-2a-206
Effective 
05/06/26
. Modified feasibility request -- Supplemental 
feasibility study.
(1)
As used in this section, "specified landowner" means the same as that term is defined in 
Section 
10-2a-204.5
.
(1)
(2)
(a)
The sponsors of a feasibility request may modify the request to alter the 
boundaries of the proposed municipality and refile the modified feasibility request 
with the county clerk if:
(i)
the results of the feasibility study do not comply with Subsection 
10-2a-205(5)(a)
; 
or
(ii)
(A)
the feasibility request complies with Subsection 
10-2a-201.5(4)(b)
;
(B)
the annexation petition described in Subsection 
10-2a-201.5(4)(b)
 that 
proposed the annexation of an area that is part of the area proposed for 
incorporation has been denied; and
(C)
an incorporation petition based on the feasibility request has not been filed.
(b)
(i)
The sponsors of a feasibility request may not file a modified request under 
Subsection 
(1)(a)(i)
(2)(a)(i)
 more than 90 days after the day on which the 
feasibility consultant submits the final results of the feasibility study under 
Subsection 
10-2a-205(2)(c)(iii)
.
(ii)
The sponsors of a feasibility request may not file a modified request under 
Subsection 
(1)(a)(ii)
(2)(a)(ii)
 more than 18 months after filing the original 
feasibility request under Section 
10-2a-202
.
(c)
(i)
Subject to Subsection 
(1)(c)(ii)
(2)(c)(ii)
, each modified feasibility request 
under Subsection 
(1)(a)
(2)(a)
 shall comply with Subsections 
10-2a-202(1)
, (3), 
(4), and (5) and Subsection 
10-2a-201.5(4)
.
(ii)
Notwithstanding Subsection 
(1)(c)(i)
(2)(c)(i)
, a signature on a feasibility request 
filed under Section 
10-2a-202
 may be used toward fulfilling the signature 
requirement of Subsection 
10-2a-202(1)(a)
 for the feasibility request as modified 
under Subsection 
(1)(a)
(2)(a)
, unless the modified feasibility request proposes 
the incorporation of an area that is more than 20% larger or smaller than the area 
described by the original feasibility request in terms of:
(A)
private land area; or
(B)
assessed fair market value of private real property, as of January 1 of the 
current year.
(d)
Within 20 days after the day on which the county clerk receives the modified 
request, the county clerk and the lieutenant governor shall follow the same procedure 
described in Subsections 
10-2a-204(1)
 through 
(6)
 for the modified feasibility request 
as for an original feasibility request.
(e)
(i)
If a sponsor files a modified feasibility request that includes an area of land that 
was not included in the original feasibility request, the county clerk shall, within 
seven days after the day on which the sponsor files the modified feasibility request 
with the lieutenant governor, identify any new specified landowners located 
within the added area of land and mail written notice to each of the new specified 
landowners.
(ii)
The notice described in Subsection 
(2)(e)(i)
 shall:
(A)
describe the added area of land; and
(B)
state that a specified landowner who owns land within the added area may 
request exclusion of the land from the proposed incorporation boundaries by 
filing a request for exclusion with the county clerk within 30 days after the day 
on which the county clerk mails the notice.
(f)
(i)
A specified landowner who owns land within the added area described in 
Subsection 
(2)(
e)(i)
 may request exclusion of the land from the proposed 
incorporation boundaries by filing a request for exclusion with the county clerk 
within 30 days after the day on which the county clerk mails the notice described 
in Subsection 
(2)
(e)(i)
.
(ii)
The county clerk shall process a request for exclusion filed under Subsection 
(
2)(f)(i)
 in accordance with Subsections 
10-2a-204.5(3)
 through 
(7)
, except that the 
deadlines calculated from the first public hearing in Section 
10-2a-204.5
 shall 
instead be calculated from the day on which the county clerk mails notice 
described in Subsection 
(2)(e)(i)
.
(e)
(g)
Within 10 days after 
a
the day on which the time period for a specified 
landowner to request exclusion under Subsection 
(2)(f)
 expires, or if a sponsor files a 
modified feasibility request that does not include a new area of land, within 10 days 
after the sponsor files the
 modified feasibility request
 is filed
, the lieutenant 
governor shall:
(i)
estimate the cost of a supplemental feasibility study under this section; and
(ii)
provide the estimated cost to the feasibility request sponsors.
(f)
(h)
Within 20 days after the lieutenant governor provides the estimated 
supplemental feasibility study cost, the feasibility request sponsors shall pay the 
estimated cost to the lieutenant governor for a supplemental feasibility study 
conducted on or after May 1, 2024.
(2)
(3)
The timely filing of a modified feasibility request under Subsection 
(1)
(2)
 gives 
the modified feasibility request the same processing priority under Subsection 
10-2a-204(7)
 as the original feasibility request if the feasibility request sponsors pay the 
estimated cost of the supplemental feasibility study as required in Subsection 
(1)(e)
(2)(e)
.
(3)
(4)
Within
Except as provided in Subsection 
(5)
, within
 10 days after the day on 
which the lieutenant governor receives payment of the estimated supplemental 
feasibility study cost, the lieutenant governor shall commission the feasibility consultant 
who conducted the feasibility study to conduct a supplemental feasibility study that 
accounts for the modified feasibility request.
(5)
If a modified feasibility request includes an area of land that was not included in the 
original feasibility request, the lieutenant governor may not commission a supplemental 
feasibility study under Subsection 
(4)
 unless:
(a)
the deadline for filing a request for exclusion described in Subsection 
(2)(f)
 has 
passed; and
(b)
the county clerk and lieutenant governor have issued a final determination on any 
request for exclusion filed in accordance with Subsection 
(2)(f)
.
(4)
(6)
The lieutenant governor shall require the feasibility consultant to:
(a)
submit a draft of the supplemental feasibility study to each applicable person with 
whom the feasibility consultant is required to consult under Subsection 
10-2a-205(3)(c)
 within 30 days after the day on which the feasibility consultant is 
engaged to conduct the supplemental study;
(b)
allow each person to whom the consultant provided a draft under Subsection 
(4)(a)
(6)(a)
 to review and provide comment on the draft; and
(c)
submit a completed supplemental feasibility study, to the following within 45 days 
after the day on which the feasibility consultant is engaged to conduct the feasibility 
study:
(i)
the lieutenant governor;
(ii)
the county legislative body of the county in which the incorporation is proposed;
(iii)
the contact sponsor; and
(iv)
each person to whom the consultant provided a draft under Subsection 
(4)(a)
(6)(a)
.
(5)
(7)
If the results of the supplemental feasibility study do not comply with Subsection 
10-2a-205(5)(a)
:
(a)
the process to incorporate the area that is the subject of the supplemental feasibility 
study may not proceed; and
(b)
a feasibility request under Section 
10-2a-202
 may not be filed within 18 months after 
the date of the supplemental feasibility study if the feasibility request proposes the 
incorporation of an area included within the area described in the supplemental 
feasibility study.
Section 3. Section 
10-2a-220
 is amended to read:
10-2a-220
Effective 
05/06/26
. Costs of incorporation -- Fees established by 
lieutenant governor.
(1)
(a)
There is created an expendable special revenue fund known as the "Municipal 
Incorporation Expendable Special Revenue Fund."
(b)
The fund shall consist of:
(i)
appropriations from the Legislature; 
(ii)
payments that feasibility request sponsors make to the lieutenant governor under 
Subsections 
10-2a-205(1)(b)
 and 
10-2a-206(1)(f)
; and
(iii)
fees the lieutenant governor collects and remits to the fund under this section.
(c)
The lieutenant governor shall deposit all money collected under this section into the 
fund.
(2)
(a)
The lieutenant governor shall establish a fee in accordance with Section 
63J-1-504
for a cost incurred by the lieutenant governor or the county for an incorporation 
proceeding, including:
(i)
a request certification;
(ii)
a petition certification;
(iii)
publication of notices;
(iv)
public hearings;
(v)
all other incorporation activities occurring after the elections; and
(vi)
any other cost incurred by the lieutenant governor or county in relation to an 
incorporation proceeding.
(b)
A cost under Subsection 
(2)(a)
 does not include a cost incurred by a county for 
holding an election under Section 
10-2a-210
.
(3)
Subject to Subsections 
10-2a-205(1)(b)
 and 
10-2a-206(1)(f)
10-2a-206(2)(h)
, the 
lieutenant governor shall pay for a cost described in Subsection 
(2)(a)
 using funds from 
the Municipal Incorporation Expendable Special Revenue Fund.
(4)
(a)
A newly incorporated municipality shall:
(i)
pay to the lieutenant governor each fee established under Subsection 
(2)
 for each 
cost described in Subsection 
(2)(a)
 incurred by the lieutenant governor or the 
county; 
(ii)
pay the county for a cost described in Subsection 
(2)(b)
; and
(iii)
reimburse feasibility request sponsors the cost the feasibility request sponsors 
paid for:
(A)
a feasibility study under Section 
10-2a-205
; and
(B)
any supplemental feasibility study under Section 
10-2a-206
.
(b)
The lieutenant governor shall execute a payback agreement with each new 
municipality for the new municipality to pay the fees described in Subsection 
(4)(a)
over a period that, except as provided in Subsection 
(4)(c)
, may not exceed five years.
(c)
If necessary, the lieutenant governor may extend a fee payment deadline beyond the 
deadline described in Subsection 
(4)(b)
 by amending the payback agreement 
described in Subsection 
(4)(b)
.
(d)
The lieutenant governor shall deposit each fee the lieutenant governor collects under 
Subsection 
(4)(a)(i)
 into the Municipal Incorporation Expendable Special Revenue 
Fund.
(5)
If the lieutenant governor expends funds from the Municipal Incorporation Expendable 
Special Revenue Fund that are not repaid to the lieutenant governor under Subsection 
(4)(a)(i)
 because an area did not incorporate as a municipality, the Legislature shall 
appropriate money to the fund in an amount equal to the funds that are not repaid.
Section 4. Section 
10-3-702
 is amended to read:
10-3-702
Effective 
05/06/26
. Extent of power exercised by ordinance.
(1)
As used in this section, "open house" means an event held by a homeowner, including 
an event in association with a real estate agent, architect, builder, or developer, to 
showcase a home, including the outdoor landscaping around the home.
(2)
(1)
(a)
Except as provided in Subsection 
(2)(b)
, the
The
 governing body of a 
municipality may pass any ordinance to regulate, require, prohibit, govern, control or 
supervise any activity, business, conduct or condition authorized by this title or any 
other provision of law. 
(b)
(i)
The governing body of a municipality may not regulate an open house 
differently than a residential use.
(ii)
Any ordinance regulating an open house
 differently than a residential use is 
void.
(3)
(2)
(a)
An officer of the municipality may not be convicted of a criminal offense 
where the officer relied on or enforced an ordinance the officer reasonably believed 
to be a valid ordinance. 
(b)
It shall be a defense in any action for punitive damages over the enforcement of an 
invalid ordinance if the official: 
(i)
acted in good faith in enforcing an ordinance; or 
(ii)
enforced an ordinance on advice of legal counsel.
Section 5. Section 
10-20-102
 is amended to read:
10-20-102
Effective 
05/06/26
. Definitions.
As used in this chapter:
(1)
"Accessory dwelling unit" means a habitable living unit added to, created within, or 
detached from a primary single-family dwelling and contained on one lot.
(2)
"Adversely affected party" means a person other than a land use applicant who:
(a)
owns real property adjoining the property that is the subject of a land use application 
or land use decision; or
(b)
will suffer a damage different in kind than, or an injury distinct from, that of the 
general community as a result of the land use decision.
(3)
"Affected entity" means a county, municipality, special district, special service district 
under Title 
17D, Chapter 1
, Special Service District Act, school district, interlocal 
cooperation entity established under Title 
11, Chapter 13
, Interlocal Cooperation Act, 
specified public utility, property owner, property owners association, or the Department 
of Transportation, if:
(a)
the entity's services or facilities are likely to require expansion or significant 
modification because of an intended use of land;
(b)
the entity has filed with the municipality a copy of the entity's general or long-range 
plan; or
(c)
the entity has filed with the municipality a request for notice during the same 
calendar year and before the municipality provides notice to an affected entity in 
compliance with a requirement imposed under this chapter.
(4)
"Affected owner" means the owner of real property that is:
(a)
a single project;
 and
(b)
the subject of a land use approval that
:
(i)
sponsors of a referendum timely challenged in accordance with Section 
20A-7-601
; 
and
(c)
(ii)
is 
determined to be legally referable under Section 
20A-7-602.8
.
(5)
"Appeal authority" means the person, board, commission, agency, or other body 
designated by ordinance to decide an appeal of a decision of a land use application or a 
variance.
(6)
"Billboard" means a freestanding ground sign located on industrial, commercial, or 
residential property if the sign is designed or intended to direct attention to a business, 
product, or service that is not sold, offered, or existing on the property where the sign is 
located.
(7)
(a)
"Boundary adjustment" means an agreement between adjoining property owners 
to relocate a common boundary that results in a conveyance of property between the 
adjoining lots, adjoining parcels, or adjoining lots and parcels.
(b)
"Boundary adjustment" does not mean a modification of a lot or parcel boundary that:
(i)
creates an additional lot or parcel; or
(ii)
is made by the Department of Transportation.
(8)
(a)
"Boundary establishment" means an agreement between adjoining property 
owners to clarify the location of an ambiguous, uncertain, or disputed common 
boundary.
(b)
"Boundary establishment" does not mean a modification of a lot or parcel boundary 
that:
(i)
creates an additional lot or parcel; or
(ii)
is made by the Department of Transportation.
(9)
"Building code adoption cycle" means the period of time beginning the day on which a 
specific edition of a construction code from a nationally recognized code authority is 
adopted and effective in Title 15A, State Construction and Fire Codes Act, until the day 
before a new edition of a construction code is adopted and effective in Title 15A, State 
Construction and Fire Codes Act.
(9)
(10)
(a)
"Charter school" means:
(i)
an operating charter school;
(ii)
a charter school applicant that a charter school authorizer approves in accordance 
with Title 53G, Chapter 5, Part 3, Charter School Authorization; or
(iii)
an entity that is working on behalf of a charter school or approved charter 
applicant to develop or construct a charter school building.
(b)
"Charter school" does not include a therapeutic school.
(10)
"Building code adoption cycle" means the period of time beginning the day on which 
a specific edition of a construction code from a nationally recognized code authority is 
adopted and effective in Title 
15A, State Construction and Fire Codes Act
, until the day 
before a new edition of a construction code is adopted and effective in Title 
15A, State 
Construction and Fire Codes Act
.
(11)
"Conditional use" means a land use that, because of the unique characteristics or 
potential 
detrimental 
impact of the land use on the municipality, surrounding neighbors, 
or adjacent land uses, may not be compatible in some areas or may be compatible only if 
certain conditions are required that mitigate or eliminate the detrimental impacts.
(12)
"Constitutional taking" means a governmental action that results in a taking of private 
property 
so that
where
 compensation to the 
property 
owner
 of the property
 is required 
by the:
(a)
Fifth or Fourteenth Amendment 
of
to
 the Constitution of the United States; or
(b)
Utah Constitution, Article I, Section 22.
(13)
"Conveyance document" means an instrument that:
(a)
meets the definition of "document" in Section 
57-1-1
; and
(b)
meets the requirements of Section 
57-1-45.5
.
(14)
"Conveyance of property" means the transfer of ownership of any portion of real 
property from one person to another person.
(15)
"Culinary water authority" means the department, agency, or public entity with 
responsibility to review and approve the feasibility of the culinary water system and 
sources for the subject property.
(16)
"Department of Transportation" means the entity created in Section 
72-1-201
.
(17)
"Development activity" means:
(a)
any construction or expansion of a building, structure, or use that creates additional 
demand and need for public facilities;
(b)
any change in use of a building or structure that creates additional demand and need 
for public facilities; or
(c)
any change in the use of land that creates additional demand and need for public 
facilities.
(18)
(a)
"Development agreement" means a written agreement or amendment to a written 
agreement between a municipality and one or more parties that regulates or controls 
the use or development of a specific area of land.
(b)
"Development agreement" does not include an improvement completion assurance.
(19)
(a)
"Disability" means a physical or mental impairment that substantially limits one 
or more of a person's major life activities, including a person having a record of such 
an impairment or being regarded as having such an impairment.
(b)
"Disability" does not include current illegal use of, or addiction to, any federally 
controlled substance, as defined in the Controlled Substances Act, 21 U.S.C. 
Sec. 
802.
(20)
"Document" means the same as that term is defined in Section 
57-1-1
.
(21)
"Educational facility":
(a)
means:
(i)
a school district's building at which pupils assemble to receive instruction in a 
program for any combination of grades from preschool through grade 12, 
including kindergarten and a program for children with disabilities;
(ii)
a structure or facility:
(A)
located on the same property as a building described in Subsection 
(21)(a)(i)
; 
and
(B)
used in support of the use of that building; and
(iii)
a building to provide office and related space to a school district's administrative 
personnel; and
(b)
does not include:
(i)
land or a structure, including land or a structure for inventory storage, equipment 
storage, food processing or preparing, vehicle storage or maintenance, or similar 
use that is:
(A)
not located on the same property as a building described in Subsection 
(21)(a)(i)
; and
(B)
used in support of the purposes of a building described in Subsection 
(21)(a)(i)
; 
or
(ii)
a therapeutic school.
(22)
"Establishment document" means an instrument that:
(a)
meets the definition of "document" in Section 
57-1-1
; and
(b)
meets the requirements of Section 
57-1-45
.
(23)
"Full boundary adjustment" means a boundary adjustment that is not a simple 
boundary adjustment.
(24)
(23)
"Fire authority" means the department, agency, or public entity with 
responsibility to review and approve the feasibility of fire protection and suppression 
services for the subject property.
(25)
(24)
"Flood plain" means land that:
(a)
is within the 100-year flood plain designated by the Federal Emergency Management 
Agency; or
(b)
has not been studied or designated by the Federal Emergency Management Agency 
but presents a likelihood of experiencing chronic flooding or a catastrophic flood 
event because the land has characteristics that are similar to those of a 100-year flood 
plain designated by the Federal Emergency Management Agency.
(25)
"Full boundary adjustment" means a boundary adjustment that is not a simple 
boundary adjustment.
(26)
"General plan" means a document that a municipality adopts that sets forth general 
guidelines for proposed future development of the land within the municipality.
(27)
"Geologic hazard" means:
(a)
a surface fault rupture;
(b)
shallow groundwater;
(c)
liquefaction;
(d)
a landslide;
(e)
a debris flow;
(f)
unstable soil;
(g)
a rock fall; or
(h)
any other geologic condition that presents a risk:
(i)
to life;
(ii)
of substantial loss of real property; or
(iii)
of substantial damage to real property.
(28)
"Historic preservation authority" means a person, board, commission, or other body 
designated by a legislative body to:
(a)
recommend land use regulations to preserve local historic districts or areas; and
(b)
administer local historic preservation land use regulations within a local historic 
district or area.
(29)
"Home-based microschool" means the same as that term is defined in Section 
53G-6-201
.
(30)
"Hookup fee" means a fee for the installation and inspection of any pipe, line, meter, 
or appurtenance that connects to a municipal water, sewer, storm water, power, or other 
utility system.
(31)
(a)
"Identical plans" means floor plans submitted to a municipality that:
(i)
are submitted within the same building code adoption cycle as floor plans that 
were previously approved by the municipality;
(ii)
have no structural differences from floor plans that were previously approved by 
the municipality; and
(iii)
describe a building that:
(A)
is located on land zoned the same as the land on which the building described 
in the previously approved plans is located;
(B)
has a substantially identical floor plan to a floor plan previously approved by 
the municipality; and
(C)
does not require any engineering or analysis beyond a review to confirm the 
submitted floor plans are substantially identical to a floor plan previously 
approved by the municipality or a review of the site plan and associated 
geotechnical reports for the site.
(b)
"Identical plans" include floor plans that are oriented differently as the floor plan that 
was previously approved by the municipality.
(32)
"Impact fee" means a payment of money imposed under Title 
11, Chapter 36a
, Impact 
Fees Act.
(33)
"Improvement completion assurance" means a surety bond, letter of credit, financial 
institution bond, cash, assignment of rights, lien, or other equivalent security required by 
a municipality to guaranty the proper completion of landscaping or an infrastructure 
improvement required as a condition precedent to:
(a)
recording a subdivision plat; or
(b)
development of a commercial, industrial, mixed use, or multifamily project.
(34)
"Improvement warranty" means an applicant's unconditional warranty that the 
applicant's installed and accepted landscaping or infrastructure improvement:
(a)
complies with the municipality's written standards for design, materials, and 
workmanship; and
(b)
will not fail in any material respect, as a result of poor workmanship or materials, 
within the improvement warranty period.
(35)
"Improvement warranty period" means a period:
(a)
no later than one year after a municipality's acceptance of required public 
landscaping; or
(b)
no later than one year after a municipality's acceptance of required infrastructure, 
unless the municipality:
(i)
determines, based on accepted industry standards and for good cause, that a 
one-year period would be inadequate to protect the public health, safety, and 
welfare; and
(ii)
has substantial evidence, on record:
(A)
of prior poor performance by the applicant; or
(B)
that the area upon which the infrastructure will be constructed contains 
suspect soil and the municipality has not otherwise required the 
land use 
applicant to mitigate the suspect soil.
(36)
"Infrastructure improvement" means permanent infrastructure that is essential for the 
public health and safety or that:
(a)
is required for human occupation; and
(b)
an applicant shall install:
(i)
in accordance with published installation and inspection specifications for public 
improvements; and
(ii)
whether the improvement is public or private, as a condition of:
(A)
recording a subdivision plat;
(B)
obtaining a building permit; or
(C)
development of a commercial, industrial, mixed use, condominium, or 
multifamily project.
(37)
"Internal lot restriction" means a platted note, platted demarcation, or platted 
designation that:
(a)
runs with the land; and
(b)
(i)
creates a restriction that is enclosed within the perimeter of a lot described on 
the plat; or
(ii)
designates a development condition that is enclosed within the perimeter of a lot 
described on the plat.
(38)
"Land use applicant" means a property owner, or the property owner's designee, who 
submits a land use application regarding the property owner's land.
(39)
"Land use application":
(a)
means an application that is:
(i)
required by a municipality; and
(ii)
submitted by a land use applicant to obtain a land use decision; and
(b)
does not mean an application to enact, amend, or repeal a land use regulation.
(40)
"Land use authority" means:
(a)
a person, board, commission, agency, or body, including the local legislative body, 
designated by the local legislative body to act upon a land use application; or
(b)
if the local legislative body has not designated a person, board, commission, agency, 
or body, the local legislative body.
(41)
"Land use decision" means an administrative decision of a land use authority or appeal 
authority regarding:
(a)
a land use permit; or
(b)
a land use application.
(42)
"Land use permit" means a permit issued by a land use authority.
(43)
"Land use regulation":
(a)
means a legislative decision enacted by ordinance, law, code, map, resolution, 
engineering or development standard, specification for public improvement, fee, or 
rule that governs the use or development of land;
(b)
includes the adoption or amendment of a zoning map or the text of the zoning code; 
and
(c)
does not include:
(i)
a land use decision of the legislative body acting as the land use authority, even if 
the decision is expressed in a resolution or ordinance; or
(ii)
a temporary revision to an engineering specification that does not materially:
(A)
increase a land use applicant's cost of development compared to the existing 
specification; or
(B)
impact a land use applicant's use of land.
(44)
"Legislative body" means the municipal council.
(45)
"Local historic district or area" means a geographically definable area that:
(a)
contains any combination of buildings, structures, sites, objects, landscape features, 
archeological sites, or works of art that contribute to the historic preservation goals of 
a legislative body; and
(b)
is subject to land use regulations to preserve the historic significance of the local 
historic district or area.
(46)
"Lot" means a tract of land, regardless of any label, that is created by and shown on a 
subdivision plat that has been recorded in the office of the county recorder.
(47)
"Major transit investment corridor" means public transit service that uses or occupies:
(a)
public transit rail right-of-way;
(b)
dedicated road right-of-way for the use of public transit, such as bus rapid transit; or
(c)
fixed-route bus corridors subject to an interlocal agreement or contract between a 
municipality or county and:
(i)
a public transit district as defined in Section 
17B-2a-802
; or
(ii)
an eligible political subdivision as defined in Section 
59-12-2202
.
(48)
"Micro-education entity" means the same as that term is defined in Section 
53G-6-201
.
(49)
"Moderate income housing" means housing occupied or reserved for occupancy by 
households with a gross household income equal to or less than 80% of the median gross 
income for households of the same size in the county in which the city is located.
(50)
"Municipal utility easement" means an easement that:
(a)
is created or depicted on a plat recorded in a county recorder's office and is described 
as a municipal utility easement granted for public use;
(b)
is not a protected utility easement or a public utility easement as defined in Section 
54-3-27
;
(c)
the municipality or the municipality's affiliated governmental entity uses and 
occupies to provide a utility service, including sanitary sewer, culinary water, 
electrical, storm water, or communications or data lines;
(d)
is used or occupied with the consent of the municipality in accordance with an 
authorized franchise or other agreement;
(e)
(i)
is used or occupied by a specified public utility in accordance with an 
authorized franchise or other agreement; and
(ii)
is located in a utility easement granted for public use; or
(f)
is described in Section 
10-20-615
 and is used by a specified public utility.
(51)
"Nominal fee" means a fee that reasonably reimburses a municipality only for time 
spent and expenses incurred in:
(a)
verifying that building plans are identical plans; and
(b)
reviewing and approving those minor aspects of identical plans that differ from the 
previously reviewed and approved building plans.
(52)
"Noncomplying structure" means a structure that:
(a)
legally existed before the structure's current land use designation; and
(b)
because of one or more subsequent land use ordinance changes, does not conform to 
the setback, height restrictions, or other regulations, excluding those regulations, 
which govern the use of land.
(53)
"Nonconforming use" means a use of land that:
(a)
legally existed before 
its
the land's
 current land use designation;
(b)
has been maintained continuously since the time the land use ordinance governing 
the land changed; and
(c)
because of one or more subsequent land use ordinance changes, does not conform to 
the regulations that now govern the use of the land.
(54)
"Official map" means a map drawn by municipal authorities and recorded in a county 
recorder's office that:
(a)
shows actual and proposed rights-of-way, centerline alignments, and setbacks for 
highways and other transportation facilities;
(b)
provides a basis for restricting development in designated rights-of-way or between 
designated setbacks to allow the government authorities time to purchase or 
otherwise reserve the land; and
(c)
has been adopted as an element of the municipality's general plan.
(55)
"Parcel" means any real property that is not a lot.
(56)
"Person" means an individual, corporation, partnership, organization, association, trust, 
governmental agency, or any other legal entity.
(57)
"Plan for moderate income housing" means a written document adopted by a 
municipality's legislative body that includes:
(a)
an estimate of the existing supply of moderate income housing located within the 
municipality;
(b)
an estimate of the need for moderate income housing in the municipality for the next 
five years;
(c)
a survey of total residential land use;
(d)
an evaluation of how existing land uses and zones affect opportunities for moderate 
income housing; and
(e)
a description of the municipality's program to encourage an adequate supply of 
moderate income housing.
(58)
"Planning commission" means the commission established under Section 
10-20-301
.
(59)
"Plat" means an instrument subdividing property into lots as depicted on a map or 
other graphical representation of lands that a licensed professional land surveyor makes 
and prepares in accordance with Section 
10-20-803
 or 
57-8-13
.
(60)
"Potential geologic hazard area" means an area that:
(a)
is designated by a Utah Geological Survey map, county geologist map, or other 
relevant map or report as needing further study to determine the area's potential for 
geologic hazard; or
(b)
has not been studied by the Utah Geological Survey or a county geologist but 
presents the potential of geologic hazard because the area has characteristics similar 
to those of a designated geologic hazard area.
(61)
"Property owner" means a person that holds legal title in real property.
(61)
(62)
"Public agency" means:
(a)
the federal government;
(b)
the state;
(c)
a county, municipality, school district, special district, special service district, or 
other political subdivision of the state; or
(d)
a charter school.
(62)
(63)
"Public hearing" means a hearing at which members of the public are provided a 
reasonable opportunity to comment on the subject of the hearing.
(63)
(64)
"Public meeting" means a meeting that is required to be open to the public under 
Title 52, Chapter 4, Open and Public Meetings Act.
(64)
(65)
"Public street" means a public right-of-way, including a public highway, public 
avenue, public boulevard, public parkway, public road, public lane, public alley, public 
viaduct, public subway, public tunnel, public bridge, public byway, other public 
transportation easement, or other public way.
(65)
(66)
"Receiving zone" means an area that a municipality designates, by ordinance, as 
an area in which an owner of land may receive a transferable development right.
(66)
(67)
"Record of survey map" means a map of a survey of land prepared in accordance 
with Section 
17-73-504
.
(67)
(68)
"Residential facility for persons with a disability" means a residence:
(a)
in which more than one person with a disability resides; and
(b)
which is licensed or certified by the Department of Health and Human Services 
under:
(i)
Title 26B, Chapter 2, Part 1, Human Services Programs and Facilities; or
(ii)
Title 26B, Chapter 2, Part 2, Health Care Facility Licensing and Inspection.
(68)
(69)
"Residential roadway" means a public local residential road that:
(a)
will serve primarily to provide access to adjacent primarily residential areas and 
property;
(b)
is designed to accommodate minimal traffic volumes or vehicular traffic;
(c)
is not identified as a supplementary to a collector or other higher system classified 
street in an approved municipal street or transportation master plan;
(d)
has a posted speed limit of 25 miles per hour or less;
(e)
does not have higher traffic volumes resulting from connecting previously separated 
areas of the municipal road network;
(f)
cannot have a primary access, but can have a secondary access, and does not abut lots 
intended for high volume traffic or community centers, including schools, recreation 
centers, sports complexes, or libraries; and
(g)
primarily serves traffic within a neighborhood or limited residential area and is not 
necessarily continuous through several residential areas.
(69)
(70)
"Rules of order and procedure" means a set of rules that govern and prescribe in 
a public meeting:
(a)
parliamentary order and procedure;
(b)
ethical behavior; and
(c)
civil discourse.
(70)
(71)
"Sanitary sewer authority" means the department, agency, or public entity with 
responsibility to review and approve the feasibility of sanitary sewer services or onsite 
wastewater systems.
(71)
(72)
"Sending zone" means an area that a municipality designates, by ordinance, as an 
area from which an owner of land may transfer a transferable development right.
(72)
(73)
"Simple boundary adjustment" means a boundary adjustment that does not:
(a)
affect a public right-of-way, municipal utility easement, or other public property;
(b)
affect an existing easement, onsite wastewater system, or an internal lot restriction; or
(c)
result in a lot or parcel out of conformity with land use regulations.
(73)
(74)
"Special district" means an entity under Title 17B, Limited Purpose Local 
Government Entities - Special Districts, and any other governmental or 
quasi-governmental entity that is not a county, municipality, school district, or the state.
(75)
"Specific land use law" means a requirement or restriction on the use of a specific 
parcel in a development agreement that a legislative body approves with the consent of 
an affected property owner.
(74)
(76)
"Specified public agency" means:
(a)
the state;
(b)
a school district; or
(c)
a charter school.
(75)
(77)
"Specified public utility" means an electrical corporation, gas corporation, or 
telephone corporation, as those terms are defined in Section 
54-2-1
.
(76)
(78)
"State" includes any department, division, or agency of the state.
(77)
(79)
(a)
"Subdivision" means any land that is divided, resubdivided, or proposed to 
be divided into two or more lots or other division of land for the purpose, whether 
immediate or future, for offer, sale, lease, or development either on the installment 
plan or upon any and all other plans, terms, and conditions.
(b)
"Subdivision" includes:
(i)
the division or development of land, whether by deed, metes and bounds 
description, devise and testacy, map, plat, or other recorded instrument, regardless 
of whether the division includes all or a portion of a parcel or lot; and
(ii)
except as provided in Subsection 
(77)(c)
(79)(c)
, divisions of land for residential 
and nonresidential uses, including land used or to be used for commercial, 
agricultural, and industrial purposes.
(c)
"Subdivision" does not include:
(i)
a bona fide division or partition of land used for agricultural purposes as provided 
in Subsection 
10-20-808(2)
;
(ii)
a recorded conveyance document:
(A)
consolidating multiple lots or parcels into one legal description encompassing 
all lots by reference to a recorded plat and all parcels by metes and bounds 
description; or
(B)
joining a lot to a parcel;
(iii)
a bona fide division of land by deed or other instrument if the deed or other 
instrument states in writing that the division:
(A)
is in anticipation of future land use approvals on the parcel or parcels;
(B)
does not confer any land use approvals; and
(C)
has not been approved by the land use authority;
(iv)
a boundary adjustment;
(v)
a boundary establishment;
(vi)
a road, street, or highway dedication plat;
(vii)
a deed or easement for a road, street, or highway purpose; or
(viii)
any other division of land authorized by law.
(78)
(80)
(a)
"Subdivision amendment" means an amendment to a recorded subdivision 
in accordance with Section 
10-20-811
 that:
(i)
vacates all or a portion of the subdivision;
(ii)
increases the number of lots within the subdivision;
(iii)
alters a public right-of-way, a public easement, or public infrastructure within the 
subdivision; or
(iv)
alters a common area or other common amenity within the subdivision.
(b)
"Subdivision amendment" does not include a simple boundary adjustment.
(79)
(81)
"Substantial evidence" means evidence that:
(a)
is beyond a scintilla; and
(b)
a reasonable mind would accept as adequate to support a conclusion.
(80)
(82)
"Suspect soil" means soil that has:
(a)
a high susceptibility for volumetric change, typically clay rich, having more than a 
3% swell potential;
(b)
bedrock units with high shrink or swell susceptibility; or
(c)
gypsiferous silt and clay, gypsum, or bedrock units containing abundant gypsum 
commonly associated with dissolution and collapse features.
(81)
(83)
"Therapeutic school" means a residential group living facility:
(a)
for four or more individuals who are not related to:
(i)
the owner of the facility; or
(ii)
the primary service provider of the facility;
(b)
that serves students who have a history of failing to function:
(i)
at home;
(ii)
in a public school; or
(iii)
in a nonresidential private school; and
(c)
that offers:
(i)
room and board; and
(ii)
an academic education integrated with:
(A)
specialized structure and supervision; or
(B)
services or treatment related to a disability, an emotional development, a 
behavioral development, a familial development, or a social development.
(82)
(84)
"Transferable development right" means a right to develop and use land that 
originates by an ordinance that authorizes a 
land
property
 owner in a designated 
sending zone to transfer land use rights from a designated sending zone to a designated 
receiving zone.
(83)
(85)
"Unincorporated" means the area outside of the incorporated area of a city or 
town.
(84)
(86)
"Water interest" means any right to the beneficial use of water, including:
(a)
each of the rights listed in Section 
73-1-11
; and
(b)
an ownership interest in the right to the beneficial use of water represented by:
(i)
a contract; or
(ii)
a share in a water company, as defined in Section 
73-3-3.5
.
(85)
(87)
"Zoning map" means a map, adopted as part of a land use ordinance, that depicts 
land use zones, overlays, or districts.
Section 6. Section 
10-20-301
 is amended to read:
10-20-301
Effective 
05/06/26
. Ordinance establishing planning commission 
required -- Ordinance requirements -- Compensation.
(1)
(a)
Each municipality shall enact an ordinance establishing a planning commission.
(b)
The ordinance shall
 define
:
(i)
include 
the number and terms of the 
planning commission 
members and, if the 
municipality chooses, alternate members;
(ii)
the mode of appointment
provide procedures for appointing a planning 
commission member
;
(iii)
the
provide
 procedures for filling vacancies 
and 
on the planning commission;
(iv)
removal from office;
provide procedures for removing a planning commission 
member from the planning commission and specify that:
(A)
in a form of government described in Section 
10-3b-301
 or 
10-3b-401
, and 
subject to any delegation of authority under Subsection 
10-3b-303(1)
 or 
10-3b-403(1)
, the legislative body may remove a planning commission 
member; or
(B)
in a form of government described in Section 
10-3b-202
, the mayor may 
remove a planning commission member;
(v)
except as provided in Subsection 
(1)(b)(vi)
, describe the causes for which a 
planning commission member may be removed from the planning commission, 
which shall include:
(A)
using public funds for a political purpose under Title 20A, Chapter 11, Part 12, 
Political Activities of Public Entities Act;
(B)
violating a provision of Title 10, Chapter 3, Part 13, Municipal Officers' and 
Employees' Ethics Act; and
(C)
acting with the intent to influence a land use decision or an appeal of a 
pending land use application in a manner that creates actual impermissible bias 
or an unacceptable risk of impermissible bias in the planning commission 
member's administrative or quasi-judicial duties;
(vi)
provide that a planning commission member deliberating about a specific 
pending land use application in a planning commission meeting with municipal 
staff, an elected official, or the land use applicant is not cause for removing a 
planning commission member from the planning commission;
(vii)
provide requirements for when a planning commission member shall recuse 
oneself from deliberating or voting on certain land use applications;
(iv)
(viii)
define 
the authority of the planning commission;
(v)
(ix)
subject to Subsection 
(1)(c)
, 
the
include
 rules of order and procedure for 
use by the planning commission in a public meeting; and
(vi)
(x)
include 
other details relating to the organization and procedures of the 
planning commission.
(c)
Subsection 
(1)(b)(v) 
(1)(b)(ix) 
does not affect the planning commission's duty to 
comply with 
Title 52, Chapter 4, Open and Public Meetings Act
.
(2)
The legislative body may authorize a member to receive per diem and travel expenses 
for meetings actually attended, in accordance with Section 
11-55-103
.
Section 7. Section 
10-20-302
 is amended to read:
10-20-302
Effective 
05/06/26
. Planning commission powers and duties -- 
Training requirements.
(1)
The planning commission shall review and make a recommendation to the legislative 
body for:
(a)
a general plan and amendments to the general plan;
(b)
land use regulations, including:
(i)
ordinances regarding the subdivision of land within the municipality; and
(ii)
amendments to existing land use regulations;
(c)
an appropriate delegation of power to at least one designated land use authority to 
hear and act on a land use application;
(d)
an appropriate delegation of power to at least one appeal authority to hear and act on 
an appeal from a decision of the land use authority; and
(e)
application processes that:
(i)
may include a designation of routine land use matters that, upon application and 
proper notice, will receive informal streamlined review and action if the 
application is uncontested; and
(ii)
shall protect the right of each:
(A)
land use applicant and adversely affected party to require formal consideration 
of any application by a land use authority;
 and
(B)
land use applicant or adversely affected party to appeal a land use authority's 
decision to a separate appeal authority
; and
.
(C)
participant to be heard in each public hearing on a contested application.
(2)
Before making a recommendation to a legislative body on an item described in 
Subsection 
(1)(a)
 or 
(b)
, the planning commission shall hold a public hearing in 
accordance with Section 
10-20-405
.
(3)
A legislative body may adopt, modify, or reject a planning commission's 
recommendation to the legislative body under this section.
(4)
A legislative body may consider a planning commission's failure to make a timely 
recommendation as a negative recommendation.
(5)
(4)
Nothing in this section limits the right of a municipality to initiate or propose the 
actions described in this section.
(6)
(5)
(a)
(i)
This Subsection 
(6)
(5)
 applies to:
(A)
a city of the first, second, third, or fourth class; and
(B)
a city of the fifth class with a population of 5,000 or more, if the city is located 
within a county of the first, second, or third class.
(ii)
The population for each city described in Subsection 
(6)(a)(i)
(5)(a)(i)
 shall be 
derived from:
(A)
an estimate of the Utah Population Committee created in Section 
63C-20-103
; 
or
(B)
if the Utah Population Committee estimate is not available, the most recent 
official census or census estimate of the United States 
Bureau of the 
Census
Bureau
.
(b)
A municipality described in Subsection 
(6)(a)(i)
(5)(a)(i)
 shall ensure that each 
member of the municipality's planning commission completes four hours of annual 
land use training as follows:
(i)
one hour of annual training on general powers and duties
, including the role of the 
planning commission in administrative, legislative, and quasi-judicial functions
under this chapter; and
(ii)
three hours of annual training on
 a combination of
 land use
 and ethics topics
, 
which may include:
(A)
appeals and variances;
(B)
conditional use permits;
(C)
exactions;
(D)
impact fees;
(E)
vested rights;
(F)
subdivision regulations and improvement guarantees;
(G)
land use referenda;
(H)
property rights;
(I)
real estate procedures and financing;
(J)
zoning, including use-based and form-based;
 and
(K)
drafting ordinances and code that complies with statute
.
;
(L)
ex parte communication; and
(M)
conflict of interest.
(c)
A newly appointed planning commission member may not participate in a public 
meeting as an appointed member until the member completes the training described 
in Subsection 
(6)(b)(i)
(5)(b)(i)
.
(d)
A planning commission member may qualify for one completed hour of training 
required under Subsection 
(6)(b)(ii)
(5)(b)(ii)
 if the member attends, as an appointed 
member, 12 public meetings of the planning commission within a calendar year.
(e)
A municipality shall provide the training described in Subsection 
(6)(b)
(5)(b)
through:
(i)
municipal staff;
(ii)
the Utah League of Cities and Towns; or
(iii)
a list of training courses selected by:
(A)
the Utah League of Cities and Towns; or
(B)
the Division of Real Estate created in Section 
61-2-201
.
(f)
A municipality shall, for each planning commission member:
(i)
monitor compliance with the training requirements in Subsection 
(6)(b)
(5)(b)
; 
and
(ii)
maintain a record of training completion at the end of each calendar year.
Section 8. Section 
10-20-501
 is amended to read:
10-20-501
Effective 
05/06/26
. Enactment of land use regulation, land use 
decision, or development agreement.
(1)
Only a legislative body, as the body authorized to weigh policy considerations, may 
enact a land use regulation.
(2)
(a)
Except as provided in Subsection 
(2)(b)
, a legislative body may enact a land use 
regulation only by ordinance.
(b)
A legislative body may, by ordinance or resolution, enact a land use regulation that 
imposes a fee.
(3)
A legislative body shall ensure that a land use regulation is consistent with the purposes 
set forth in
of
 this chapter.
(4)
(a)
A legislative body shall adopt a land use regulation to:
(i)
create or amend a zoning district under Subsection 
10-20-503(1)(a)
; and
(ii)
designate general uses allowed in each zoning district.
(b)
A land use authority may establish or modify other restrictions or requirements other 
than those described in Subsection 
(4)(a)
, including the configuration or modification 
of uses or density, through a land use decision that applies criteria or policy elements 
that a land use regulation establishes or describes.
(5)
(a)
Except as provided in Subsection 
(5)(b)
 or (5)(c), a municipality shall publish on 
the municipality's website:
(i)
all of the municipality's land use regulations; and
(ii)
a fee schedule that lists all of the municipality's fees related to a land use 
application, land use permit, or land use regulation, including development review 
fees and impact fees.
(b)
A municipality that does not have a maintained and active website shall provide for 
inspection of the information described in Subsection 
(5)(a)
 at the municipality's 
place of business during normal business hours.
(c)
A municipality may comply with Subsection 
(5)(a)
 by:
(i)
posting a link on the municipality's website to a separate webpage or third-party 
website where the land use regulations or fee schedule described in Subsection 
(5)(a)
 are posted; and
(ii)
submitting a new or modified land use regulation or fee schedule described in 
Subsection 
(5)(a)
 to the third-party website within six months after the day on 
which the legislative body adopts the new or modified land use regulation or fee 
schedule.
(5)
(6)
A municipality may not adopt a land use regulation
,
 or
 development agreement, 
or 
make a 
land use decision
,
 that restricts the type of crop that may be grown in an area 
that is:
(a)
zoned agricultural; or
(b)
assessed under 
Title 59, Chapter 2, Part 5, Farmland Assessment Act
.
(6)
(7)
A municipal land use regulation pertaining to an airport or an airport influence area, 
as that term is defined in Section 
72-10-401
, is subject to 
Title 72, Chapter 10, Part 4, 
Airport Zoning Act
.
Section 9. Section 
10-20-502
 is amended to read:
10-20-502
Effective 
05/06/26
. Preparation and adoption of land use regulation.
(1)
A planning commission shall:
(a)
provide notice as required by Subsection 
10-20-205(1)(a)
 and, if applicable, 
Subsection 
10-20-205(4)
;
(b)
hold a public hearing on a proposed land use regulation;
(c)
if applicable, consider each written objection filed in accordance with Subsection 
10-20-205(5)
 before the public hearing; and
(d)
(i)
review and recommend to the legislative body a proposed land use regulation 
that represents the planning commission's recommendation for regulating the use 
and development of land within all or any part of the area of the municipality; and
(ii)
forward to the legislative body all objections filed in accordance with Subsection 
10-20-205(5)
.
(2)
(a)
A legislative body shall consider each proposed land use regulation that the 
planning commission recommends to the legislative body.
(b)
After providing notice as required by Subsection 
10-20-205(1)(b)
 and holding a 
public meeting, the legislative body may adopt or reject the land use regulation 
described in Subsection 
(2)(a)
:
(i)
as proposed by the planning commission; or
(ii)
after making any revision the legislative body considers appropriate.
(c)
A legislative body may consider a planning commission's failure to make a timely 
recommendation as a negative recommendation if the legislative body has provided 
for that consideration by ordinance.
(c)
Beginning on September 15, 2026, a legislative body may adopt or reject a proposed 
land use regulation without waiting for a recommendation from the planning 
commission if:
(i)
a land use applicant makes a request described in Subsection 
10-20-905(2)(b)
; or
(ii)
a legislative body determines that a planning commission has had adequate time 
to consider the land use regulation.
Section 10. Section 
10-20-507
 is amended to read:
10-20-507
Effective 
05/06/26
. Classification of new and unlisted business uses.
(1)
As used in this section:
(a)
"Classification request" means a request to determine whether a proposed business 
use aligns with an existing land use specified in a municipality's land use ordinances.
(b)
"New or unlisted business use" means a business activity that does not align with an 
existing land use specified in a municipality's land use ordinances.
(2)
(a)
Each municipality shall incorporate into the municipality's land use ordinances a 
process for reviewing and approving a new or unlisted business use and designating 
an appropriate zone or zones for an approved use.
(b)
The process described in Subsection 
(2)(a)
 shall:
(i)
detail how an applicant may submit a classification request;
(ii)
establish a procedure for the municipality to review a classification request, 
including:
(A)
providing a land use authority with criteria to determine whether a proposed 
use aligns with an existing use;
 and
(B)
allowing an applicant to proceed under the regulations of an existing use if a 
land use authority determines a proposed use aligns with that existing use;
 and
(C)
providing the applicant an opportunity to appeal a land use authority's decision 
to a land use appeal authority;
(iii)
provide that if a use is determined to be a new or unlisted business use:
(A)
the applicant shall submit 
to the legislative body for review 
an application 
for 
approval of the new or unlisted business use to the legislative body for review
requesting that the legislative body adopt a land use ordinance that permits the 
new or unlisted business as a permitted or conditional use
;
(B)
notwithstanding Subsection 
10-20-503(2)
 or 
(3)
, 
the legislative body shall 
consider and 
determine whether to 
approve or deny 
the new or unlisted 
business use
the application described in Subsection 
(2)(b)(iii)(A)
; and
(C)
the legislative body shall approve or deny 
the new or unlisted business use
the application described in Subsection 
(2)(b)(iii)(A)
, within a time frame the 
legislative body establishes by ordinance, if the applicant responds to requests 
for additional information within a time frame established by the municipality 
and appears at required hearings;
(iv)
provide that if the legislative body approves 
a proposed new or unlisted business 
use
the application described in Subsection 
(2)(b)(iii)(A)
, the legislative body 
shall designate an appropriate zone or zones for the approved use; and
(v)
provide that if the legislative body denies 
a proposed new or unlisted business use
the application described in Subsection 
(2)(b)(iii)(A)
, or if an applicant disagrees 
with the land use authority's classification of the proposed use, the legislative 
body shall:
(A)
notify the applicant in writing of each reason for the classification or denial; 
and
(B)
offer the applicant an opportunity to challenge the classification or denial 
through an administrative appeal process established by the municipality
notify 
the applicant of the process for appealing the legislative body's decision in 
accordance with Section 
10-20-1109
.
(c)
A municipality may not require an applicant who submits an application described in 
Subsection 
(2)(b)(iii)(A)
 to submit the application to the planning commission for 
consideration, review, or approval.
(3)
Each municipality shall amend each land use ordinance that contains a list of approved 
or prohibited business uses to include a reference to the process for petitioning to 
approve a new or unlisted business use, as described in Subsection 
(2)
.
Section 11. Section 
10-20-625
 is enacted to read:
10-20-625
Effective 
05/06/26
. Model homes and open houses.
(1)
As used in this section:
(a)
"Model home" means:
(i)
a single-family home that the homebuilder uses to promote the sale or lease of 
another single-family home; or
(ii)
a unit within a multi-family residential structure that the owner uses to promote 
the sale or lease of another unit within the multi-family residential structure.
(b)
"Open house" means an event held by a homeowner, including an event in 
association with a real estate agent, architect, builder, or developer, to showcase a 
home, including the outdoor landscaping around the home.
(2)
The legislative body of a municipality may not regulate a model home or open house 
differently than a residential use.
(3)
Any ordinance regulating a model home or an open house differently than a residential 
use is void.
Section 12. Section 
10-20-626
 is enacted to read:
10-20-626
Effective 
05/06/26
. Structure height.
(1)
A municipality may regulate:
(a)
the number of habitable stories that a structure may contain; and
(b)
the overall height of a structure.
(2)
If a land use authority approved a land use application for a commercial lodging 
structure on or before September 1, 2025, and the land use application is subject to land 
use regulations described in Subsection 
(1)
 that conflict, the land use authority may not 
limit the number of above-ground habitable stories the land use applicant builds within 
the maximum overall height that the land use authority approved for the structure.
Section 13. Section 
10-20-806
 is amended to read:
10-20-806
Effective 
05/06/26
. Review of subdivision applications and 
subdivision improvement plans.
(1)
As used in this section:
(a)
"Review cycle" means the occurrence of:
(i)
the applicant's submittal of a complete subdivision application;
(ii)
the municipality's review of that subdivision application;
(iii)
the municipality's response to that subdivision application, in accordance with 
this section; and
(iv)
the applicant's reply to the municipality's response that addresses each of the 
municipality's required modifications or requests for additional information.
(b)
"Subdivision application" means a land use application for the subdivision of land.
(c)
"Subdivision improvement plans" means the civil engineering plans associated with 
required infrastructure improvements and municipally controlled utilities required for 
a subdivision.
(d)
"Subdivision ordinance review" means review by a municipality to verify that a 
subdivision application meets the criteria of the municipality's ordinances.
(e)
"Subdivision plan review" means a review of the applicant's subdivision 
improvement plans and other aspects of the subdivision application to verify that the 
application complies with municipal ordinances and applicable installation standards 
and inspection specifications for infrastructure improvements.
(2)
The review cycle restrictions and requirements of this section do not apply to the review 
of subdivision applications affecting property within identified geological hazard areas.
(3)
(a)
A municipality may require a subdivision improvement plan to be submitted with 
a subdivision application.
(b)
A municipality may not require a subdivision improvement plan to be submitted with 
both a preliminary subdivision application and a final subdivision application.
(4)
(a)
The review cycle requirements of this section apply:
(i)
to the review of a preliminary subdivision application, if the municipality requires 
a subdivision improvement plan to be submitted with a preliminary subdivision 
application; or
(ii)
to the review of a final subdivision application, if the municipality requires a 
subdivision improvement plan to be submitted with a final subdivision application.
(b)
A municipality may not, outside the review cycle, engage in a substantive review of 
required infrastructure improvements or a municipally controlled utility.
(5)
(a)
A municipality shall complete the initial review of a complete subdivision 
application submitted for ordinance review for a residential subdivision for 
single-family dwellings, two-family dwellings, or town homes:
(i)
no later than 15 business days after the complete subdivision application is 
submitted, if the municipality has a population over 5,000; or
(ii)
no later than 30 business days after the complete subdivision application is 
submitted, if the municipality has a population of 5,000 or less.
(b)
A municipality shall maintain and publish a list of the items comprising the complete 
subdivision application, including:
(i)
the application;
(ii)
the owner's affidavit;
(iii)
an electronic copy of all plans in PDF format;
(iv)
the preliminary subdivision plat drawings; and
(v)
a breakdown of fees due upon approval of the application.
(6)
A municipality shall publish a list of the items that comprise a complete subdivision 
land use application.
(7)
A municipality shall complete a subdivision plan review of a subdivision improvement 
plan that is submitted with a complete subdivision application for a residential 
subdivision for single-family dwellings, two-family dwellings, or town homes:
(a)
within 20 business days after the complete subdivision application is submitted, if the 
municipality has a population over 5,000; or
(b)
within 40 business days after the complete subdivision application is submitted, if 
the municipality has a population of 5,000 or less.
(8)
(a)
In reviewing a subdivision application, a municipality may require:
(i)
additional information relating to an applicant's plans to ensure compliance with 
municipal ordinances and approved standards and specifications for construction 
of public improvements; and
(ii)
modifications to plans that do not meet current ordinances, applicable standards 
or specifications, or do not contain complete information.
(b)
A municipality's request for additional information or modifications to plans under 
Subsection 
(8)(a)(i)
 or (ii) shall be specific and include citations to ordinances, 
standards, or specifications that require the modifications to subdivision 
improvement plans, and shall be logged in an index of requested modifications or 
additions.
(c)
A municipality may not require more than four review cycles for a subdivision 
improvement plan review.
(d)
(i)
Subject to Subsection 
(8)(d)(ii)
, unless the change or correction is necessitated 
by the applicant's adjustment to a subdivision improvement plan or an update to a 
phasing plan that adjusts the infrastructure needed for the specific development, a 
change or correction not addressed or referenced in a municipality's subdivision 
improvement plan review is waived.
(ii)
A modification or correction necessary to protect public health and safety or to 
enforce state or federal law may not be waived.
(iii)
If an applicant makes a material change to a subdivision improvement plan, the 
municipality has the discretion to restart the review process at the first review of 
the subdivision improvement plan review, but only with respect to the portion of 
the subdivision improvement plan that the material change substantively affects.
(e)
(i)
This Subsection 
(8)(e)
 applies if an applicant does not submit a revised 
subdivision improvement plan within :
(A)
20 business days after the municipality requires a modification or correction, 
if the municipality has a population over 5,000; or
(B)
40 business days after the municipality requires a modification or correction, 
if the municipality has a population of 5,000 or less.
(ii)
If an applicant does not submit a revised subdivision improvement plan within the 
time specified in Subsection 
(8)(e)(i)
, a municipality has an additional 20 business 
days after the time specified in Subsection 
(7)
 to respond to a revised subdivision 
improvement plan.
(9)
After the applicant has responded to the final review cycle, and the applicant has 
complied with each modification requested in the municipality's previous review cycle, 
the municipality may not require additional revisions if the applicant has not materially 
changed the plan, other than changes that were in response to requested modifications or 
corrections.
(10)
(a)
In addition to revised plans, an applicant shall provide a written explanation in 
response to the municipality's review comments, identifying and explaining the 
applicant's revisions and reasons for declining to make revisions, if any.
(b)
The applicant's written explanation shall be comprehensive and specific, including 
citations to applicable standards and ordinances for the design and an index of 
requested revisions or additions for each required correction.
(c)
If an applicant fails to address a review comment in the response, the review cycle is 
not complete and the subsequent review cycle may not begin until all comments are 
addressed.
(11)
(a)
If, on the fourth or final review, a municipality fails to respond within 20 
business days, the municipality shall, upon request of the property owner, and within 
10 business days after the day on which the request is received:
(i)
(a)
for a dispute arising from the subdivision improvement plans, assemble an 
appeal panel in accordance with Subsection 
10-20-911(5)(d)
10-20-911(4)(d)
 to 
review and approve or deny the final revised set of plans; or
(ii)
(b)
for a dispute arising from the subdivision ordinance review, advise the 
applicant, in writing, of the deficiency in the application and of the right to appeal the 
determination to a designated appeal authority.
Section 14. Section 
10-20-807
 is amended to read:
10-20-807
Effective 
05/06/26
. Subdivision plat recording or development 
activity before required landscaping or infrastructure is completed -- Improvement 
completion assurance -- Improvement warranty.
(1)
As used in this section: 
(a)
"Private landscaping plan" means a proposal:
(i)
to install landscaping on a lot owned by a private individual or entity; and
(ii)
submitted to a municipality by the private individual or entity, or on behalf of a 
private individual or entity, that owns the lot.
(b)
"Public landscaping improvement" means landscaping that an applicant is required to 
install to comply with published installation and inspection specifications for public 
improvements that:
(i)
will be dedicated to and maintained by the municipality; or
(ii)
are associated with and proximate to trail improvements that connect to planned 
or existing public infrastructure.
(2)
A land use authority shall establish objective inspection standards for acceptance of a 
public landscaping improvement or infrastructure improvement that the land use 
authority requires.
(3)
(a)
Except as provided in Subsection 
(3)(d)
 or (e), before an applicant conducts any 
development activity or records a plat, the applicant shall:
(i)
complete any required public landscaping improvements or infrastructure 
improvements; or
(ii)
post an improvement completion assurance for any required public landscaping 
improvements or infrastructure improvements.
(b)
If an applicant elects to post an improvement completion assurance, the applicant 
shall
,
 in accordance with Subsection 
(5)
,
 provide completion assurance for:
(i)
completion of 100% of the required public landscaping improvements or 
infrastructure improvements; or
(ii)
if the municipality has inspected and accepted a portion of the public landscaping 
improvements or infrastructure improvements, 100% of the incomplete or 
unaccepted public landscaping improvements or infrastructure improvements.
(c)
A municipality shall:
(i)
establish a minimum of two acceptable forms of completion assurance;
(ii)
(A)
if an applicant elects to post an improvement completion assurance, allow 
the applicant to post an assurance that meets the conditions of this chapter and 
any local ordinances; and
(B)
beginning on May 7, 2025, 
if a municipality accepts cash deposits as a form of 
completion assurance and the applicant elects to post a 
new 
cash deposit as a 
form of completion assurance, place the cash deposit in an interest-bearing 
account upon receipt and return any earned interest to the applicant with the 
return of the completion assurance according to the conditions of this chapter 
and any local ordinances;
(iii)
establish a system for the partial release of an improvement completion 
assurance as portions of required public landscaping improvements or 
infrastructure improvements are completed and accepted in accordance with local 
ordinance; and
(iv)
issue or deny a building permit in accordance with Section 
10-20-1001
 based on 
the installation of public landscaping improvements or infrastructure 
improvements.
(d)
A municipality may not require an applicant to post an improvement completion 
assurance for:
(i)
public landscaping improvements or an infrastructure improvement that the 
municipality has previously inspected and accepted;
(ii)
infrastructure improvements that are private and not essential or required to meet 
the building code, fire code, flood or storm water management provisions, street 
and access requirements, or other essential necessary public safety improvements 
adopted in a land use regulation;
(iii)
in a municipality where ordinances require all infrastructure improvements 
within the area to be private, infrastructure improvements within a development 
that the municipality requires to be private;
(iv)
landscaping improvements that are not public landscaping improvements, unless 
the landscaping improvements and completion assurance are required under the 
terms of a development agreement;
(v)
a private landscaping plan;
(vi)
landscaping improvements or infrastructure improvements that an applicant 
elects to install at the applicant's own risk:
(A)
before the plat is recorded;
(B)
in accordance with inspections required by the municipality for the 
infrastructure improvement; and
(C)
in accordance with final civil engineering plan approval by the municipality; or
(vii)
any individual public landscaping improvement or individual infrastructure 
improvement when the individual public landscaping improvement or individual 
infrastructure improvement is also included as part of a separate improvement 
completion assurance.
(e)
(i)
A municipality may not:
(A)
prohibit an applicant from installing a public landscaping improvement or an 
infrastructure improvement when the municipality has approved final civil 
engineering plans for the development activity or plat for which the public 
landscaping improvement or infrastructure improvement is required; or
(B)
require an applicant to sign an agreement, release, or other document 
inconsistent with this chapter as a condition of posting an improvement 
completion assurance, security for an improvement warranty, or receiving a 
building permit.
(ii)
Notwithstanding Subsection 
(3)(e)(i)(A)
, public infrastructure improvements and 
infrastructure improvements that are installed by an applicant are subject to 
inspection by the municipality in accordance with the municipality's adopted 
inspection standards.
(f)
(i)
Each improvement completion assurance and improvement warranty posted by 
an applicant with a municipality shall be independent of any other improvement 
completion assurance or improvement warranty posted by the same applicant with 
the municipality.
(ii)
Subject to Section 
10-20-905
, if an applicant has posted a form of security with a 
municipality for more than one infrastructure improvement or public landscaping 
improvement, the municipality may not withhold acceptance of an applicant's 
required subdivision improvements, public landscaping improvement, 
infrastructure improvements, or the performance of warranty work for the same 
applicant's failure to complete a separate subdivision improvement, public 
landscaping improvement, infrastructure improvement, or warranty work under a 
separate improvement completion assurance or improvement warranty.
(4)
(a)
Except as provided in Subsection 
(4)(c)
, as a condition for increased density or 
other entitlement benefit not currently available under the existing zone, a 
municipality may require a completion assurance bond for landscaped amenities and 
common area that are dedicated to and maintained by a homeowners association.
(b)
Any agreement regarding a completion assurance bond under Subsection 
(4)(a)
between the applicant and the municipality shall be memorialized in a development 
agreement.
(c)
A municipality may not require a completion assurance bond for or dictate who 
installs or is responsible for the cost of the landscaping of residential lots or the 
equivalent open space surrounding single-family attached homes, whether platted as 
lots or common area.
(5)
The sum of the improvement completion assurance required under Subsections 
(3)
 and 
(4)
 may not exceed the sum of:
(a)
100% of the estimated cost of the public landscaping improvements or infrastructure 
improvements, as evidenced by an engineer's estimate or licensed contractor's bid; 
and
(b)
10% of the amount of the bond to cover administrative costs incurred by the 
municipality to complete the improvements, if necessary.
(6)
(a)
Upon an applicant's written request that the land use authority accept or reject the 
applicant's installation of required subdivision improvements or performance of 
warranty work as set forth in Section 
10-20-905
, and for the duration of each 
improvement warranty period, the municipality may require the applicant to:
(i)
execute an improvement warranty for the improvement warranty period; and
(ii)
post a cash deposit, surety bond, letter of credit, or other similar security, as 
required by the municipality, in the amount of up to 10% of the lesser of the:
(A)
municipal engineer's original estimated cost of completion; or
(B)
applicant's reasonable proven cost of completion.
(b)
A municipality may not require the payment of the deposit of the improvement 
warranty assurance described in Subsection 
(6)(a)(i)
 for an infrastructure 
improvement or public landscaping improvement before the applicant indicates 
through written request that the applicant has completed the infrastructure 
improvement or public landscaping improvement.
(7)
When a municipality accepts an improvement completion assurance for public 
landscaping improvements or infrastructure improvements for a development in 
accordance with Subsection 
(3)(c)(ii)
, the municipality may not deny an applicant a 
building permit if the development meets the requirements for the issuance of a building 
permit under the building code and fire code.
(8)
A municipality may not require the submission of a private landscaping plan as part of 
an application for a building permit.
(9)
The provisions of this section do not supersede the terms of a valid development 
agreement, an adopted phasing plan, or the 
state construction code
State Construction 
Code
.
Section 15. Section 
10-20-902
 is amended to read:
10-20-902
Effective 
05/06/26
. Applicant's entitlement to land use application 
approval -- Municipality's requirements and limitations -- Vesting upon submission of 
development plan and schedule.
(1)
(a)
(i)
An applicant who has submitted a complete land use application as 
described in Subsection 
(1)(c)
, including the payment of all application fees, is 
entitled to substantive review of the application under the land use regulations:
(A)
in effect on the date that the application is complete; and
(B)
applicable to the application or to the information shown on the application.
(ii)
An applicant is entitled to approval of a land use application if the application 
conforms to the requirements of the applicable land use regulations, land use 
decisions, and development standards in effect when the applicant submits a 
complete application and pays application fees, unless:
(A)
the land use authority, on the record, formally finds that a compelling, 
countervailing public interest would be jeopardized by approving the 
application and specifies the compelling, countervailing public interest in 
writing; or
(B)
in the manner provided by local ordinance and before the applicant submits 
the application, the municipality formally initiates proceedings to amend the 
municipality's land use regulations in a manner that would prohibit approval of 
the application as submitted.
(b)
The municipality shall process an application without regard to proceedings the 
municipality initiated to amend the municipality's ordinances as described in 
Subsection 
(1)(a)(ii)(B)
 if:
(i)
180 days have passed since the municipality initiated the proceedings; and
(ii)
(A)
the proceedings have not resulted in an enactment that prohibits approval 
of the application as submitted; or
(B)
during the 12 months before the municipality processing the application, or 
multiple applications of the same type, are impaired or prohibited under the 
terms of a temporary land use regulation adopted under Section 
10-20-504
.
(c)
A land use application is considered submitted and complete when the applicant 
provides the application in a form that complies with the requirements of applicable 
ordinances and pays all applicable fees.
(d)
A subsequent incorporation of a municipality or a petition that proposes the 
incorporation of a municipality does not affect a land use application approved by a 
county in accordance with Section 
17-79-803
.
(e)
Unless a phasing sequence is required in an executed development agreement, a 
municipality shall, without regard to any other separate and distinct land use 
application, accept and process a complete land use application.
(f)
The continuing validity of an approval of a land use application is conditioned upon 
the applicant proceeding after approval to implement the approval with reasonable 
diligence.
(g)
A municipality may not impose on an applicant who has submitted a complete 
application a requirement that is not expressed in:
(i)
this chapter;
(ii)
a municipal ordinance in effect on the date that the applicant submits a complete 
application, subject to Subsection 
10-20-902(1)(a)(ii)
; or
(iii)
a municipal specification for public improvements applicable to a subdivision or 
development that is in effect on the date that the applicant submits an application.
(h)
A municipality may not impose on a holder of an issued land use permit or a final, 
unexpired subdivision plat a requirement that is not expressed:
(i)
in a land use permit;
(ii)
on the subdivision plat;
(iii)
in a document on which the land use permit or subdivision plat is based;
(iv)
in the written record evidencing approval of the land use permit or subdivision 
plat;
(v)
in this chapter;
(vi)
in a municipal ordinance; or
(vii)
in a municipal specification for residential roadways in effect at the time a 
residential subdivision was approved.
(i)
Except as provided in Subsection 
(1)(j)
 or 
(k)
, a municipality may not withhold 
issuance of a certificate of occupancy or acceptance of subdivision improvements 
because of an applicant's failure to comply with a requirement that is not expressed:
(i)
in the building permit or subdivision plat, documents on which the building permit 
or subdivision plat is based, or the written record evidencing approval of the land 
use permit or subdivision plat; or
(ii)
in this chapter or the municipality's ordinances.
(j)
A municipality may not unreasonably withhold issuance of a certificate of occupancy 
where an applicant has met all requirements essential for the public health, public 
safety, and general welfare of the occupants, in accordance with this chapter, unless:
(i)
the applicant and the municipality have agreed in a written document to the 
withholding of a certificate of occupancy; or
(ii)
the applicant has not provided a financial assurance for required and uncompleted 
public landscaping improvements or infrastructure improvements in accordance 
with an applicable local ordinance.
(k)
A municipality may not conduct a final inspection required before issuing a 
certificate of occupancy for a residential unit that is within the boundary of an 
infrastructure financing district, as defined in Section 
17B-1-102
, until the applicant 
for the certificate of occupancy provides adequate proof to the municipality that any 
lien on the unit arising from the infrastructure financing district's assessment against 
the unit under Title 11, Chapter 42, Assessment Area Act, has been released after 
payment in full of the infrastructure financing district's assessment against that unit.
(l)
A municipality:
(i)
may require the submission of a private landscaping plan, as defined in Section 
10-20-807
, before landscaping is installed; and
(ii)
may not withhold an applicant's building permit or certificate of occupancy 
because the applicant has not submitted a private landscaping plan.
(2)
A municipality is bound by the terms and standards of applicable land use regulations 
and shall comply with mandatory provisions of those regulations.
(3)
(a)
Beginning on October 1, 2026, and except as provided in Subsection 
(3)(b)
, a 
municipality shall publish on the municipality's website an application checklist for 
each land use application type that includes a checklist of all required plans and 
documents that make a complete application.
(b)
A municipality that does have a maintained and active website shall provide for 
inspection of the information described in Subsection 
(3)(a)
 at the municipality's 
place of business during normal business hours.
(3)
(4)
A municipality may not, as a condition of land use application approval, require a 
person filing a land use application to obtain documentation regarding a school district's 
willingness, capacity, or ability to serve the development proposed in the land use 
application.
(4)
(5)
Upon a specified public agency's submission of a development plan and schedule as 
required in Subsection 
10-20-304(8)
 that complies with the requirements of that 
subsection, the specified public agency vests in the municipality's applicable land use 
maps, zoning map, hookup fees, impact fees, other applicable development fees, and 
land use regulations in effect on the date of submission.
(5)
(6)
(a)
If sponsors of a referendum timely challenge a project in accordance with 
Subsection 
20A-7-601(6)
, the project's affected owner may rescind the project's land 
use approval by delivering a written notice:
(i)
to the local clerk as defined in Section 
20A-7-101
; and
(ii)
no later than seven days after the day on which a petition for a referendum is 
determined sufficient under Subsection 
20A-7-607(5)
.
(b)
Upon delivery of a written notice described in Subsection 
(5)(a)
(6)(a)
 the following 
are rescinded and are of no further force or effect:
(i)
the relevant land use approval; and
(ii)
any land use regulation enacted specifically in relation to the land use approval.
(6)
(7)
(a)
After issuance of a building permit, a municipality may not:
(i)
change or add to the requirements expressed in the building permit, unless the 
change or addition is:
(A)
requested by the building permit holder; or
(B)
necessary to comply with an applicable state building code; or
(ii)
revoke the building permit or take action that has the effect of revoking the 
building permit.
(b)
Subsection 
(6)(a)
(7)(a)
 does not prevent a municipality from issuing a building 
permit that contains an expiration date defined in the building permit.
Section 16. Section 
10-20-910
 is amended to read:
10-20-910
Effective 
05/06/26
. Provisions applicable to a provider of culinary or 
secondary water.
A provider of culinary or secondary water that commits to provide a water service required 
by a land use application process is subject to the following as if it were a municipality:
(1)
Subsections 
10-20-904(5)
 and 
(6)
;
(2)
Section 
10-20-905
;
 and
(3)
Section 
10-20-911
; and
(4)
Section 
10-20-912
.
Section 17. Section 
10-20-911
 is amended to read:
10-20-911
Effective 
05/06/26
. Exactions -- Requirement to offer to original 
owner property acquired by exaction -- Exaction for right-of-way improvements -- 
Improvement completion assurance requirements.
(1)
A municipality may impose an exaction or exactions on development proposed in a land 
use application, including, subject to 
Subsection 
(3)
Section 
10-20-912
, an exaction for 
a water interest, if:
(a)
an essential link exists between a legitimate governmental interest and each exaction; 
and
(b)
each exaction is roughly proportionate, both in nature and extent, to the impact of the 
proposed development.
(2)
If a land use authority imposes an exaction for another governmental entity:
(a)
the governmental entity shall request the exaction; and
(b)
the land use authority shall transfer the exaction to the governmental entity for which 
it was exacted.
(3)
(a)
(i)
Subject to the requirements of this Subsection 
(3)
, a municipality shall base 
an exaction for a water interest on the culinary water authority's established 
calculations of projected water interest requirements.
(ii)
Except as described in Subsection 
(3)(a)(iii)
, a culinary water authority shall 
base an exaction for a culinary water interest on:
(A)
consideration of the system-wide minimum sizing standards established for 
the culinary water authority by the Division of Drinking Water in accordance 
with Section 
19-4-114
; and
(B)
the number of equivalent residential connections associated with the culinary 
water demand for each specific development proposed in the development's 
land use application, applying lower exactions for developments with lower 
equivalent residential connections as demonstrated by at least five years of 
usage data for like land uses within the municipality.
(iii)
A municipality may impose an exaction for a culinary water interest that results 
in less water being exacted than would otherwise be exacted under Subsection 
(3)(a)(ii)
 if the municipality, at the municipality's sole discretion, determines there 
is good cause to do so.
(iv)
(A)
A municipality shall make public the methodology used to comply with 
Subsection 
(3)(a)(ii)(B)
. 
(B)
A land use applicant may appeal to the municipality's governing body an 
exaction calculation used by the municipality under Subsection 
(3)(a)(ii)
. 
(C)
A land use applicant may present data and other information that illustrates a 
need for an exaction recalculation and the municipality's governing body shall 
respond with due process.
(v)
Upon an applicant's request, the culinary water authority shall provide the 
applicant with the basis for the culinary water authority's calculations under 
Subsection 
(3)(a)(i)
 on which an exaction for a water interest is based.
(b)
A municipality may not impose an exaction for a water interest if the culinary water 
authority's existing available water interests exceed the water interests needed to meet 
the reasonable future water requirement of the public, as determined under 
Subsection 
73-1-4(2)(f)
.
(4)
(3)
(a)
If a municipality plans to dispose of surplus real property that was acquired 
under this section and has been owned by the municipality for less than 15 years, the 
municipality shall first offer to reconvey the property, without receiving additional 
consideration, to the person who granted the property to the municipality.
(b)
A person to whom a municipality offers to reconvey property under Subsection 
(4)(a)
(3)(a)
 has 90 days to accept or reject the municipality's offer.
(c)
If a person to whom a municipality offers to reconvey property declines the offer, the 
municipality may offer the property for sale.
(d)
Subsection 
(4)(a)
(3)(a)
 does not apply to the disposal of property acquired by 
exaction by a community reinvestment agency.
(5)
(4)
(a)
A municipality may not, as part of an infrastructure improvement, require the 
installation of pavement on a residential roadway at a width in excess of 32 feet.
(b)
Subsection 
(5)(a)
(4)(a)
 does not apply if a municipality requires the installation of 
pavement in excess of 32 feet:
(i)
in a vehicle turnaround area;
(ii)
in a cul-de-sac;
(iii)
to address specific traffic flow constraints at an intersection, mid-block 
crossings, or other areas;
(iv)
to address an applicable general or master plan improvement, including 
transportation, bicycle lanes, trails, or other similar improvements that are not 
included within an impact fee area;
(v)
to address traffic flow constraints for service to or abutting higher density 
developments or uses that generate higher traffic volumes, including community 
centers, schools, and other similar uses;
(vi)
as needed for the installation or location of a utility which is maintained by the 
municipality and is considered a transmission line or requires additional roadway 
width;
(vii)
for third-party utility lines that have an easement preventing the installation of 
utilities maintained by the municipality within the roadway;
(viii)
for utilities over 12 feet in depth;
(ix)
for roadways with a design speed that exceeds 25 miles per hour;
(x)
as needed for flood and stormwater routing;
(xi)
as needed to meet fire code requirements for parking and hydrants; or
(xii)
as needed to accommodate street parking.
(c)
Nothing in this section shall be construed to prevent a municipality from approving a 
road cross section with a pavement width less than 32 feet.
(d)
(i)
A land use applicant may appeal a municipal requirement for pavement in 
excess of 32 feet on a residential roadway.
(ii)
A land use applicant that has appealed a municipal specification for a residential 
roadway pavement width in excess of 32 feet may request that the municipality 
assemble a panel of qualified experts to serve as the appeal authority for purposes 
of determining the technical aspects of the appeal.
(iii)
Unless otherwise agreed by the applicant and the municipality, the panel 
described in Subsection 
(5)(d)(ii)
(4)(d)(ii)
 shall consist of the following three 
experts:
(A)
one licensed engineer, designated by the municipality;
(B)
one licensed engineer, designated by the land use applicant; and
(C)
one licensed engineer, agreed upon and designated by the two designated 
engineers under Subsections 
(5)(d)(iii)(A)
(4)(d)(iii)(A)
 and 
(B)
.
(iv)
A member of the panel assembled by the municipality under Subsection 
(5)(d)(ii)
(4)(d)(ii)
 may not have an interest in the application that is the subject of 
the appeal.
(v)
The land use applicant shall pay:
(A)
50% of the cost of the panel; and
(B)
the municipality's published appeal fee.
(vi)
The decision of the panel is a final decision, subject to a petition for review under 
Subsection 
(5)(d)(vii)
(4)(d)(vii)
.
(vii)
In accordance with Section 
10-20-1109
, a land use applicant or the municipality 
may file a petition for review of the decision with the district court within 30 days 
after the date that the decision is final.
(6)
A provider of culinary or secondary water that commits to provide a water service 
required by a land use application process is subject to the provisions of this section the 
same as if the provider were a municipality.
Section 18. Section 
10-20-912
 is enacted to read:
10-20-912
Effective 
05/06/26
. Exactions for water rights.
(1)
Subject to the requirements of this section, a municipality shall base an exaction for a 
water interest on the culinary water authority's established calculations of projected 
water interest requirements.
(2)
Except as provided in Subsection 
(3)
, a culinary water authority shall base an exaction 
for a culinary water interest on:
(a)
consideration of the system-wide minimum sizing standards established for the 
culinary water authority by the Division of Drinking Water under Section 
19-4-114
; 
and
(b)
the number of equivalent residential connections associated with the culinary water 
demand for each specific development proposed in the development's land use 
application, applying lower exactions for developments with lower equivalent 
residential connections as demonstrated by at least five years of usage data for like 
land uses within the municipality.
(3)
If a municipality determines, in the sole discretion of the municipality, that good cause 
exists, the municipality may impose an exaction for a culinary water interest that results 
in less water being exacted than would otherwise be exacted under Subsection 
(2)
.
(4)
(a)
A municipality shall make public the methodology used to comply with 
Subsection 
(2)(b)
.
(b)
A land use applicant may submit a request to the municipality's legislative body to 
review an exaction calculation used by the municipality under Subsection 
(2)
.
(c)
A land use applicant may present data and other information that illustrates a need 
for an exaction recalculation and the municipality's legislative body shall respond 
with due process.
(5)
Upon an applicant's request, the culinary water authority shall provide the applicant 
with the basis for the culinary water authority's calculations under Subsection 
(2)
 on 
which an exaction for a water interest is based.
(6)
(a)
A municipality may not impose an exaction for a water interest if:
(i)
the culinary water authority's existing available water interests exceed the water 
interests needed to meet the reasonable future water requirement of the public; or
(ii)
the municipality or the municipality's culinary water authority does not have a 
written plan in accordance with Subsection 
(6)(b)
.
(b)
Beginning on January 1, 2028, a municipality shall determine the municipality's 
water interests needed to meet the reasonable future water requirement of the public 
by completing a written plan described in Subsection 
73-1-4(2)(f)
.
(7)
A provider of culinary or secondary water that commits to provide a water service 
required by a land use application process is subject to the provisions of this section and 
Section 
10-20-911
 the same as if the provider were a municipality.
Section 19. Section 
10-20-1001
 is amended to read:
10-20-1001
Effective 
05/06/26
. Enforcement -- Limitations on a municipality's 
ability to enforce an ordinance by withholding a permit or certificate.
(1)
(a)
A municipality or 
an adversely affected party
a land use applicant
 may, in 
addition to other remedies provided by law, institute:
(i)
injunctions, mandamus, abatement, or any other appropriate actions; or
(ii)
proceedings to prevent, enjoin, abate, or remove the unlawful building, use, or act.
(b)
A municipality need only establish the violation to obtain the injunction.
(2)
(a)
Except as provided in Subsections 
(3)
though
through
 (6), a municipality may 
enforce the municipality's ordinance by withholding a building permit or certificate 
of occupancy.
(b)
It is an infraction to erect, construct, reconstruct, alter, or change the use of any 
building or other structure within a municipality without approval of a building 
permit.
(c)
A municipality may not issue a building permit unless the plans of and for the 
proposed erection, construction, reconstruction, alteration, or use fully conform to all 
regulations then in effect.
(d)
A municipality may require an applicant to maintain and repair a temporary fire 
apparatus road during the construction of a structure accessed by the temporary fire 
apparatus road in accordance with the municipality's adopted standards.
(e)
A municipality may require temporary signs to be installed at each street intersection 
once construction of a new roadway allows passage by a motor vehicle.
(f)
A municipality may adopt and enforce any appendix of the International Fire Code, 
2021 Edition.
(3)
(a)
A municipality may not deny an applicant a building permit or certificate of 
occupancy because the applicant has not completed an infrastructure improvement:
(i)
unless the infrastructure improvement is essential to meet the requirements for the 
issuance of a building permit or certificate of occupancy under Title 15A, State 
Construction and Fire Codes Act; and
(ii)
for which the municipality has accepted an improvement completion assurance 
for a public landscaping improvement, as defined in Section 
10-20-807
, or an 
infrastructure improvement for the development.
(b)
For purposes of Subsection 
(3)(a)(i)
, notwithstanding Section 
15A-5-205.6
, 
infrastructure improvement that is essential means:
(i)
for a building permit:
(A)
operable fire hydrants installed in a manner that is consistent with the 
municipality's adopted engineering standards; and
(B)
for temporary roads used during construction, a properly compacted road base 
installed in a manner consistent with the municipality's adopted engineering 
standards;
(ii)
for a certificate of occupancy, at the discretion of the municipality, at least one of 
the following:
(A)
a permanent road;
(B)
a temporary road covered with asphalt or concrete; or
(C)
another method for accessing a structure consistent with Appendix D of the 
International Fire Code; and
(iii)
public infrastructure necessary for the health, life, and safety of the occupant.
(c)
A municipality may not adopt an engineering standard that requires an applicant to 
install a permanent road or a temporary road with asphalt or concrete before 
receiving a building permit.
(4)
A municipality may not deny an applicant a building permit or certificate of occupancy 
for failure to:
(a)
submit a private landscaping plan, as defined in Section 
10-20-807
; or
(b)
complete a landscaping improvement that is not a public landscaping improvement, 
as defined in Section 
10-20-807
.
(5)
A municipality may not withhold a building permit based on the lack of completion of a 
portion of a public sidewalk to be constructed within a public right-of-way serving a lot 
where a single-family or two-family residence or town home is proposed in a building 
permit application if an improvement completion assurance has been posted for the 
incomplete portion of the public sidewalk.
(6)
A municipality may not prohibit the construction of a single-family or two-family 
residence or town home, withhold recording a plat, or withhold acceptance of a public 
landscaping improvement, as defined in Section 
10-20-807
, or an infrastructure 
improvement based on the lack of installation of a public sidewalk if an improvement 
completion assurance has been posted for the public sidewalk.
(7)
A municipality may not redeem an improvement completion assurance securing the 
installation of a public sidewalk sooner than 18 months after the date the improvement 
completion assurance is posted.
(8)
A municipality shall allow an applicant to post an improvement completion assurance 
for a public sidewalk separate from an improvement completion assurance for:
(a)
another infrastructure improvement; or
(b)
a public landscaping improvement, as defined in Section 
10-20-807
.
(9)
A municipality may withhold a certificate of occupancy for a single-family or 
two-family residence or town home until the portion of the public sidewalk to be 
constructed within a public right-of-way and located immediately adjacent to the 
single-family or two-family residence or town home is completed and accepted by the 
municipality.
Section 20. Section 
10-20-1101
 is amended to read:
10-20-1101
Effective 
05/06/26
. Appeal authority required -- Condition 
precedent to judicial review -- Appeal authority duties.
(1)
(a)
Each
Subject to Subsection 
(1)(d)
, each
 municipality adopting a land use 
ordinance shall, by ordinance, establish one or more appeal authorities.
(b)
An appeal authority described in Subsection 
(1)(a)
 shall hear and decide:
(i)
requests for 
variances
a variance
 from 
the terms of
a
 land use 
ordinances
ordinance
;
(ii)
appeals from 
a 
land use 
decisions
decision
 applying
 a
 land use 
ordinances
ordinance
; and
(iii)
appeals from a fee charged in accordance with Section 
10-20-904
.
(c)
An appeal authority described in Subsection 
(1)(a)
 may not hear an appeal from the 
enactment of a land use regulation.
(d)
Beginning on July 1, 2026, a city described in Subsection 
10-20-302(5)(a)(i)
 may not 
designate the city's legislative body as an appeal authority.
(e)
Notwithstanding Subsection 
(1)(d)
, a legislative body shall continue to be the appeal 
authority for an appeal if:
(i)
a land use ordinance designated the legislative body as the appeal authority when 
the appellant filed the appeal; and
(ii)
the appellant filed the appeal on or before June 30, 2026.
(2)
As a condition precedent to judicial review, each adversely affected party 
or land use 
applicant 
shall timely and specifically challenge a land use authority's land use decision, 
in accordance with local ordinance.
(3)
An appeal authority described in Subsection 
(1)(a)
:
(a)
shall:
(i)
act in a quasi-judicial manner; and
(ii)
serve as the final arbiter of issues involving the interpretation or application of 
a 
land use 
ordinances
ordinance
; and
(b)
may not entertain an appeal of a matter in which the appeal authority, or any 
participating member, had first acted as the land use authority.
(4)
By ordinance, a municipality may:
(a)
designate a separate appeal authority to hear requests for variances than the appeal 
authority the municipality designates to hear appeals;
(b)
designate one or more separate appeal authorities to hear distinct types of appeals of 
land use authority decisions;
(c)
require an adversely affected party to present to an appeal authority every theory of 
relief that the adversely affected party can raise in district court;
 and
(d)
not require a land use applicant or adversely affected party to pursue duplicate or 
successive appeals before the same or separate appeal authorities as a condition of an 
appealing party's duty to exhaust administrative remedies; and
(e)
(d)
provide that specified types of land use decisions may be appealed directly to the 
district court.
(5)
A municipality may not
:
(a)
require a public hearing for a request for a variance or land use appeal
.
; or
(b)
require a land use applicant or adversely affected party to pursue successive appeals 
before the same or separate appeal authorities as a condition of an appealing party's 
duty to exhaust administrative remedies.
(6)
If the municipality establishes or, before the effective date of this chapter, has 
established a multiperson board, body, or panel to act as an appeal authority, at a 
minimum the board, body, or panel shall:
(a)
notify each of the members of the board, body, or panel of any meeting or hearing of 
the board, body, or panel;
(b)
provide each of the members of the board, body, or panel with the same information 
and access to municipal resources as any other member;
(c)
convene only if a quorum of the members of the board, body, or panel is present; and
(d)
act only upon the vote of a majority of the convened members of the board, body, or 
panel. 
Section 21. Section 
10-20-1105
 is repealed and reenacted to read:
10-20-1105
Effective 
05/06/26
. Burden of proof.
In an appeal described in this part:
(1)
if the appellant is a land use applicant, the appellant has the burden of proving that the 
land use authority's land use decision is illegal or is not supported by substantial 
evidence; or
(2)
if the appellant is an adversely affected party, the appellant has the burden of proving 
that the land use authority's land use decision is illegal, or that the factual findings are 
clearly erroneous.
Section 22. Section 
10-20-1106
 is amended to read:
10-20-1106
Effective 
05/06/26
. Due process.
(1)
Each
An
 appeal authority shall conduct each appeal and variance request as provided 
in local ordinance.
(2)
Each
An
 appeal authority shall respect the due process rights of 
each of the 
participants
an appeal participant
.
(3)
An appeal authority may only allow the following people to present or speak during an 
appeal hearing:
(a)
the appellant or the appellant's representatives;
(b)
the land use applicant or the land use applicant's representatives; and
(c)
the municipality's representatives.
Section 23. Section 
10-20-1107
 is amended to read:
10-20-1107
Effective 
05/06/26
. Scope of review of factual matters on appeal -- 
Appeal authority requirements.
(1)
A municipality may, by ordinance, designate the scope of review of factual matters for 
appeals of land use authority decisions.
(2)
If the municipality fails to designate a scope of review of factual matters, the appeal 
authority shall review the 
matter
factual matters
 de novo, without deference to the land 
use authority's determination of 
the 
factual matters.
(3)
If the scope of review of factual matters is on the record, the appeal authority shall 
determine whether the record on appeal includes substantial evidence for each essential 
finding of fact.
(4)
The appeal authority shall:
(a)
determine the correctness of the land use authority's interpretation and application of 
the plain meaning of the land use regulations; and
(b)
interpret and apply a land use regulation to favor a land use application unless the 
land use regulation plainly restricts the land use application.
(5)
(a)
An appeal authority's land use decision is a quasi-judicial act.
(b)
A
Except as provided in Subsection 
(5)(c)
, a
 legislative body may act as an appeal 
authority unless both the legislative body and the appealing party agree to allow a 
third party to act as the appeal authority.
(c)
Beginning on July 1, 2026, the legislative body of a city described in Subsection 
10-20-302(5)(a)(i)
 may not act as an appeal authority unless:
(i)
a land use ordinance designated the legislative body as the appeal authority when 
the appellant filed the appeal; and
(ii)
the appellant filed the appeal on or before June 30, 2026.
(6)
Only a decision in which a land use authority has applied a land use regulation to a 
particular land use application, person, or parcel may be appealed to an appeal authority.
Section 24. Section 
10-20-1109
 is amended to read:
10-20-1109
Effective 
05/06/26
. No district court review until administrative 
remedies exhausted -- Time for filing -- Tolling of time -- Standards governing court 
review -- Record on review -- Staying of decision.
(1)
No
A
 person may challenge in district court a land use decision 
until that
if the
 person 
has exhausted the person's administrative remedies as provided in this part, if applicable.
(2)
(a)
Subject to Subsection 
(1)
, a land use applicant or adversely affected party may file 
a petition for review of a land use decision with the district court within 30 days after 
the decision is final.
(b)
(i)
The time under Subsection 
(2)(a)
 to file a petition is tolled from the date a 
property owner files a request for arbitration of a constitutional taking issue with 
the property rights ombudsman under Section 
13-43-204
 until 30 days after:
(A)
the arbitrator issues a final award; or
(B)
the property rights ombudsman issues a written statement under Subsection 
13-43-204(3)(b)
 declining to arbitrate or to appoint an arbitrator.
(ii)
A tolling under Subsection 
(2)(b)(i)
 operates only as to the specific constitutional 
taking issue that is the subject of the request for arbitration filed with the property 
rights ombudsman by a property owner.
(iii)
A request for arbitration filed with the property rights ombudsman after the time 
under Subsection 
(2)(a)
 to file a petition has expired does not affect the time to 
file a petition.
(3)
(a)
A court shall:
(i)
presume that a land use regulation properly enacted under the authority of this 
chapter is valid; and
(ii)
determine only whether:
(A)
the land use regulation is expressly preempted by, or was enacted contrary to, 
state or federal law; and
(B)
it is reasonably debatable that the land use regulation is consistent with this 
chapter.
(b)
A court shall presume that a final land use decision of a land use authority or an 
appeal authority is valid unless the land use decision is:
(i)
arbitrary and capricious; or
(ii)
illegal.
(c)
(i)
A land use decision is arbitrary and capricious if the land use decision is not 
supported by substantial evidence in the record.
(ii)
A land use decision is illegal if the land use decision:
(A)
is based on an incorrect interpretation of a land use regulation;
(B)
conflicts with the authority granted by this title; or
(C)
is contrary to law.
(d)
(i)
A court may affirm or reverse a land use decision.
(ii)
If the court reverses a land use decision, the court shall remand the matter to the 
land use authority with instructions to issue a land use decision consistent with the 
court's ruling.
(4)
The provisions of Subsection 
(2)(a)
 apply from the date on which the municipality takes 
final action on a land use application, if the municipality conformed with the notice 
provisions of 
Part 2, Notice
, or for any person who had actual notice of the pending land 
use decision.
(5)
If the municipality has complied with Section 
10-20-205
, a challenge to the enactment 
of a land use regulation
 or
,
 general plan
, or specified land use law
 may not be filed 
with the district court more than 30 days after the enactment.
(6)
A challenge to a land use decision is barred unless the challenge is filed within 30 days 
after the land use decision is final.
(7)
(a)
The land use authority or appeal authority, as the case may be, shall transmit to 
the reviewing court the record of the proceedings of the land use authority or appeal 
authority, including the minutes, findings, orders, and, if available, a true and correct 
transcript of the proceedings.
(b)
If the proceeding was recorded, a transcript of that recording is a true and correct 
transcript for purposes of this Subsection 
(7)
.
(8)
(a)
(i)
If there is a record, the district court's review is limited to the record 
provided by the land use authority or appeal authority, as the case may be.
(ii)
The court may not accept or consider any evidence outside the record of the land 
use authority or appeal authority, as the case may be, unless that evidence was 
offered to the land use authority or appeal authority, respectively, and the court 
determines that the evidence was improperly excluded.
(b)
If there is no record, the court may call witnesses and take evidence.
(9)
(a)
The filing of a petition does not stay the land use decision of the land use 
authority or appeal authority, as the case may be.
(b)
(i)
Before filing a petition under this section or a request for mediation or 
arbitration of a constitutional taking issue under Section 
13-43-204
, a land use 
applicant may petition the appeal authority to stay the appeal authority's land use 
decision.
(ii)
Upon receipt of a petition to stay, the appeal authority may order the appeal 
authority's land use decision stayed pending district court review if the appeal 
authority finds the order to be in the best interest of the municipality.
(iii)
After a petition is filed under this section or a request for mediation or arbitration 
of a constitutional taking issue is filed under Section 
13-43-204
, the petitioner 
may seek an injunction staying the appeal authority's land use decision.
(10)
If the court determines that a party initiated or pursued a challenge to a land use 
decision on a land use application in bad faith, the court may award attorney fees.
Section 25. Section 
10-21-101
 is amended to read:
10-21-101
Effective 
05/06/26
. Definitions.
As used in this part:
(1)
"Accessory dwelling unit" means a habitable living unit added to, created within, or 
detached from a single-family dwelling and contained on one lot or parcel.
(2)
"Accessory structure" means a detached structure located on the same lot or parcel as a 
principal structure and is incidental and subordinate to the size and use of the principal 
structure.
(3)
"Affordable housing" means housing offered for sale at 80% or less of the median 
county home price for housing of that type.
(2)
(4)
"Agency" means the same as that term is defined in Section 
17C-1-102
.
(3)
(5)
"Applicable metropolitan planning organization" means the metropolitan planning 
organization that has jurisdiction over the area in which a fixed guideway public transit 
station is located.
(4)
(6)
"Applicable public transit district" means the public transit district, as defined in 
Section 
17B-2a-802
, of which a fixed guideway public transit station is included.
(5)
(7)
"Base taxable value" means a property's taxable value as shown upon the 
assessment roll last equalized during the base year.
(6)
(8)
"Base year" means, for a proposed home ownership promotion zone area, a year 
beginning the first day of the calendar quarter determined by the last equalized tax roll 
before the adoption of the home ownership promotion zone.
(9)
"Detached accessory dwelling unit" means an accessory dwelling unit that is not 
attached to or within a primary detached single-family dwelling and located on the same 
lot or parcel as the primary detached single-family dwelling.
(7)
(10)
"Division" means the Housing and Community Development Division within the 
Department of Workforce Services.
(8)
(11)
"Existing fixed guideway public transit station" means a fixed guideway public 
transit station for which construction begins before June 1, 2022.
(9)
(12)
"Fixed guideway" means the same as that term is defined in Section 
59-12-102
.
(10)
(13)
"Home ownership promotion zone" means a home ownership promotion zone 
created in accordance with this part.
(11)
(14)
"Implementation plan" means the implementation plan adopted as part of the 
moderate income housing element of a specified municipality's general plan as provided 
in Subsection 
10-21-201(4)
.
(12)
(15)
"Initial report" or "initial moderate income housing report" means the one-time 
report described in Subsection 
10-21-202(1)
.
(13)
(16)
"Internal accessory dwelling unit" means an accessory dwelling unit created:
(a)
within a primary dwelling;
(b)
within the footprint of the primary dwelling described in 
Subsection (13)(a)
Subsection 
(16)(a)
 at the time the internal accessory dwelling unit is created; and
(c)
for the purpose of offering a long-term rental of 30 consecutive days or longer.
(14)
(17)
"Moderate income housing strategy" means a strategy described in Subsection 
10-21-201(3)(a)(iii)
.
(15)
(18)
"New fixed guideway public transit station" means a fixed guideway public 
transit station for which construction begins on or after June 1, 2022.
(16)
(19)
"Participant" means the same as that term is defined in Section 
17C-1-102
.
(17)
(20)
"Participation agreement" means the same as that term is defined in Section 
17C-1-102
.
(18)
(21)
(a)
"Primary dwelling" means a single-family dwelling that:
(i)
is detached; and
(ii)
is occupied as the primary residence of the owner of record.
(b)
"Primary dwelling" includes a garage if the garage:
(i)
is a habitable space; and
(ii)
is connected to the primary dwelling by a common wall.
(19)
(22)
"Project improvements" means the same as that term is defined in Section 
11-36a-102
.
(20)
(23)
"Qualifying land use petition" means a petition:
(a)
that involves land located within a station area for an existing public transit station 
that provides rail services;
(b)
that involves land located within a station area for which the municipality has not yet 
satisfied the requirements of Subsection 
10-21-203(1)(a)
;
(c)
that proposes the development of an area greater than five contiguous acres, with no 
less than 51% of the acreage within the station area;
(d)
that would require the municipality to amend the municipality's general plan or 
change a zoning designation for the land use application to be approved;
(e)
that would require a higher density than the density currently allowed by the 
municipality;
(f)
that proposes the construction of new residential units, at least 10% of which are 
dedicated to moderate income housing; and
(g)
for which the land use applicant requests the municipality to initiate the process of 
satisfying the requirements of Subsection 
10-21-203(1)(a)
 for the station area in 
which the development is proposed, subject to Subsection 
10-21-203(2)(d)
.
(21)
(24)
"Report" means an initial report or a subsequent progress report.
(22)
(25)
"Specified municipality" means:
(a)
a city of the first, second, third, or fourth class; or
(b)
a city of the fifth class with a population of 5,000 or more, if the city is located 
within a county of the first, second, or third class.
(23)
(26)
(a)
"Station area" means:
(i)
for a fixed guideway public transit station that provides rail services, the area 
within a one-half mile radius of the center of the fixed guideway public transit 
station platform; or
(ii)
for a fixed guideway public transit station that provides bus services only, the 
area within a one-fourth mile radius of the center of the fixed guideway public 
transit station platform.
(b)
"Station area" includes any parcel bisected by the radius limitation described in 
Subsection (a)(i)
Subsection 
(26)(a)(i)
 or 
(ii)
.
(24)
(27)
"Station area plan" means a plan that:
(a)
establishes a vision, and the actions needed to implement that vision, for the 
development of land within a station area; and
(b)
is developed and adopted in accordance with this section.
(25)
(28)
"Subsequent progress report" means the annual report described in Subsection 
10-21-202(2)
.
(26)
(29)
"System improvements" means the same as that term is defined in Section 
11-36a-102
.
(27)
(30)
"Tax commission" means the State Tax Commission created in Section 
59-1-201
.
(28)
(31)
(a)
"Tax increment" means the difference between:
(i)
the amount of property tax revenue generated each tax year by a taxing entity from 
the area within a home ownership promotion zone, using the current assessed 
value and each taxing entity's current certified tax rate as defined in Section 
59-2-924
; and
(ii)
the amount of property tax revenue that would be generated from that same area 
using the base taxable value and each taxing entity's current certified tax rate as 
defined in Section 
59-2-924
.
(b)
"Tax increment" does not include property revenue from:
(i)
a multicounty assessing and collecting levy described in Subsection 
59-2-1602(2)
; 
or
(ii)
a county additional property tax described in Subsection 
59-2-1602(4)
.
(29)
(32)
"Taxing entity" means the same as that term is defined in Section 
17C-1-102
.
Section 26. Section 
10-21-304
 is enacted to read:
10-21-304
Effective 
10/01/26
. Detached accessory dwelling units.
(1)
(a)
A specified municipality shall adopt a land use regulation that permits a detached 
accessory dwelling unit on any lot or parcel that is 11,000 square feet or larger and 
contains a single-family dwelling, if the single-family dwelling is a permitted use on 
the lot or parcel.
(b)
This section does not prohibit a municipality from adopting a land use regulation that 
permits a detached accessory dwelling unit on a lot or parcel that is smaller than 
11,000 square feet.
(2)
A land use regulation described in Subsection 
(1)
 shall:
(a)
require that a detached accessory dwelling unit comply with all applicable building, 
health, and fire codes; and
(b)
include a process for the owner of a legally constructed accessory structure to 
convert the accessory structure to a detached accessory dwelling unit subject to 
applicable:
(i)
dwelling and accessory structure setback requirements; and
(ii)
building, health, and fire codes.
(3)
A land use regulation described in Subsection 
(1)
 may not:
(a)
require a conditional use permit for a detached accessory dwelling unit if the 
proposed detached accessory dwelling unit is located in a primarily residential zone;
(b)
require more than two on-site parking spaces assigned to a detached accessory 
dwelling unit that is 650 square feet or larger;
(c)
require more than one on-site parking space assigned to a detached accessory 
dwelling unit that is smaller than 650 square feet; or
(d)
include design standards for a detached accessory dwelling unit that conflict with 
Section 
10-20-618
.
(4)
A land use regulation described in Subsection 
(1)
 may:
(a)
require a detached accessory dwelling unit to:
(i)
conform to applicable land use regulations that regulate structure size, dimension, 
height, and maximum lot coverage;
(ii)
conform to setback requirements, that may take into account proximity to 
property lines and other structures, easements, window orientation, massing, or 
other elements; and
(iii)
be designed consistent with the design of the single-family dwelling;
(b)
prohibit a detached accessory dwelling unit from being:
(i)
larger in size than the single-family dwelling located on the same lot or parcel;
(ii)
located within a public utility easement or other recorded easement;
(iii)
located in a front-yard area of a lot or parcel; or
(iv)
rented for less than 90 consecutive days;
(c)
require that the owner of a lot or parcel where a detached accessory dwelling unit is 
located reside in the detached single-family dwelling or detached accessory dwelling 
unit located on the lot or parcel;
(d)
require that when a detached garage is converted to a detached accessory dwelling 
unit, any parking spaces required for the single-family dwelling that were located 
within the detached garage are replaced on-site;
(e)
prohibit more than one accessory dwelling unit on a lot or parcel; and
(f)
prohibit a detached accessory dwelling unit if:
(i)
the detached accessory dwelling unit will not have adequate access to a required 
utility service that is a project improvement, including sanitary sewer, culinary 
water, electrical, or storm water; or
(ii)
a utility service that is a system improvement, including sanitary sewer, culinary 
water, electrical, or storm water, to which the detached accessory dwelling unit is 
required to connect does not have sufficient capacity to support the addition of the 
detached accessory dwelling unit to the utility service system improvements.
(5)
This section does not supersede:
(a)
a land use regulation that regulates a detached accessory building that is not a 
detached accessory dwelling unit;
(b)
prohibitions or restrictions on detached accessory dwelling units in a development 
agreement signed by a municipality on or before May 6, 2026; or
(c)
a land use regulation or administrative action that:
(i)
is not prohibited by law; and
(ii)
relates to a detached accessory dwelling unit.
Section 27. Section 
13-43-205
 is amended to read:
13-43-205
Effective 
05/06/26
. Advisory opinion.
(1)
A local government, private entity, or a potentially aggrieved person may, in accordance 
with Section 
13-43-206
, request a written advisory opinion:
(a)
from a neutral third party to determine compliance with:
(i)
Sections 
10-20-506
, 
10-20-507
, 
10-20-602
, 
10-20-604
, 
10-20-605
, 
10-20-902
, 
10-20-904
, 
10-20-905
, 
10-20-910
, 
10-20-911
,
10-20-912
,
 and 
10-20-1003
;
(ii)
Sections 
17-79-506
, 
17-79-507
, 
17-79-601
, 
17-79-602
, 
17-79-603
, 
17-79-803
, 
17-79-804
, 
17-79-805
, 
17-79-811
, 
17-79-812
,
17-
79-813,
 and 
17-79-903
; and
(iii)
Title 11, Chapter 36a, Impact Fees Act
; and
(b)
at any time before:
(i)
a final decision on a land use application by a local appeal authority under 
Title 
11, Chapter 36a, Impact Fees Act
, or Section 
10-20-1108
 or 
17-79-1008
;
(ii)
the deadline for filing an appeal with the district court under 
Title 11, Chapter 
36a, Impact Fees Act
, or Section 
10-20-1109
 or 
17-79-1009
, if no local appeal 
authority is designated to hear the issue that is the subject of the request for an 
advisory opinion; or
(iii)
the enactment of an impact fee, if the request for an advisory opinion is a request 
to review and comment on a proposed impact fee facilities plan or a proposed 
impact fee analysis as defined in Section 
11-36a-102
.
(2)
A private property owner may, in accordance with Section 
13-43-206
, request a written 
advisory opinion from a neutral third party to determine if a condemning entity:
(a)
is in occupancy of the owner's property;
(b)
is occupying the property:
(i)
for a public use authorized by law; and
(ii)
without colorable legal or equitable authority; and
(c)
continues to occupy the property without the owner's consent, the occupancy would 
constitute a taking of private property for a public use without just compensation.
(3)
An advisory opinion issued under Subsection 
(2)
 may justify an award of attorney fees 
against a condemning entity in accordance with Section 
13-43-206
 only if the court 
finds that the condemning entity:
(a)
does not have a colorable claim or defense for the entity's actions; and
(b)
continued occupancy without payment of just compensation and in disregard of the 
advisory opinion.
Section 28. Section 
17-79-102
 is amended to read:
17-79-102
Effective 
05/06/26
. Definitions.
As used in this chapter:
(1)
"Accessory dwelling unit" means a habitable living unit added to, created within, or 
detached from a primary single-family dwelling and contained on one lot.
(2)
"Adversely affected party" means a person other than a land use applicant who:
(a)
owns real property adjoining the property that is the subject of a land use application 
or land use decision; or
(b)
will suffer a damage different in kind than, or an injury distinct from, that of the 
general community as a result of the land use decision.
(3)
"Affected entity" means a county, municipality, special district, special service district 
under Title 
17D, Chapter 1
, Special Service District Act, school district, interlocal 
cooperation entity established under Title 
11, Chapter 13
, Interlocal Cooperation Act, 
specified property owner, property owner's association, public utility, or the Department 
of Transportation, if:
(a)
the entity's services or facilities are likely to require expansion or significant 
modification because of an intended use of land;
(b)
the entity has filed with the county a copy of the entity's general or long-range plan; 
or
(c)
the entity has filed with the county a request for notice during the same calendar year 
and before the county provides notice to an affected entity in compliance with a 
requirement imposed under this chapter.
(4)
"Affected owner" means the owner of real property that is:
(a)
a single project;
 and
(b)
the subject of a land use approval that
:
(i)
sponsors of a referendum timely challenged in accordance with Subsection 
20A-7-601(6)
; and
(c)
(ii)
is 
determined to be legally referable under Section 
20A-7-602.8
.
(5)
"Appeal authority" means the person, board, commission, agency, or other body 
designated by ordinance to decide an appeal of a decision of a land use application or a 
variance.
(6)
"Billboard" means a freestanding ground sign located on industrial, commercial, or 
residential property if the sign is designed or intended to direct attention to a business, 
product, or service that is not sold, offered, or existing on the property where the sign is 
located.
(7)
"Building code adoption cycle" means the period of time beginning the day on which a 
specific edition of a construction code from a nationally recognized code authority is 
adopted and effective in Title 
15A, State Construction and Fire Codes Act
, until the day 
before a new edition of a construction code is adopted and effective in Title 
15A, State 
Construction and Fire Codes Act
.
(8)
(7)
(a)
"Boundary adjustment" means an agreement between adjoining property 
owners to relocate a common boundary that results in a conveyance of property 
between the adjoining lots, adjoining parcels, or adjoining lots and parcels.
(b)
"Boundary adjustment" does not mean a modification of a lot or parcel boundary that:
(i)
creates an additional lot or parcel; or
(ii)
is made by the Department of Transportation.
(9)
(8)
(a)
"Boundary establishment" means an agreement between adjoining property 
owners to clarify the location of an ambiguous, uncertain, or disputed common 
boundary.
(b)
"Boundary establishment" does not mean a modification of a lot or parcel boundary 
that:
(i)
creates an additional lot or parcel; or
(ii)
is made by the Department of Transportation.
(9)
"Building code adoption cycle" means the period of time beginning the day on which a 
specific edition of a construction code from a nationally recognized code authority is 
adopted and effective in Title 15A, State Construction and Fire Codes Act, until the day 
before a new edition of a construction code is adopted and effective in Title 15A, State 
Construction and Fire Codes Act.
(10)
(a)
"Charter school" means:
(i)
an operating charter school;
(ii)
a charter school applicant that a charter school authorizer approves in accordance 
with Title 
53G, Chapter 5, Part 3
, Charter School Authorization; or
(iii)
an entity that is working on behalf of a charter school or approved charter 
applicant to develop or construct a charter school building.
(b)
"Charter school" does not include a therapeutic school.
(11)
"Chief executive officer" means the person or body that exercises the executive powers 
of the county.
(12)
"Conditional use" means a land use that, because of the unique characteristics or 
potential 
detrimental 
impact of the land use on the county, surrounding neighbors, or 
adjacent land uses, may not be compatible in some areas or may be compatible only if 
certain conditions are required that mitigate or eliminate the detrimental impacts.
(13)
"Constitutional taking" means a governmental action that results in a taking of private 
property 
so that
where
 compensation to the 
property 
owner
 of the property
 is required 
by the:
(a)
Fifth or Fourteenth Amendment 
of
to
 the Constitution of the United States; or
(b)
Utah Constitution, Article I, Section 22.
(14)
"Conveyance document" means an instrument that:
(a)
meets the definition of "document" in Section 
57-1-1
; and
(b)
meets the requirements of Section 
57-1-45.5
.
(15)
"Conveyance of property" means the transfer of ownership of any portion of real 
property from one person to another person.
(16)
"County utility easement" means an easement that:
(a)
a plat recorded in a county recorder's office described as a county utility easement or 
otherwise as a utility easement;
(b)
is not a protected utility easement or a public utility easement as defined in Section 
54-3-27
;
(c)
the county or the county's affiliated governmental entity owns or creates; and
(d)
(i)
either:
(A)
no person uses or occupies; or
(B)
the county or the county's affiliated governmental entity uses and occupies to 
provide a utility service, including sanitary sewer, culinary water, electrical, 
storm water, or communications or data lines; or
(ii)
a person uses or occupies with or without an authorized franchise or other 
agreement with the county.
(17)
"Culinary water authority" means the department, agency, or public entity with 
responsibility to review and approve the feasibility of the culinary water system and 
sources for the subject property.
(18)
"Department of Transportation" means the entity created in Section 
72-1-201
.
(19)
"Development activity" means:
(a)
any construction or expansion of a building, structure, or use that creates additional 
demand and need for public facilities;
(b)
any change in use of a building or structure that creates additional demand and need 
for public facilities; or
(c)
any change in the use of land that creates additional demand and need for public 
facilities.
(20)
(a)
"Development agreement" means a written agreement or amendment to a written 
agreement between a county and one or more parties that regulates or controls the use 
or development of a specific area of land.
(b)
"Development agreement" does not include an improvement completion assurance.
(21)
(a)
"Disability" means a physical or mental impairment that substantially limits one 
or more of a person's major life activities, including a person having a record of such 
an impairment or being regarded as having such an impairment.
(b)
"Disability" does not include current illegal use of, or addiction to, any federally 
controlled substance, as defined in Section 102 of the Controlled Substances Act, 21 
U.S.C. Sec. 802.
(22)
"Document" means the same as that term is defined in Section 
57-1-1
.
(23)
"Educational facility":
(a)
means:
(i)
a school district's building at which pupils assemble to receive instruction in a 
program for any combination of grades from preschool through grade 12, 
including kindergarten and a program for children with disabilities;
(ii)
a structure or facility:
(A)
located on the same property as a building described in Subsection 
(23)(a)(i)
; 
and
(B)
used in support of the use of that building; and
(iii)
a building to provide office and related space to a school district's administrative 
personnel; and
(b)
does not include:
(i)
land or a structure, including land or a structure for inventory storage, equipment 
storage, food processing or preparing, vehicle storage or maintenance, or similar 
use that is:
(A)
not located on the same property as a building described in Subsection 
(23)(a)(i)
; and
(B)
used in support of the purposes of a building described in Subsection 
(23)(a)(i)
; 
or
(ii)
a therapeutic school.
(24)
"Establishment document" means an instrument that:
(a)
meets the definition of "document" in Section 
57-1-1
; and
(b)
meets the requirements of Section 
57-1-45
.
(25)
"Full boundary adjustment" means a boundary adjustment that is not a simple 
boundary adjustment.
(26)
(25)
"Fire authority" means the department, agency, or public entity with 
responsibility to review and approve the feasibility of fire protection and suppression 
services for the subject property.
(27)
(26)
"Flood plain" means land that:
(a)
is within the 100-year flood plain designated by the Federal Emergency Management 
Agency; or
(b)
has not been studied or designated by the Federal Emergency Management Agency 
but presents a likelihood of experiencing chronic flooding or a catastrophic flood 
event because the land has characteristics that are similar to those of a 100-year flood 
plain designated by the Federal Emergency Management Agency.
(27)
"Full boundary adjustment" means a boundary adjustment that is not a simple 
boundary adjustment.
(28)
"Gas corporation" has the same meaning as defined in Section 
54-2-1
.
(29)
"General plan" means a document that a county adopts that sets forth general 
guidelines for proposed future development of:
(a)
the unincorporated land within the county; or
(b)
for a mountainous planning district, the land within the mountainous planning 
district.
(30)
"Geologic hazard" means:
(a)
a surface fault rupture;
(b)
shallow groundwater;
(c)
liquefaction;
(d)
a landslide;
(e)
a debris flow;
(f)
unstable soil;
(g)
a rock fall; or
(h)
any other geologic condition that presents a risk:
(i)
to life;
(ii)
of substantial loss of real property; or
(iii)
of substantial damage to real property.
(31)
"Home-based microschool" means the same as that term is defined in Section 
53G-6-201
.
(32)
"Hookup fee" means a fee for the installation and inspection of any pipe, line, meter, 
or appurtenance to connect to a county water, sewer, storm water, power, or other utility 
system.
(33)
(a)
"Identical plans" means floor plans submitted to a county that:
(i)
are submitted within the same building code adoption cycle as floor plans that 
were previously approved by the county;
(ii)
have no structural differences from floor plans that were previously approved by 
the county; and
(iii)
describe a building that:
(A)
is located on land zoned the same as the land on which the building described 
in the previously approved plans is located;
(B)
has a substantially identical floor plan to a floor plan previously approved by 
the county; and
(C)
does not require any engineering or analysis beyond a review to confirm the 
submitted floor plans are substantially identical to a floor plan previously 
approved by the county or a review of the site plan and associated geotechnical 
reports for the site.
(b)
"Identical plans" include floor plans that are oriented differently as the floor plan that 
was previously approved by the county.
(34)
"Impact fee" means a payment of money imposed under Title 
11, Chapter 36a
, Impact 
Fees Act.
(35)
"Improvement completion assurance" means a surety bond, letter of credit, financial 
institution bond, cash, assignment of rights, lien, or other equivalent security required by 
a county to guaranty the proper completion of landscaping or an infrastructure 
improvement required as a condition precedent to:
(a)
recording a subdivision plat; or
(b)
development of a commercial, industrial, mixed use, or multifamily project.
(36)
"Improvement warranty" means an applicant's unconditional warranty that the 
applicant's installed and accepted landscaping or infrastructure improvement:
(a)
complies with the county's written standards for design, materials, and workmanship; 
and
(b)
will not fail in any material respect, as a result of poor workmanship or materials, 
within the improvement warranty period.
(37)
"Improvement warranty period" means a period:
(a)
no later than one year after a county's acceptance of required public landscaping; or
(b)
no later than one year after a county's acceptance of required infrastructure, unless 
the county:
(i)
determines, based on accepted industry standards and for good cause, that a 
one-year period would be inadequate to protect the public health, safety, and 
welfare; and
(ii)
has substantial evidence, on record:
(A)
of prior poor performance by the applicant; or
(B)
that the area upon which the infrastructure will be constructed contains 
suspect soil and the county has not otherwise required the applicant to mitigate 
the suspect soil.
(38)
"Infrastructure improvement" means permanent infrastructure that is essential for the 
public health and safety or that:
(a)
is required for human consumption; and
(b)
an applicant shall install:
(i)
in accordance with published installation and inspection specifications for public 
improvements; and
(ii)
as a condition of:
(A)
recording a subdivision plat;
(B)
obtaining a building permit; or
(C)
developing a commercial, industrial, mixed use, condominium, or multifamily 
project.
(39)
"Internal lot restriction" means a platted note, platted demarcation, or platted 
designation that:
(a)
runs with the land; and
(b)
(i)
creates a restriction that is enclosed within the perimeter of a lot described on 
the plat; or
(ii)
designates a development condition that is enclosed within the perimeter of a lot 
described on the plat.
(40)
"Interstate pipeline company" means a person or entity engaged in natural gas 
transportation subject to the jurisdiction of the Federal Energy Regulatory Commission 
under the Natural Gas Act, 15 U.S.C. Sec. 717 et seq.
(41)
"Intrastate pipeline company" means a person or entity engaged in natural gas 
transportation that is not subject to the jurisdiction of the Federal Energy Regulatory 
Commission under the Natural Gas Act, 15 U.S.C. Sec. 717 et seq.
(42)
"Land use applicant" means a property owner, or the property owner's designee, who 
submits a land use application regarding the property owner's land.
(43)
"Land use application":
(a)
means an application that is:
(i)
required by a county; and
(ii)
submitted by a land use applicant to obtain a land use decision; and
(b)
does not mean an application to enact, amend, or repeal a land use regulation.
(44)
"Land use authority" means:
(a)
a person, board, commission, agency, or body, including the local legislative body, 
designated by the local legislative body to act upon a land use application; or
(b)
if the local legislative body has not designated a person, board, commission, agency, 
or body, the local legislative body.
(45)
"Land use decision" means an administrative decision of a land use authority or appeal 
authority regarding:
(a)
a land use permit;
(b)
a land use application; or
(c)
the enforcement of a land use regulation, land use permit, or development agreement.
(46)
"Land use permit" means a permit issued by a land use authority.
(47)
"Land use regulation":
(a)
means a legislative decision enacted by ordinance, law, code, map, resolution, 
engineering or development standard, specification for public improvement, fee, or 
rule that governs the use or development of land;
(b)
includes the adoption or amendment of a zoning map or the text of the zoning code; 
and
(c)
does not include:
(i)
a land use decision of the legislative body acting as the land use authority, even if 
the decision is expressed in a resolution or ordinance; or
(ii)
a temporary revision to an engineering specification that does not materially:
(A)
increase a land use applicant's cost of development compared to the existing 
specification; or
(B)
impact a land use applicant's use of land.
(48)
"Legislative body" means the county legislative body, or for a county that has adopted 
an alternative form of government, the body exercising legislative powers.
(49)
"Lot" means a tract of land, regardless of any label, that is created by and shown on a 
subdivision plat that has been recorded in the office of the county recorder.
(50)
"Major transit investment corridor" means public transit service that uses or occupies:
(a)
public transit rail right-of-way;
(b)
dedicated road right-of-way for the use of public transit, such as bus rapid transit; or
(c)
fixed-route bus corridors subject to an interlocal agreement or contract between a 
municipality or county and:
(i)
a public transit district as defined in Section 
17B-2a-802
; or
(ii)
an eligible political subdivision as defined in Section 
59-12-2202
.
(51)
"Micro-education entity" means the same as that term is defined in Section 
53G-6-201
.
(52)
"Moderate income housing" means housing occupied or reserved for occupancy by 
households with a gross household income equal to or less than 80% of the median gross 
income for households of the same size in the county in which the housing is located.
(53)
"Mountainous planning district" means an area designated by a county legislative body 
in accordance with Section 
17-79-408
.
(54)
"Nominal fee" means a fee that reasonably reimburses a county only for time spent and 
expenses incurred in:
(a)
verifying that building plans are identical plans; and
(b)
reviewing and approving those minor aspects of identical plans that differ from the 
previously reviewed and approved building plans.
(55)
"Noncomplying structure" means a structure that:
(a)
legally existed before the structure's current land use designation; and
(b)
because of one or more subsequent land use ordinance changes, does not conform to 
the setback, height restrictions, or other regulations, excluding those regulations that 
govern the use of land.
(56)
"Nonconforming use" means a use of land that:
(a)
legally existed before the
 land's
 current land use designation;
(b)
has been maintained continuously since the time the land use ordinance regulation 
governing the land changed; and
(c)
because of one or more subsequent land use ordinance changes, does not conform to 
the regulations that now govern the use of the land.
(57)
"Official map" means a map drawn by county authorities and recorded in the county 
recorder's office that:
(a)
shows actual and proposed rights-of-way, centerline alignments, and setbacks for 
highways and other transportation facilities;
(b)
provides a basis for restricting development in designated rights-of-way or between 
designated setbacks to allow the government authorities time to purchase or 
otherwise reserve the land; and
(c)
has been adopted as an element of the county's general plan.
(58)
"Parcel" means any real property that is not a lot.
(59)
"Person" means an individual, corporation, partnership, organization, association, trust, 
governmental agency, or any other legal entity.
(60)
"Plan for moderate income housing" means a written document adopted by a county 
legislative body that includes:
(a)
an estimate of the existing supply of moderate income housing located within the 
county;
(b)
an estimate of the need for moderate income housing in the county for the next five 
years;
(c)
a survey of total residential land use;
(d)
an evaluation of how existing land uses and zones affect opportunities for moderate 
income housing; and
(e)
a description of the county's program to encourage an adequate supply of moderate 
income housing.
(61)
"Planning advisory area" means a contiguous, geographically defined portion of the 
unincorporated area of a county established under this part with planning and zoning 
functions as exercised through the planning advisory area planning commission, as 
provided in this chapter, but with no legal or political identity separate from the county 
and no taxing authority.
(62)
"Plat" means an instrument subdividing property into lots as depicted on a map or 
other graphical representation of lands that a licensed professional land surveyor makes 
and prepares in accordance with Section 
17-79-703
 or 
57-8-13
.
(63)
"Potential geologic hazard area" means an area that:
(a)
is designated by a Utah Geological Survey map, county geologist map, or other 
relevant map or report as needing further study to determine the area's potential for 
geologic hazard; or
(b)
has not been studied by the Utah Geological Survey or a county geologist but 
presents the potential of geologic hazard because the area has characteristics similar 
to those of a designated geologic hazard area.
(64)
"Property owner" means a person that holds legal title in real property.
(64)
(65)
"Public agency" means:
(a)
the federal government;
(b)
the state;
(c)
a county, municipality, school district, special district, special service district, or 
other political subdivision of the state; or
(d)
a charter school.
(65)
(66)
"Public hearing" means a hearing at which members of the public are provided a 
reasonable opportunity to comment on the subject of the hearing.
(66)
(67)
"Public meeting" means a meeting that is required to be open to the public under 
Title 
52, Chapter 4
, Open and Public Meetings Act.
(67)
(68)
"Public street" means a public right-of-way, including a public highway, public 
avenue, public boulevard, public parkway, public road, public lane, public alley, public 
viaduct, public subway, public tunnel, public bridge, public byway, other public 
transportation easement, or other public way.
(68)
(69)
"Receiving zone" means an unincorporated area that a county designates, by 
ordinance, as an area in which an owner of land may receive a transferable development 
right.
(69)
(70)
"Record of survey map" means a map of a survey of land prepared in accordance 
with Section 
17-73-504
.
(70)
(71)
"Residential facility for persons with a disability" means a residence:
(a)
in which more than one person with a disability resides; and
(b)
which is licensed or certified by the Department of Health and Human Services 
under:
(i)
Title 
26B, Chapter 2, Part 1
, Human Services Programs and Facilities; or
(ii)
Title 
26B, Chapter 2, Part 2
, Health Care Facility Licensing and Inspection.
(71)
(72)
"Residential roadway" means a public local residential road that:
(a)
will serve primarily to provide access to adjacent primarily residential areas and 
property;
(b)
is designed to accommodate minimal traffic volumes or vehicular traffic;
(c)
is not identified as a supplementary to a collector or other higher system classified 
street in an approved municipal street or transportation master plan;
(d)
has a posted speed limit of 25 miles per hour or less;
(e)
does not have higher traffic volumes resulting from connecting previously separated 
areas of the municipal road network;
(f)
cannot have a primary access, but can have a secondary access, and does not abut lots 
intended for high volume traffic or community centers, including schools, recreation 
centers, sports complexes, or libraries; and
(g)
primarily serves traffic within a neighborhood or limited residential area and is not 
necessarily continuous through several residential areas.
(72)
(73)
"Rules of order and procedure" means a set of rules that govern and prescribe in 
a public meeting:
(a)
parliamentary order and procedure;
(b)
ethical behavior; and
(c)
civil discourse.
(73)
(74)
"Sanitary sewer authority" means the department, agency, or public entity with 
responsibility to review and approve the feasibility of sanitary sewer services or onsite 
wastewater systems.
(74)
(75)
"Sending zone" means an unincorporated area that a county designates, by 
ordinance, as an area from which an owner of land may transfer a transferable 
development right.
(75)
(76)
"Simple boundary adjustment" means a boundary adjustment that does not:
(a)
affect a public right-of-way, county utility easement, or other public property;
(b)
affect an existing easement, onsite wastewater system, or an internal lot restriction; or
(c)
result in a lot or parcel out of conformity with land use regulations.
(76)
(77)
"Site plan" means a document or map that may be required by a county during a 
preliminary review before the issuance of a building permit to demonstrate that an 
owner's or developer's proposed development activity meets a land use requirement.
(77)
(78)
(a)
"Special district" means an entity under Title 
17B, Limited Purpose Local 
Government Entities - Special Districts
.
(b)
"Special district" includes a governmental or quasi-governmental entity that is not a 
county, municipality, school district, or the state.
(79)
"Specific land use law" means a requirement or restriction on the use of a specific 
parcel in a development agreement that a legislative body approves with the consent of 
an affected property owner.
(78)
(80)
"Specified public agency" means:
(a)
the state;
(b)
a school district; or
(c)
a charter school.
(79)
(81)
"Specified public utility" means an electrical corporation, gas corporation, or 
telephone corporation, as those terms are defined in Section 
54-2-1
.
(80)
(82)
"State" includes any department, division, or agency of the state.
(81)
(83)
(a)
"Subdivision" means any land that is divided, resubdivided, or proposed to 
be divided into two or more lots or other division of land for the purpose, whether 
immediate or future, for offer, sale, lease, or development either on the installment 
plan or upon any and all other plans, terms, and conditions.
(b)
"Subdivision" includes:
(i)
the division or development of land, whether by deed, metes and bounds 
description, devise and testacy, map, plat, or other recorded instrument, regardless 
of whether the division includes all or a portion of a parcel or lot; and
(ii)
except as provided in Subsection 
(81)(c)
(83)(c)
, divisions of land for residential 
and nonresidential uses, including land used or to be used for commercial, 
agricultural, and industrial purposes.
(c)
"Subdivision" does not include:
(i)
a bona fide division or partition of agricultural land for agricultural purposes;
(ii)
a recorded conveyance document:
(A)
consolidating multiple lots or parcels into one legal description encompassing 
all lots by reference to a recorded plat and all parcels by metes and bounds 
description; or
(B)
joining a lot to a parcel;
(iii)
a bona fide division or partition of land in a county other than a first class county 
for the purpose of siting, on one or more of the resulting separate parcels:
(A)
an electrical transmission line or a substation;
(B)
a natural gas pipeline or a regulation station; or
(C)
an unmanned telecommunications, microwave, fiber optic, electrical, or other 
utility service regeneration, transformation, retransmission, or amplification 
facility;
(iv)
a bona fide division of land by deed or other instrument if the deed or other 
instrument states in writing that the division:
(A)
is in anticipation of future land use approvals on the parcel or parcels;
(B)
does not confer any land use approvals; and
(C)
has not been approved by the land use authority;
(v)
a boundary adjustment;
(vi)
a boundary establishment;
(vii)
a road, street, or highway dedication plat;
(viii)
a deed or easement for a road, street, or highway purpose; or
(ix)
any other division of land authorized by law.
(82)
(84)
(a)
"Subdivision amendment" means an amendment to a recorded subdivision 
in accordance with Section 
17-79-711
 that:
(i)
vacates all or a portion of the subdivision;
(ii)
increases the number of lots within the subdivision;
(iii)
alters a public right-of-way, a public easement, or public infrastructure within the 
subdivision; or
(iv)
alters a common area or other common amenity within the subdivision.
(b)
"Subdivision amendment" does not include a simple boundary adjustment.
(83)
(85)
"Substantial evidence" means evidence that:
(a)
is beyond a scintilla; and
(b)
a reasonable mind would accept as adequate to support a conclusion.
(84)
(86)
"Suspect soil" means soil that has:
(a)
a high susceptibility for volumetric change, typically clay rich, having more than a 
3% swell potential;
(b)
bedrock units with high shrink or swell susceptibility; or
(c)
gypsiferous silt and clay, gypsum, or bedrock units containing abundant gypsum 
commonly associated with dissolution and collapse features.
(85)
(87)
"Therapeutic school" means a residential group living facility:
(a)
for four or more individuals who are not related to:
(i)
the owner of the facility; or
(ii)
the primary service provider of the facility;
(b)
that serves students who have a history of failing to function:
(i)
at home;
(ii)
in a public school; or
(iii)
in a nonresidential private school; and
(c)
that offers:
(i)
room and board; and
(ii)
an academic education integrated with:
(A)
specialized structure and supervision; or
(B)
services or treatment related to a disability, an emotional development, a 
behavioral development, a familial development, or a social development.
(86)
(88)
"Transferable development right" means a right to develop and use land that 
originates by an ordinance that authorizes a 
land
property
 owner in a designated 
sending zone to transfer land use rights from a designated sending zone to a designated 
receiving zone.
(87)
(89)
"Unincorporated" means the area outside of the incorporated area of a 
municipality.
(88)
(90)
"Water interest" means any right to the beneficial use of water, including:
(a)
each of the rights listed in Section 
73-1-11
; and
(b)
an ownership interest in the right to the beneficial use of water represented by:
(i)
a contract; or
(ii)
a share in a water company, as defined in Section 
73-3-3.5
.
(89)
(91)
"Zoning map" means a map, adopted as part of a land use ordinance, that depicts 
land use zones, overlays, or districts.
Section 29. Section 
17-79-205
 is amended to read:
17-79-205
Effective 
05/06/26
. Notice of public hearings and public meetings on 
adoption or modification of land use regulation.
(1)
Each county shall give:
(a)
notice of the date, time, and place of the first public hearing to consider the adoption 
or modification of a land use regulation; and
(b)
notice of each public meeting on the subject.
(2)
Each notice of a public hearing under Subsection 
(1)(a)
 shall be:
(a)
mailed to each affected entity at least 10 calendar days before the public hearing; and
(b)
(i)
provided for the area affected by the land use ordinance changes, as a class B 
notice under Section 
63G-30-102
, for at least 10 calendar days before the day of 
the public hearing; or
(ii)
if the proposed land use ordinance adoption or modification is ministerial in 
nature, as described in Subsections 
(6)(a)
 and 
(b)
, provided as a class A notice 
under Section 
63G-30-102
 for at least 10 calendar days before the day of the 
public hearing.
(3)
In addition to the notice requirements described in Subsections 
(1)
 and 
(2)
, for any 
proposed modification to the text of a zoning code, the notice posted in accordance with 
Subsection 
(2)
 shall:
(a)
include: 
(i)
a summary of the effect of the proposed modifications to the text of the zoning 
code designed to be understood by a lay person; or
(ii)
a direct link to the county's webpage where a person can find a summary of the 
effect of the proposed modifications to the text of the zoning code designed to be 
understood by a lay person; and
(b)
be provided to any person upon written request.
(4)
Each notice of a public meeting under Subsection 
(1)(b)
 shall be at least 24 hours before 
the hearing and shall be published for the county, as a class A notice under Section 
63G-30-102
, for at least 24 hours.
(5)
(a)
A county shall send a courtesy notice to each owner of private real property 
whose property is located entirely or partially within the proposed zoning map 
enactment or amendment at least 10 days before the scheduled day of the public 
hearing.
(b)
The notice shall:
(i)
identify with specificity each owner of record of real property that will be affected 
by the proposed zoning map or map amendments;
(ii)
state the current zone in which the real property is located;
(iii)
state the proposed new zone for the real property;
(iv)
provide information regarding or a reference to the proposed regulations, 
prohibitions, and permitted uses that the property will be subject to if the zoning 
map or map amendment is adopted;
(v)
state that the owner of real property may no later than 10 days after the day of the 
first public hearing file a written objection to the inclusion of the owner's property 
in the proposed zoning map or map amendment;
(vi)
state the address where the property owner should file the protest;
(vii)
notify the property owner that each written objection filed with the county will 
be provided to the county legislative body; and
(viii)
state the location, date, and time of the public hearing described in Section 
17-79-502
.
(c)
If a county mails notice to a property owner under Subsection 
(2)(b)(i)
 for a public 
hearing on a zoning map or map amendment, the notice required in this Subsection 
(5)
 may be included in or part of the notice described in Subsection 
(2)(b)(i)
 rather 
than sent separately.
(6)
(a)
A
For purposes of the notice requirements in Subsection 
(2)(b)
 only, a
 proposed 
land use ordinance is ministerial in nature if the proposed land use ordinance change 
is to:
(i)
bring the county's land use ordinances into compliance with a state or federal law;
(ii)
adopt a county land use update that affects:
(A)
an entire zoning district; or
(B)
multiple zoning districts;
(iii)
adopt a non-substantive, clerical text amendment to an existing land use 
ordinance;
(iv)
recodify the county's existing land use ordinances; or
(v)
designate or define an affected area for purposes of a boundary adjustment or 
annexation.
(b)
A proposed land use ordinance may include more than one of the purposes described 
in Subsection 
(6)(a)
 and remain ministerial in nature.
(c)
If a proposed land use ordinance includes an adoption or modification not described 
in Subsection 
(6)(a)
:
(i)
the proposed land use ordinance is not ministerial in nature, even if the proposed 
land use ordinance also includes a change or modification described in Subsection 
(6)(a)
; and
(ii)
the notice requirements of Subsection 
(2)(b)(i)
 apply.
Section 30. Section 
17-79-301
 is amended to read:
17-79-301
Effective 
05/06/26
. Ordinance establishing planning commission 
required -- Exception -- Ordinance requirements -- Planning advisory area planning 
commission -- Compensation.
(1)
(a)
Except as provided in Subsection 
(1)(b)
, each county shall enact an ordinance 
establishing a countywide planning commission for the unincorporated areas of the 
county not within a planning advisory area.
(b)
Subsection 
(1)(a)
 does not apply if all of the county is included within any 
combination of:
(i)
municipalities;
(ii)
planning advisory areas each with a separate planning commission; and
(iii)
mountainous planning districts.
(c)
(i)
Notwithstanding Subsection 
(1)(a)
, a county that designates a mountainous 
planning district shall enact an ordinance, subject to Subsection 
(1)(c)(ii)
, 
establishing a planning commission that has jurisdiction over the entire 
mountainous planning district.
(ii)
A planning commission described in Subsection 
(1)(c)(i)
 has jurisdiction subject 
to a local health department exercising the local health department's authority in 
accordance with 
Title 26A, Chapter 1, Local Health Departments
, and a 
municipality exercising the municipality's authority in accordance with Section 
10-8-15
.
(iii)
The ordinance shall require that members of the planning commission be 
appointed by the county executive with the advice and consent of the county 
legislative body.
(2)
(a)
Notwithstanding Subsection 
(1)(b)
, the county legislative body of a county of the 
first or second class that includes more than one planning advisory area each with a 
separate planning commission may enact an ordinance that:
(i)
dissolves each planning commission within the county; and
(ii)
establishes a countywide planning commission that has jurisdiction over:
(A)
each planning advisory area within the county; and
(B)
the unincorporated areas of the county not within a planning advisory area.
(b)
A countywide planning commission established under Subsection 
(2)(a)
 shall assume 
the duties of each dissolved planning commission.
(3)
(a)
The ordinance described in Subsection 
(1)(a)
, (1)(c), or 
(2)(a)
 shall
 define
:
(i)
include 
the number and terms of the 
planning commission 
members and, if the 
county chooses, alternate members;
(ii)
the mode of appointment
provide procedures for appointing a planning 
commission member
;
(iii)
the
provide
 procedures for filling vacancies
 on the planning commission;
(iv)
 and removal from office
provide procedures for removing a planning 
commission member from the planning commission
;
(v)
except as provided in Subsection (
3)(a)(vi)
, describe the causes for which a 
planning commission member may be removed from the planning commission, 
which shall include:
(A)
using public funds for a political purpose under Title 20A, Chapter 11, Part 12, 
Political Activities of Public Entities Act;
(B)
violating a provision of Title 10, Chapter 3, Part 13, Municipal Officers' and 
Employees' Ethics Act; and
(C)
acting with the intent to influence a land use decision or an appeal of a 
pending land use application in a manner that creates actual impermissible bias 
or an unacceptable risk of impermissible bias in the planning commission 
member's administrative or quasi-judicial duties;
(vi)
provide that a planning commission member deliberating about a specific 
pending land use application in a planning commission meeting with municipal 
staff, an elected official, or the land use applicant is not cause for removing a 
planning commission member from the planning commission;
(vii)
provide requirements for when a planning commission member shall recuse 
oneself from deliberating or voting on certain land use applications;
(iv)
(viii)
define 
the authority of the planning commission;
(v)
(ix)
subject to Subsection 
(3)(b)
, 
the
include
 rules of order and procedure for 
use by the planning commission in a public meeting; and
(vi)
(x)
include 
other details relating to the organization and procedures of the 
planning commission.
(b)
Subsection 
(3)(a)(v)
(3)(a)(ix)
 does not affect the planning commission's duty to 
comply with 
Title 52, Chapter 4, Open and Public Meetings Act
.
(4)
(a)
(i)
If the county establishes a planning advisory area planning commission, the 
county legislative body shall enact an ordinance that defines:
(A)
appointment procedures;
(B)
procedures for filling vacancies and removing members from office;
(C)
subject to Subsection 
(4)(a)(ii)
, the rules of order and procedure for use by the 
planning advisory area planning commission in a public meeting; and
(D)
details relating to the organization and procedures of each planning advisory 
area planning commission.
(ii)
Subsection 
(4)(a)(i)(C)
 does not affect the planning advisory area planning 
commission's duty to comply with 
Title 52, Chapter 4, Open and Public Meetings 
Act
.
(b)
The planning commission for each planning advisory area shall consist of seven 
members who shall be appointed by:
(i)
in a county operating under a form of government in which the executive and 
legislative functions of the governing body are separated, the county executive 
with the advice and consent of the county legislative body; or
(ii)
in a county operating under a form of government in which the executive and 
legislative functions of the governing body are not separated, the county 
legislative body.
(c)
(i)
Members shall serve four-year terms and until their successors are appointed 
and qualified.
(ii)
Notwithstanding the provisions of Subsection 
(4)(c)(i)
, members of the first 
planning commissions shall be appointed so that, for each commission, the terms 
of at least one member and no more than two members expire each year.
(d)
(i)
Each member of a planning advisory area planning commission shall be a 
registered voter residing within the planning advisory area.
(ii)
Subsection 
(4)(d)(i)
 does not apply to a member described in Subsection 
(5)(a)
 if 
that member was, before May 12, 2015, authorized to reside outside of the 
planning advisory area.
(5)
(a)
A member of a planning commission who was elected to and served on a planning 
commission on May 12, 2015, shall serve out the term to which the member was 
elected.
(b)
Upon the expiration of an elected term described in Subsection 
(5)(a)
, the vacant seat 
shall be filled by appointment in accordance with this section.
(6)
Upon the appointment of all members of a planning advisory area planning commission, 
each planning advisory area planning commission under this section shall begin to 
exercise the powers and perform the duties provided in Section 
17-79-302
 with respect 
to all matters then pending that previously had been under the jurisdiction of the 
countywide planning commission or planning advisory area planning and zoning board.
(7)
The legislative body may authorize a member of a planning commission to receive per 
diem and travel expenses for meetings actually attended, in accordance with Section 
11-55-103
. 
Section 31. Section 
17-79-302
 is amended to read:
17-79-302
Effective 
05/06/26
. Planning commission powers and duties -- 
Training requirements.
(1)
Each countywide, planning advisory area, or mountainous planning district planning 
commission shall, with respect to the unincorporated area of the county, the planning 
advisory area, or the mountainous planning district, review and make a recommendation 
to the county legislative body for:
(a)
a general plan and amendments to the general plan;
(b)
land use regulations, including:
(i)
ordinances regarding the subdivision of land within the county; and
(ii)
amendments to existing land use regulations;
(c)
an appropriate delegation of power to at least one designated land use authority to 
hear and act on a land use application;
(d)
an appropriate delegation of power to at least one appeal authority to hear and act on 
an appeal from a decision of the land use authority; and
(e)
application processes that:
(i)
may include a designation of routine land use matters that, upon application and 
proper notice, will receive informal streamlined review and action if the 
application is uncontested; and
(ii)
shall protect the right of each:
(A)
land use applicant and adversely affected party to require formal consideration 
of any application by a land use authority;
 and
(B)
land use applicant or adversely affected party to appeal a land use authority's 
decision to a separate appeal authority
; and
.
(C)
participant to be heard in each public hearing on a contested application.
(2)
Before making a recommendation to a legislative body on an item described in 
Subsection 
(1)(a)
 or 
(b)
, the planning commission shall hold a public hearing in 
accordance with Section 
17-79-404
.
(3)
A legislative body may adopt, modify, or reject a planning commission's 
recommendation to the legislative body under this section.
(4)
A legislative body may consider a planning commission's failure to make a timely 
recommendation as a negative recommendation.
(5)
(4)
Nothing in this section limits the right of a county to initiate or propose the actions 
described in this section.
(6)
(5)
(a)
(i)
This Subsection 
(6)
(5)
 applies to a county that:
(A)
is a county of the first, second, or third class; and
(B)
has a population in the county's unincorporated areas of 5,000 or more.
(ii)
The population for each county described in Subsection 
(6)(a)(i)
(5)(a)(i)
 shall 
be derived from:
(A)
an estimate of the Utah Population Committee created in Section 
63C-20-103
; 
or
(B)
if the Utah Population Committee estimate is not available, the most recent 
official census or census estimate of the United States 
Bureau of the 
Census
Bureau
.
(b)
A county described in Subsection 
(6)(a)(i)
(5)(a)(i)
 shall ensure that each member 
of the county's planning commission completes four hours of annual land use training 
as follows:
(i)
one hour of annual training on general powers and duties
, including the role of the 
planning commission in administrative, legislative, and quasi-judicial functions
under 
Title 17, Chapter 27a, County Land Use, Development, and Management 
Act
this chapter
; and
(ii)
three hours of annual training on 
a combination of 
land use
 and ethics
, which may 
include:
(A)
appeals and variances;
(B)
conditional use permits;
(C)
exactions;
(D)
impact fees;
(E)
vested rights;
(F)
subdivision regulations and improvement guarantees;
(G)
land use referenda;
(H)
property rights;
(I)
real estate procedures and financing;
(J)
zoning, including use-based and form-based;
 and
(K)
drafting ordinances and code that complies with statute
.
;
(L)
ex parte communication; and
(M)
conflict of interest.
(c)
A newly appointed planning commission member may not participate in a public 
meeting as an appointed member until the member completes the training described 
in Subsection 
(6)(b)(i)
(5)(b)(i)
.
(d)
A planning commission member may qualify for one completed hour of training 
required under Subsection 
(6)(b)(ii)
(5)(b)(ii)
 if the member attends, as an appointed 
member, 12 public meetings of the planning commission within a calendar year.
(e)
A county shall provide the training described in Subsection 
(6)(b)
(5)(b)
 through:
(i)
county staff;
(ii)
the Utah Association of Counties; or
(iii)
a list of training courses selected by:
(A)
the Utah Association of Counties; or
(B)
the Division of Real Estate created in Section 
61-2-201
.
(f)
A county shall, for each planning commission member:
(i)
monitor compliance with the training requirements in Subsection 
(6)(b)
(5)(b)
; 
and
(ii)
maintain a record of training completion at the end of each calendar year.
Section 32. Section 
17-79-501
 is amended to read:
17-79-501
Effective 
05/06/26
. Enactment of land use regulation.
(1)
Only a legislative body, as the body authorized to weigh policy considerations, may 
enact a land use regulation.
(2)
(a)
Except as provided in Subsection 
(2)(b)
, a legislative body may enact a land use 
regulation only by ordinance.
(b)
A legislative body may, by ordinance or resolution, enact a land use regulation that 
imposes a fee.
(3)
A land use regulation shall be consistent with the purposes 
set forth in
of
 this chapter.
(4)
(a)
A legislative body shall adopt a land use regulation to:
(i)
create or amend a zoning district under Subsection 
17-79-503(1)(a)
; and
(ii)
designate general uses allowed in each zoning district.
(b)
A land use authority may establish or modify other restrictions or requirements other 
than those described in Subsection 
(4)(a)
, including the configuration or modification 
of uses or density, through a land use decision that applies criteria or policy elements 
that a land use regulation establishes or describes.
(5)
(a)
A county shall publish on the county's website:
(i)
all of the county's land use regulations; and
(ii)
a fee schedule that lists all of the county's fees related to a land use application, 
land use permit, or land use regulation, including development review fees and 
impact fees.
(b)
A county may comply with Subsection 
(5)(a)
 by:
(i)
posting a link on the county's website to a separate webpage or third-party website 
where the land use regulations or fee schedule described in Subsection 
(5)(a)
 are 
posted; and
(ii)
submitting a new or modified land use regulation or fee schedule described in 
Subsection 
(5)(a)
 to the third-party website within six months after the day on 
which the legislative body adopts the new or modified land use regulation or fee 
schedule.
(5)
(6)
A county may not adopt a land use regulation
,
 or
 development agreement, or
make a
 land use decision that restricts the type of crop that may be grown in an area that 
is:
(a)
zoned agricultural; or
(b)
assessed under 
Title 59, Chapter 2, Part 5, Farmland Assessment Act
.
(6)
(7)
A county land use regulation pertaining to an airport or an airport influence area, as 
that term is defined in Section 
72-10-401
, is subject to 
Title 72, Chapter 10, Part 4, 
Airport Zoning Act
.
Section 33. Section 
17-79-502
 is amended to read:
17-79-502
Effective 
05/06/26
. Preparation and adoption of land use regulation.
(1)
A planning commission shall:
(a)
provide notice as required by Subsection 
17-79-205(1)(a)
 and, if applicable, 
Subsection 
17-79-205(4)
;
(b)
hold a public hearing on a proposed land use regulation;
(c)
if applicable, consider each written objection filed in accordance with Subsection 
17-79-205(4)
 before the public hearing; and
(d)
(i)
review and recommend to the legislative body a proposed land use regulation 
that represents the planning commission's recommendation for regulating the use 
and development of land within:
(A)
all or any part of the unincorporated area of the county; or
(B)
for a mountainous planning district, all or any part of the area in the 
mountainous planning district; and
(ii)
forward to the legislative body all objections filed in accordance with Subsection 
17-79-205(4)
.
(2)
(a)
The legislative body shall consider each proposed land use regulation that the 
planning commission recommends to the legislative body.
(b)
After providing notice as required by Subsection 
17-79-205(1)(b)
 and holding a 
public meeting, the legislative body may adopt or reject the proposed land use 
regulation described in Subsection 
(2)(a)
:
(i)
as proposed by the planning commission; or
(ii)
after making any revision the legislative body considers appropriate.
(c)
A legislative body may consider a planning commission's failure to make a timely 
recommendation as a negative recommendation if the legislative body has provided 
for that consideration by ordinance.
(c)
Beginning on September 15, 2026, a legislative body may adopt or reject a proposed 
land use regulation without waiting for a recommendation from the planning 
commission if:
(i)
a land use applicant makes a request described in Subsection 
17-79-805(2)(b)
; or
(ii)
a legislative body determines that a planning commission has had adequate time 
to consider the land use regulation.
Section 34. Section 
17-79-507
 is amended to read:
17-79-507
Effective 
05/06/26
. Classification of new and unlisted business uses.
(1)
As used in this section:
(a)
"Classification request" means a request to determine whether a proposed business 
use aligns with an existing land use specified in a county's land use ordinances.
(b)
"New or unlisted business use" means a business activity that does not align with an 
existing land use specified in a county's land use ordinances.
(2)
(a)
Each county shall incorporate into the county's land use ordinances a process for 
reviewing and approving a new or unlisted business use and designating an 
appropriate zone or zones for an approved use.
(b)
The process described in Subsection 
(2)(a)
 shall:
(i)
detail how an applicant may submit a classification request;
(ii)
establish a procedure for the county to review a classification request, including:
(A)
providing a land use authority with criteria to determine whether a proposed 
use aligns with an existing use;
 and
(B)
allowing an applicant to proceed under the regulations of an existing use if a 
land use authority determines a proposed use aligns with that existing use;
 and
(C)
providing the applicant an opportunity to appeal a land use authority's decision 
to the land use appeal authority;
(iii)
provide that if a use is determined to be a new or unlisted business use:
(A)
the applicant shall submit 
to the legislative body for review 
an application 
for 
approval of the new or unlisted business use to the legislative body for review
requesting that the legislative body adopt a land use ordinance that permits the 
new or unlisted business as a permitted or conditional use
;
(B)
notwithstanding Subsection 
17-79-503(2)
 or 
(3)
, 
the legislative body shall 
consider and 
determine whether to 
approve or deny 
the new or unlisted 
business use
the application described in Subsection 
(2)(b)(iii)(A)
; and
(C)
the legislative body shall approve or deny 
the new or unlisted business use
the application described in Subsection 
(2)(b)(iii)(A)
, within a time frame the 
legislative body establishes by ordinance, if the applicant responds to requests 
for additional information within a time frame established by the county and 
appears at required hearings;
(iv)
provide that if the legislative body approves 
a proposed new or unlisted business 
use
the application described in Subsection 
(2)(b)(iii)(A)
, the legislative body 
shall designate an appropriate zone or zones for the approved use; and
(v)
provide that if the legislative body denies 
a proposed new or unlisted business use
the application described in Subsection 
(2)(b)(iii)(A)
, or if an applicant disagrees 
with a land use authority's classification of the proposed use, the legislative body 
shall:
(A)
notify the applicant in writing of each reason for the classification or denial; 
and
(B)
offer the applicant an opportunity to challenge the classification or denial 
through an administrative appeal process established by the county
notify the 
applicant of the process for appealing the legislative body's decision in 
accordance with Section 
17-79-1009
.
(c)
A county may not require an applicant who submits an application described in 
Subsection 
(2)(b)(iii)(A)
 to submit the application to the planning commission for 
consideration, review, or approval.
(3)
Each county shall amend each land use ordinance that contains a list of approved or 
prohibited business uses to include a reference to the process for petitioning to approve a 
new or unlisted business use, as described in Subsection 
(2)
.
Section 35. Section 
17-79-621
 is enacted to read:
17-79-621
Effective 
05/06/26
. Structure height.
(1)
A county may regulate:
(a)
the number of habitable stories that a structure may contain; and
(b)
the overall height of a structure.
(2)
If a land use authority approved a land use application for a commercial lodging 
structure on or before September 1, 2025, and the land use application is subject to land 
use regulations described in Subsection 
(1)
 that conflict, the land use authority may not 
limit the number of above-ground habitable stories the land use applicant builds within 
the maximum overall height that the land use authority approved for the structure.
Section 36. Section 
17-79-706
 is amended to read:
17-79-706
Effective 
05/06/26
. Review of subdivision applications and 
subdivision improvement plans.
(1)
As used in this section:
(a)
"Review cycle" means the occurrence of:
(i)
the applicant's submittal of a complete subdivision application;
(ii)
the county's review of that subdivision application;
(iii)
the county's response to that subdivision application, in accordance with this 
section; and
(iv)
the applicant's reply to the county's response that addresses each of the county's 
required modifications or requests for additional information.
(b)
"Subdivision application" means a land use application for the subdivision of land 
located within the unincorporated area of a county.
(c)
"Subdivision improvement plans" means the civil engineering plans associated with 
required infrastructure improvements and county-controlled utilities required for a 
subdivision.
(d)
"Subdivision ordinance review" means review by a county to verify that a 
subdivision application meets the criteria of the county's ordinances.
(e)
"Subdivision plan review" means a review of the applicant's subdivision 
improvement plans and other aspects of the subdivision application to verify that the 
application complies with county ordinances and applicable installation standards and 
inspection specifications for infrastructure improvements.
(2)
The review cycle restrictions and requirements of this section do not apply to the review 
of subdivision applications affecting property within identified geological hazard areas.
(3)
(a)
A county may require a subdivision improvement plan to be submitted with a 
subdivision application.
(b)
A county may not require a subdivision improvement plan to be submitted with both 
a preliminary subdivision application and a final subdivision application.
(4)
(a)
The review cycle requirements of this section apply:
(i)
to the review of a preliminary subdivision application, if the county requires a 
subdivision improvement plan to be submitted with a preliminary subdivision 
application; or
(ii)
to the review of a final subdivision application, if the county requires a 
subdivision improvement plan to be submitted with a final subdivision application.
(b)
A county may not, outside the review cycle, engage in a substantive review of 
required infrastructure improvements or a county controlled utility.
(5)
(a)
A county shall complete the initial review of a complete subdivision application 
submitted for ordinance review for a residential subdivision for single-family 
dwellings, two-family dwellings, or town homes:
(i)
no later than 15 business days after the complete subdivision application is 
submitted, if the county has a population over 5,000; or
(ii)
no later than 30 business days after the complete subdivision application is 
submitted, if the county has a population of 5,000 or less.
(b)
A county shall maintain and publish a list of the items comprising the complete 
subdivision application, including:
(i)
the application;
(ii)
the owner's affidavit;
(iii)
an electronic copy of all plans in PDF format;
(iv)
the preliminary subdivision plat drawings; and
(v)
a breakdown of fees due upon approval of the application.
(6)
A county shall publish a list of the items that comprise a complete subdivision land use 
application.
(7)
A county shall complete a subdivision plan review of a subdivision improvement plan 
that is submitted with a complete subdivision application for a residential subdivision for 
single-family dwellings, two-family dwellings, or town homes:
(a)
within 20 business days after the complete subdivision application is submitted, if the 
county has a population over 5,000; or
(b)
within 40 business days after the complete subdivision application is submitted, if 
the county has a population of 5,000 or less.
(8)
(a)
In reviewing a subdivision application, a county may require:
(i)
additional information relating to an applicant's plans to ensure compliance with 
county ordinances and approved standards and specifications for construction of 
public improvements; and
(ii)
modifications to plans that do not meet current ordinances, applicable standards, 
or specifications or do not contain complete information.
(b)
A county's request for additional information or modifications to plans under 
Subsection 
(8)(a)(i)
 or 
(ii)
 shall be specific and include citations to ordinances, 
standards, or specifications that require the modifications to subdivision 
improvement plans, and shall be logged in an index of requested modifications or 
additions.
(c)
A county may not require more than four review cycles for a subdivision 
improvement plan review.
(d)
(i)
Subject to Subsection 
(8)(d)(ii)
, unless the change or correction is necessitated 
by the applicant's adjustment to a subdivision improvement plan or an update to a 
phasing plan that adjusts the infrastructure needed for the specific development, a 
change or correction not addressed or referenced in a county's subdivision 
improvement plan review is waived.
(ii)
A modification or correction necessary to protect public health and safety or to 
enforce state or federal law may not be waived.
(iii)
If an applicant makes a material change to a subdivision improvement plan, the 
county has the discretion to restart the review process at the first review of the 
subdivision improvement plan review, but only with respect to the portion of the 
subdivision improvement plan that the material change substantively affects.
(e)
(i)
This Subsection 
(8)
 applies if an applicant does not submit a revised 
subdivision improvement plan within:
(A)
20 business days after the county requires a modification or correction, if the 
county has a population over 5,000; or
(B)
40 business days after the county requires a modification or correction, if the 
county has a population of 5,000 or less.
(ii)
If an applicant does not submit a revised subdivision improvement plan within the 
time specified in Subsection 
(8)(e)(i)
, a county has an additional 20 business days 
after the time specified in Subsection 
(7)
 to respond to a revised subdivision 
improvement plan.
(9)
After the applicant has responded to the final review cycle, and the applicant has 
complied with each modification requested in the county's previous review cycle, the 
county may not require additional revisions if the applicant has not materially changed 
the plan, other than changes that were in response to requested modifications or 
corrections.
(10)
(a)
In addition to revised plans, an applicant shall provide a written explanation in 
response to the county's review comments, identifying and explaining the applicant's 
revisions and reasons for declining to make revisions, if any.
(b)
The applicant's written explanation shall be comprehensive and specific, including 
citations to applicable standards and ordinances for the design and an index of 
requested revisions or additions for each required correction.
(c)
If an applicant fails to address a review comment in the response, the review cycle is 
not complete and the subsequent review cycle may not begin until all comments are 
addressed.
(11)
(a)
If, on the fourth or final review, a county fails to respond within 20 business 
days, the county shall, upon request of the property owner, and within 10 business 
days after the day on which the request is received:
(i)
(a)
for a dispute arising from the subdivision improvement plans, assemble an 
appeal panel in accordance with Subsection 
17-79-812(5)(d)
17-79-812(4)(d)
 to 
review and approve or deny the final revised set of plans; or
(ii)
(b)
for a dispute arising from the subdivision ordinance review, advise the 
applicant, in writing, of the deficiency in the application and of the right to appeal the 
determination to a designated appeal authority.
Section 37. Section 
17-79-707
 is amended to read:
17-79-707
Effective 
05/06/26
. Subdivision plat recording or development 
activity before required infrastructure is completed -- Improvement completion 
assurance -- Improvement warranty.
(1)
As used in this section: 
(a)
"Private landscaping plan" means a proposal:
(i)
to install landscaping on a lot owned by a private individual or entity; and
(ii)
submitted to a county by the private individual or entity, or on behalf of a private 
individual or entity, that owns the lot.
(b)
"Public landscaping improvement" means landscaping that an applicant is required to 
install to comply with published installation and inspection specifications for public 
improvements that:
(i)
will be dedicated to and maintained by the county; or
(ii)
are associated with and proximate to trail improvements that connect to planned 
or existing public infrastructure.
(2)
A land use authority shall establish objective inspection standards for acceptance of a 
required public landscaping improvement or infrastructure improvement.
(3)
(a)
Except as provided in Subsection 
(3)(d)
 or 
(3)(e)
, before an applicant conducts 
any development activity or records a plat, the applicant shall:
(i)
complete any required public landscaping improvements or infrastructure 
improvements; or
(ii)
post an improvement completion assurance for any required public landscaping 
improvements or infrastructure improvements.
(b)
If an applicant elects to post an improvement completion assurance, the applicant 
shall
,
 in accordance with Subsection 
(5)
,
 provide completion assurance for:
(i)
completion of 100% of the required public landscaping improvements or 
infrastructure improvements; or
(ii)
if the county has inspected and accepted a portion of the public landscaping 
improvements or infrastructure improvements, 100% of the incomplete or 
unaccepted public landscaping improvements or infrastructure improvements.
(c)
A county shall:
(i)
establish a minimum of two acceptable forms of completion assurance;
(ii)
(A)
if an applicant elects to post an improvement completion assurance, allow 
the applicant to post an assurance that meets the conditions of this chapter and 
any local ordinances; and
(B)
beginning on May 7, 2025, 
if a county accepts cash deposits as a form of 
completion assurance and an applicant elects to post a 
new 
cash deposit as a 
form of completion assurance, place the cash deposit in an interest-bearing 
account upon receipt and return any earned interest to the applicant with the 
return of the completion assurance according to the conditions of this chapter 
and any local ordinances;
(iii)
establish a system for the partial release of an improvement completion 
assurance as portions of required public landscaping improvements or 
infrastructure improvements are completed and accepted in accordance with local 
ordinance; and
(iv)
issue or deny a building permit in accordance with Section 
17-79-901
 based on 
the installation of public landscaping improvements or infrastructure 
improvements.
(d)
A county may not require an applicant to post an improvement completion assurance 
for:
(i)
public landscaping improvements or infrastructure improvements that the county 
has previously inspected and accepted;
(ii)
infrastructure improvements that are private and not essential or required to meet 
the building code, fire code, flood or storm water management provisions, street 
and access requirements, or other essential necessary public safety improvements 
adopted in a land use regulation;
(iii)
in a county where ordinances require all infrastructure improvements within the 
area to be private, infrastructure improvements within a development that the 
county requires to be private;
(iv)
landscaping improvements that are not public landscaping improvements, unless 
the landscaping improvements and completion assurance are required under the 
terms of a development agreement;
(v)
a private landscaping plan;
(vi)
landscaping improvements or infrastructure improvements that an applicant 
elects to install at the applicant's own risk:
(A)
before the plat is recorded;
(B)
pursuant to inspections required by the county for the infrastructure 
improvement; and
(C)
pursuant to final civil engineering plan approval by the county; or
(vii)
any individual public landscaping improvement or individual infrastructure 
improvement when the individual public landscaping improvement or individual 
infrastructure improvement is also included as part of a separate improvement 
completion assurance.
(e)
(i)
A county may not:
(A)
prohibit an applicant from installing a public landscaping improvement or an 
infrastructure improvement when the 
municipality
county
 has approved final 
civil engineering plans for the development activity or plat for which the public 
landscaping improvement or infrastructure improvement is required; or
(B)
require an applicant to sign an agreement, release, or other document 
inconsistent with this chapter as a condition of posting an improvement 
completion assurance, security for an improvement warranty, or receiving a 
building permit.
(ii)
Notwithstanding Subsection 
(3)(e)(i)(A)
, public infrastructure improvements and 
infrastructure improvements that are installed by an applicant are subject to 
inspection by the county in accordance with the county's adopted inspection 
standards.
(f)
(i)
Each improvement completion assurance and improvement warranty posted by 
an applicant with a county shall be independent of any other improvement 
completion assurance or improvement warranty posted by the same applicant with 
the county.
(ii)
Subject to Section 
17-79-805
, if an applicant has posted a form of security with a 
county for more than one infrastructure improvement or public landscaping 
improvement, the county may not withhold acceptance of an applicant's required 
subdivision improvements, public landscaping improvement, infrastructure 
improvements, or the performance of warranty work for the same applicant's 
failure to complete a separate subdivision improvement, public landscaping 
improvement, infrastructure improvement, or warranty work under a separate 
improvement completion assurance or improvement warranty.
(4)
(a)
Except as provided in Subsection 
(4)(c)
, as a condition for increased density or 
other entitlement benefit not currently available under the existing zone, a county 
may require a completion assurance bond for landscaped amenities and common area 
that are dedicated to and maintained by a homeowners association.
(b)
Any agreement regarding a completion assurance bond under Subsection 
(4)(a)
between the applicant and the county shall be memorialized in a development 
agreement.
(c)
A county may not require a completion assurance bond for or dictate who installs or 
is responsible for the cost of the landscaping of residential lots or the equivalent open 
space surrounding single-family attached homes, whether platted as lots or common 
area.
(5)
The sum of the improvement completion assurance required under Subsections 
(3)
 and 
(4)
 may not exceed the sum of:
(a)
100% of the estimated cost of the public landscaping improvements or infrastructure 
improvements, as evidenced by an engineer's estimate or licensed contractor's bid; 
and
(b)
10% of the amount of the bond to cover administrative costs incurred by the county 
to complete the improvements, if necessary.
(6)
(a)
Upon an applicant's written request that the land use authority accept or reject the 
applicant's installation of required subdivision improvements or performance of 
warranty work as set forth in Section 
17-79-805
, and for the duration of each 
improvement warranty period, the land use authority may require the applicant to:
(i)
execute an improvement warranty for the improvement warranty period; and
(ii)
post a cash deposit, surety bond, letter of credit, or other similar security, as 
required by the county, in the amount of up to 10% of the lesser of the:
(A)
county engineer's original estimated cost of completion; or
(B)
applicant's reasonable proven cost of completion.
(b)
A county may not require the payment of the deposit of the improvement warranty 
assurance described in Subsection 
(6)(a)
 for an infrastructure improvement or public 
landscaping improvement before the applicant indicates through written request that 
the applicant has completed the infrastructure improvement or public landscaping 
improvement.
(7)
When a county accepts an improvement completion assurance for public landscaping 
improvements or infrastructure improvements for a development in accordance with 
Subsection 
(3)(c)(ii)(A)
, the county may not deny an applicant a building permit if the 
development meets the requirements for the issuance of a building permit under the 
building code and fire code.
(8)
A county may not require the submission of a private landscaping plan as part of an 
application for a building permit.
(9)
The provisions of this section do not supersede the terms of a valid development 
agreement, an adopted phasing plan, or the 
state construction code
State Construction 
Code
.
Section 38. Section 
17-79-803
 is amended to read:
17-79-803
Effective 
05/06/26
. Applicant's entitlement to land use application 
approval -- Application relating to land in a high priority transportation corridor -- 
County's requirements and limitations -- Vesting upon submission of development plan 
and schedule.
(1)
(a)
(i)
Subject to Subsection 
(7)
(8)
, an applicant who has submitted a complete 
land use application, including the payment of all application fees, is entitled to 
substantive review of the application under the land use regulations:
(A)
in effect on the date that the application is complete; and
(B)
applicable to the application or to the information shown on the submitted 
application.
(ii)
An applicant is entitled to approval of a land use application if the application 
conforms to the requirements of the applicable land use regulations, land use 
decisions, and development standards in effect when the applicant submits a 
complete application and pays all application fees, unless:
(A)
the land use authority, on the record, formally finds that a compelling, 
countervailing public interest would be jeopardized by approving the 
application and specifies the compelling, countervailing public interest in 
writing; or
(B)
in the manner provided by local ordinance and before the applicant submits 
the application, the county formally initiates proceedings to amend the county's 
land use regulations in a manner that would prohibit approval of the 
application as submitted.
(b)
The county shall process an application without regard to proceedings the county 
initiated to amend the county's ordinances as described in Subsection 
(1)(a)(ii)(B)
 if:
(i)
180 days have passed since the county initiated the proceedings; and
(ii)
(A)
the proceedings have not resulted in an enactment that prohibits approval 
of the application as submitted; or
(B)
during the 12 months before the county processing the application or multiple 
applications of the same type, the application is impaired or prohibited under 
the terms of a temporary land use regulation adopted under Section 
17-79-504
.
(c)
A land use application is considered submitted and complete when the applicant 
provides the application in a form that complies with the requirements of applicable 
ordinances and pays all applicable fees.
(d)
Unless a phasing sequence is required in an executed development agreement, a 
county shall, without regard to any other separate and distinct land use application, 
accept and process a complete land use application in accordance with this chapter.
(e)
The continuing validity of an approval of a land use application is conditioned upon 
the applicant proceeding after approval to implement the approval with reasonable 
diligence.
(f)
Subject to Subsection 
(7)
(8)
, a county may not impose on an applicant who has 
submitted a complete application a requirement that is not expressed in:
(i)
this chapter;
(ii)
a county ordinance in effect on the date that the applicant submits a complete 
application, subject to Subsection 
(1)(a)(ii)
; or
(iii)
a county specification for public improvements applicable to a subdivision or 
development that is in effect on the date that the applicant submits an application.
(g)
A county may not impose on a holder of an issued land use permit or a final, 
unexpired subdivision plat a requirement that is not expressed:
(i)
in a land use permit;
(ii)
on the subdivision plat;
(iii)
in a document on which the land use permit or subdivision plat is based;
(iv)
in the written record evidencing approval of the land use permit or subdivision 
plat;
(v)
in this chapter;
(vi)
in a county ordinance; or
(vii)
in a county specification for residential roadways in effect at the time a 
residential subdivision was approved.
(h)
Except as provided in Subsection 
(1)(i)
 or 
(j)
, a county may not withhold issuance of 
a certificate of occupancy or acceptance of subdivision improvements because of an 
applicant's failure to comply with a requirement that is not expressed:
(i)
in the building permit or subdivision plat, documents on which the building permit 
or subdivision plat is based, or the written record evidencing approval of the 
building permit or subdivision plat; or
(ii)
in this chapter or the county's ordinances.
(i)
A county may not unreasonably withhold issuance of a certificate of occupancy 
where an applicant has met all requirements essential for the public health, public 
safety, and general welfare of the occupants, in accordance with this chapter, unless:
(i)
the applicant and the county have agreed in a written document to the withholding 
of a certificate of occupancy; or
(ii)
the applicant has not provided a financial assurance for required and uncompleted 
public landscaping improvements or infrastructure improvements in accordance 
with an applicable local ordinance.
(j)
A county may not conduct a final inspection required before issuing a certificate of 
occupancy for a residential unit that is within the boundary of an infrastructure 
financing district, as defined in Section 
17B-1-102
, until the applicant for the 
certificate of occupancy provides adequate proof to the county that any lien on the 
unit arising from the infrastructure financing district's assessment against the unit 
under Title 
11, Chapter 42
, Assessment Area Act, has been released after payment in 
full of the infrastructure financing district's assessment against that unit.
(k)
A county:
(i)
may require the submission of a private landscaping plan, as defined in Section 
17-79-707
, before landscaping is installed; and
(ii)
may not withhold an applicant's building permit or certificate of occupancy 
because the applicant has not submitted a private landscaping plan.
(2)
A county is bound by the terms and standards of applicable land use regulations and 
shall comply with mandatory provisions of those regulations.
(3)
Beginning on October 1, 2026, a county shall publish on the county's website an 
application checklist for each land use application type that includes a checklist of all 
required plans and documents that make a complete application.
(3)
(4)
A county may not, as a condition of land use application approval, require a person 
filing a land use application to obtain documentation regarding a school district's 
willingness, capacity, or ability to serve the development proposed in the land use 
application.
(4)
(5)
Subject to Subsection 
(7)
(8)
, a specified public agency's submission of a 
development plan and schedule as required in Subsection 
17-79-305(8)
 that complies 
with the requirements of that subsection, the specified public agency vests in the 
county's applicable land use maps, zoning map, hookup fees, impact fees, other 
applicable development fees, and land use regulations in effect on the date of submission.
(5)
(6)
(a)
If sponsors of a referendum timely challenge a project in accordance with 
Subsection 
20A-7-601(6)
, the project's affected owner may rescind the project's land 
use approval by delivering a written notice:
(i)
to the local clerk as defined in Section 
20A-7-101
; and
(ii)
no later than seven days after the day on which a petition for a referendum is 
determined sufficient under Subsection 
20A-7-607(4)
.
(b)
Upon delivery of a written notice described in Subsection 
(5)(a)
(6)(a)
 the following 
are rescinded and are of no further force or effect:
(i)
the relevant land use approval; and
(ii)
any land use regulation enacted specifically in relation to the land use approval.
(6)
(7)
(a)
After issuance of a building permit, a county may not:
(i)
change or add to the requirements expressed in the building permit, unless the 
change or addition is:
(A)
requested by the building permit holder; or
(B)
necessary to comply with an applicable state building code; or
(ii)
revoke the building permit or take action that has the effect of revoking the 
building permit.
(b)
Subsection 
(6)(a)
(7)(a)
 does not prevent a county from issuing a building permit 
that contains an expiration date defined in the building permit.
(7)
(8)
A county shall comply with the provisions of this chapter regarding all pending 
land use applications and new land use applications submitted under this chapter.
Section 39. Section 
17-79-811
 is amended to read:
17-79-811
Effective 
05/06/26
. Provisions applicable to a provider of culinary or 
secondary water.
A provider of culinary or secondary water that commits to provide a water service required 
by a land use application process is subject to the following provisions the same as if the 
provider were a county:
(1)
Subsections 
17-79-804(5)
 and (6);
(2)
Section 
17-79-805
;
 and
(3)
Section 
17-79-812
; and
(4)
Section 
17-79-813
.
Section 40. Section 
17-79-812
 is amended to read:
17-79-812
Effective 
05/06/26
. Exactions -- Requirement to offer to original 
owner property acquired by exaction -- Exaction for right-of-way improvements -- 
Improvement completion assurance requirements.
(1)
A county may impose an exaction or exactions on development proposed in a land use 
application, including, subject to 
Subsection 
(3)
Section 
17-79-813
, an exaction for a 
water interest, if:
(a)
an essential link exists between a legitimate governmental interest and each exaction; 
and
(b)
each exaction is roughly proportionate, both in nature and extent, to the impact of the 
proposed development.
(2)
If a land use authority imposes an exaction for another governmental entity:
(a)
the governmental entity shall request the exaction; and
(b)
the land use authority shall transfer the exaction to the governmental entity for which 
it was exacted.
(3)
(a)
(i)
Subject to the requirements of this Subsection 
(3)
, a county or, if 
applicable, the county's culinary water authority shall base any exaction for a 
water interest on the culinary water authority's established calculations of 
projected water interest requirements.
(ii)
Except as described in Subsection 
(3)(a)(iii)
, a culinary water authority shall 
base an exaction for a culinary water interest on:
(A)
consideration of the system-wide minimum sizing standards established for 
the culinary water authority by the Division of Drinking Water in accordance 
with Section 
19-4-114
; and
(B)
the number of equivalent residential connections associated with the culinary 
water demand for each specific development proposed in the development's 
land use application, applying lower exactions for developments with lower 
equivalent residential connections as demonstrated by at least five years of 
usage data for like land uses within the county.
(iii)
A county or culinary water authority may impose an exaction for a culinary 
water interest that results in less water being exacted than would otherwise be 
exacted under Subsection 
(3)(a)(ii)
 if the county or culinary water authority, at the 
county's or culinary water authority's sole discretion, determines there is good 
cause to do so.
(iv)
A county shall make public the methodology used to comply with Subsection 
(3)(a)(ii)(B)
. A land use applicant may appeal to the county's governing body an 
exaction calculation used by the county or the county's culinary water authority 
under Subsection 
(3)(a)(ii)
. A land use applicant may present data and other 
information that illustrates a need for an exaction recalculation and the county's 
governing body shall respond with due process.
(v)
Upon an applicant's request, the culinary water authority shall provide the 
applicant with the basis for the culinary water authority's calculations under 
Subsection 
(3)(a)(i)
 on which an exaction for a water interest is based.
(b)
A county or the county's culinary water authority may not impose an exaction for a 
water interest if the culinary water authority's existing available water interests 
exceed the water interests needed to meet the reasonable future water requirement of 
the public, as determined under Subsection 
73-1-4(2)(f)
.
(4)
(3)
(a)
If a county plans to dispose of surplus real property under Section 
17-78-103
that was acquired under this section and has been owned by the county for less than 
15 years, the county shall first offer to reconvey the property, without receiving 
additional consideration, to the person who granted the property to the county.
(b)
A person to whom a county offers to reconvey property under Subsection 
(4)(a)
(3)(a)
 has 90 days to accept or reject the county's offer.
(c)
If a person to whom a county offers to reconvey property declines the offer, the 
county may offer the property for sale.
(d)
Subsection 
(4)(a)
(3)(a)
 does not apply to the disposal of property acquired by 
exaction by a community development or urban renewal agency.
(5)
(4)
(a)
A county may not, as part of an infrastructure improvement, require the 
installation of pavement on a residential roadway at a width in excess of 32 feet.
(b)
Subsection 
(5)(a)
(4)(a)
 does not apply if a county requires the installation of 
pavement in excess of 32 feet:
(i)
in a vehicle turnaround area;
(ii)
in a cul-de-sac;
(iii)
to address specific traffic flow constraints at an intersection, mid-block 
crossings, or other areas;
(iv)
to address an applicable general or master plan improvement, including 
transportation, bicycle lanes, trails, or other similar improvements that are not 
included within an impact fee area;
(v)
to address traffic flow constraints for service to or abutting higher density 
developments or uses that generate higher traffic volumes, including community 
centers, schools, and other similar uses;
(vi)
as needed for the installation or location of a utility which is maintained by the 
county and is considered a transmission line or requires additional roadway width;
(vii)
for third-party utility lines that have an easement preventing the installation of 
utilities maintained by the county within the roadway;
(viii)
for utilities over 12 feet in depth;
(ix)
for roadways with a design speed that exceeds 25 miles per hour;
(x)
as needed for flood and stormwater routing;
(xi)
as needed to meet fire code requirements for parking and hydrants; or
(xii)
as needed to accommodate street parking.
(c)
Nothing in this section shall be construed to prevent a county from approving a road 
cross section with a pavement width less than 32 feet.
(d)
(i)
A land use applicant may appeal a municipal requirement for pavement in 
excess of 32 feet on a residential roadway.
(ii)
A land use applicant that has appealed a municipal specification for a residential 
roadway pavement width in excess of 32 feet may request that the county 
assemble a panel of qualified experts to serve as the appeal authority for purposes 
of determining the technical aspects of the appeal.
(iii)
Unless otherwise agreed by the applicant and the county, the panel described in 
Subsection 
(5)(d)(ii)
(4)(d)(ii)
 shall consist of the following three experts:
(A)
one licensed engineer, designated by the county;
(B)
one licensed engineer, designated by the land use applicant; and
(C)
one licensed engineer, agreed upon and designated by the two designated 
engineers under Subsections 
(5)(d)(iii)(A)
(4)(d)(iii)(A)
 and 
(B)
.
(iv)
A member of the panel assembled by the county under Subsection 
(5)(d)(ii)
(4)(d)(ii)
 may not have an interest in the application that is the subject of the 
appeal.
(v)
The land use applicant shall pay:
(A)
50% of the cost of the panel; and
(B)
the county's published appeal fee.
(vi)
The decision of the panel is a final decision, subject to a petition for review under 
Subsection 
(5)(d)(vii)
(4)(d)(vii)
.
(vii)
In accordance with Section 
17-79-1009
, a land use applicant or the county may 
file a petition for review of the decision with the district court within 30 days after 
the date that the decision is final.
Section 41. Section 
17-79-813
 is enacted to read:
17-79-813
Effective 
05/06/26
. Exactions for water rights.
(1)
Subject to the requirements of this section, a county or, if applicable, the county's 
culinary water authority shall base any exaction for a water interest on the culinary water 
authority's established calculations of projected water interest requirements.
(2)
Except as described in Subsection 
(3)
, a culinary water authority shall base an exaction 
for a culinary water interest on:
(a)
consideration of the system-wide minimum sizing standards established for the 
culinary water authority by the Division of Drinking Water in accordance with 
Section 
19-4-114
; and
(b)
the number of equivalent residential connections associated with the culinary water 
demand for each specific development proposed in the development's land use 
application, applying lower exactions for developments with lower equivalent 
residential connections as demonstrated by at least five years of usage data for like 
land uses within the county.
(3)
If a county or culinary water authority determines, in the sole discretion of the county or 
culinary water authority, that good cause exists, the county or culinary water authority 
may impose an exaction for a culinary water interest that results in less water being 
exacted than would otherwise be exacted under Subsection 
(2)
.
(4)
(a)
A county shall make public the methodology used to comply with Subsection 
(2)(b)
.
(b)
A land use applicant may submit a request to the county's governing body an 
exaction calculation used by the county or the county's culinary water authority under 
Subsection 
(2)
.
(c)
A land use applicant may present data and other information that illustrates a need 
for an exaction recalculation and the county's governing body shall respond with due 
process.
(5)
Upon an applicant's request, the culinary water authority shall provide the applicant 
with the basis for the culinary water authority's calculations under Subsection 
(2)
 on 
which an exaction for a water interest is based.
(6)
(a)
A county or the county's culinary water authority may not impose an exaction for 
a water interest if:
(i)
the culinary water authority's existing available water interests exceed the water 
interests needed to meet the reasonable future water requirement of the public; or
(ii)
the county or the county's culinary water authority does not have a written plan in 
accordance with Subsection 
(6)(b)
.
(b)
Beginning on January 1, 2028, a county shall determine the county's water interests 
needed to meet the reasonable future water requirement of the public by completing a 
written plan described in Subsection 
73-1-4(2)(f)
.
Section 42. Section 
17-79-901
 is amended to read:
17-79-901
Effective 
05/06/26
. Enforcement -- Limitations on a county's ability 
to enforce an ordinance by withholding a permit or certificate.
(1)
(a)
A county or 
an adversely affected party
a land use applicant
 may, in addition to 
other remedies provided by law, institute:
(i)
injunctions, mandamus, abatement, or any other appropriate actions; or
(ii)
proceedings to prevent, enjoin, abate, or remove the unlawful building, use, or act.
(b)
A county need only establish the violation to obtain the injunction.
(2)
(a)
Except as provided in Subsections 
(3)
 through 
(6)
, a county may enforce the 
county's ordinance by withholding a building permit or certificate of occupancy.
(b)
It is unlawful to erect, construct, reconstruct, alter, or change the use of any building 
or other structure within a county without approval of a building permit.
(c)
The county may not issue a building permit unless the plans of and for the proposed 
erection, construction, reconstruction, alteration, or use fully conform to all 
regulations then in effect.
(d)
A county may require an applicant to install a permanent road, cover a temporary 
road with asphalt or concrete, or create another method for servicing a structure that 
is consistent with Appendix D of the International Fire Code, before receiving a 
certificate of occupancy for that structure.
(e)
A county may require an applicant to maintain and repair a temporary fire apparatus 
road during the construction of a structure accessed by the temporary fire apparatus 
road in accordance with the county's adopted standards.
(f)
A county may require temporary signs to be installed at each street intersection once 
construction of new roadway allows passage by a motor vehicle.
(g)
A county may adopt and enforce any appendix of the International Fire Code, 2021 
Edition.
(3)
(a)
A county may not deny an applicant a building permit or certificate of occupancy 
because the applicant has not completed an infrastructure improvement:
(i)
unless the infrastructure improvement is essential to meet the requirements for the 
issuance of a building permit or certificate of occupancy under Title 
15A, State 
Construction and Fire Codes Act
; and
(ii)
for which the county has accepted an improvement completion assurance for a 
public landscaping improvement, as defined in Section 
17-79-707
, or an 
infrastructure improvement for the development.
(b)
For purposes of Subsection 
(3)(a)(i)
, notwithstanding Section 
15A-5-205.6
, 
infrastructure improvement that is essential means:
(i)
for a building permit:
(A)
operable fire hydrants installed in a manner that is consistent with the county's 
adopted engineering standards; and
(ii)
(B)
for temporary roads used during construction, a properly compacted road 
base installed in a manner consistent with the county's adopted engineering 
standards
.
;
(ii)
for a certificate of occupancy, at the discretion of the county, at least one of the 
following:
(A)
a permanent road;
(B)
a temporary road covered with asphalt or concrete; or
(C)
another method for accessing a structure consistent with Appendix D of the 
International Fire Code; and
(iii)
public infrastructure necessary for the health, life, and safety of the occupant.
(c)
A county may not adopt an engineering standard that requires an applicant to install a 
permanent road or a temporary road with asphalt or concrete before receiving a 
building permit.
(4)
A county may not deny an applicant a building permit or certificate of occupancy for 
failure to:
(a)
submit a private landscaping plan, as defined in Section 
17-79-707
; or
(b)
complete a landscaping improvement that is not a public landscaping improvement, 
as defined in Section 
17-79-707
.
(5)
A county may not withhold a building permit based on the lack of completion of a 
portion of a public sidewalk to be constructed within a public right-of-way serving a lot 
where a single-family or two-family residence or town home is proposed in a building 
permit application if an improvement completion assurance has been posted for the 
incomplete portion of the public sidewalk.
(6)
A county may not prohibit the construction of a single-family or two-family residence 
or town home, withhold recording a plat, or withhold acceptance of a public landscaping 
improvement, as defined in Section 
17-79-707
, or an infrastructure improvement based 
on the lack of installation of a public sidewalk if an improvement completion assurance 
has been posted for the public sidewalk.
(7)
A county may not redeem an improvement completion assurance securing the 
installation of a public sidewalk sooner than 18 months after the date the improvement 
completion assurance is posted.
(8)
A county shall allow an applicant to post an improvement completion assurance for a 
public sidewalk separate from an improvement completion assurance for:
(a)
another infrastructure improvement; or
(b)
a public landscaping improvement, as defined in Section 
17-79-707
.
(9)
A county may withhold a certificate of occupancy for a single-family or two-family 
residence or town home until the portion of the public sidewalk to be constructed within 
a public right-of-way and located immediately adjacent to the single-family or 
two-family residence or town home is completed and accepted by the county.
Section 43. Section 
17-79-1001
 is amended to read:
17-79-1001
Effective 
05/06/26
. Appeal authority required -- Condition 
precedent to judicial review -- Appeal authority duties.
(1)
(a)
Each
Subject to Subsection 
(1)(d)
, each
 county adopting a land use ordinance 
shall, by ordinance, establish one or more appeal authorities.
(b)
An appeal authority shall hear and decide:
(i)
requests for 
variances
a variance
 from 
the terms of
a
 land use 
ordinances
ordinance
;
(ii)
appeals from 
a 
land use 
decisions
decision
 applying 
a 
land use 
ordinances
ordinance
; and
(iii)
appeals from a fee charged in accordance with Section 
17-79-802
.
(c)
An appeal authority may not hear an appeal from the enactment of a land use 
regulation.
(d)
Beginning on July 1, 2026, a county described in Subsection 
17-79-302(5)(a)(i)
 may 
not designate the county's legislative body as an appeal authority.
(e)
Notwithstanding Subsection 
(1)(d)
, a legislative body shall continue to be the appeal 
authority for an appeal if:
(i)
a land use ordinance designated the legislative body as the appeal authority when 
the appellant filed the appeal: and
(ii)
the appellant filed the appeal on or before June 30, 2026.
(2)
As a condition precedent to judicial review, each adversely affected party 
or land use 
applicant 
shall timely and specifically challenge a land use authority's land use decision, 
in accordance with local ordinance.
(3)
An appeal authority described in Subsection 
(1)(a)
:
(a)
shall:
(i)
act in a quasi-judicial manner; and
(ii)
serve as the final arbiter of issues involving the interpretation or application of 
a 
land use 
ordinances
ordinance
; and
(b)
may not entertain an appeal of a matter in which the appeal authority, or any 
participating member, had first acted as the land use authority.
(4)
By ordinance, a county may:
(a)
designate a separate appeal authority to hear requests for variances than the appeal 
authority the county designates to hear appeals;
(b)
designate one or more separate appeal authorities to hear distinct types of appeals of 
land use authority decisions;
(c)
require an adversely affected party to present to an appeal authority every theory of 
relief that the adversely affected party can raise in district court;
 and
(d)
not require a land use applicant or adversely affected party to pursue duplicate or 
successive appeals before the same or separate appeal authorities as a condition of an 
appealing party's duty to exhaust administrative remedies; and
(e)
(d)
provide that specified types of land use decisions may be appealed directly to the 
district court.
(5)
A county may not
:
(a)
require a public hearing for a request for a variance or land use appeal
.
; or
(b)
require a land use applicant or adversely affected party to pursue successive appeals 
before the same or separate appeal authorities as a condition of an appealing party's 
duty to exhaust administrative remedies.
(6)
If the county establishes or, before May 2, 2005, has established a multiperson board, 
body, or panel to act as an appeal authority, at a minimum the board, body, or panel 
shall:
(a)
notify each of the members of the board, body, or panel of any meeting or hearing of 
the board, body, or panel;
(b)
provide each of the members of the board, body, or panel with the same information 
and access to municipal resources as any other member;
(c)
convene only if a quorum of the members of the board, body, or panel is present; and
(d)
act only upon the vote of a majority of the convened members of the board, body, or 
panel.
Section 44. Section 
17-79-1005
 is repealed and reenacted to read:
17-79-1005
Effective 
05/06/26
. Burden of proof.
In an appeal described in this part:
(1)
if the appellant is a land use applicant, the appellant has the burden of proving that the 
land use authority's land use decision is illegal or is not supported by substantial 
evidence; or
(2)
if the appellant is an adversely affected party, the appellant has the burden of proving 
that the land use authority's land use decision is illegal, or that the factual findings are 
clearly erroneous.
Section 45. Section 
17-79-1006
 is amended to read:
17-79-1006
Effective 
05/06/26
. Due process.
(1)
Each
An
 appeal authority shall conduct each appeal and variance request as described 
by local ordinance.
(2)
Each
An
 appeal authority shall respect the due process rights of 
each of the 
participants
an appeal participant
.
(3)
An appeal authority may only allow the following people to participate or speak during 
an appeal hearing:
(a)
the appellant or the appellant's representatives;
(b)
the land use applicant or the land use applicant's representatives; and
(c)
the county's representatives.
Section 46. Section 
17-79-1007
 is amended to read:
17-79-1007
Effective 
05/06/26
. Scope of review of factual matters on appeal -- 
Appeal authority requirements.
(1)
A county may, by ordinance, designate the scope of review of factual matters for 
appeals of land use authority decisions.
(2)
If the county fails to designate a scope of review of factual matters, the appeal authority 
shall review the 
matter
factual matters
 de novo, without deference to the land use 
authority's determination of 
the 
factual matters.
(3)
If the scope of review of factual matters is on the record, the appeal authority shall 
determine whether the record on appeal includes substantial evidence for each essential 
finding of fact.
(4)
The appeal authority shall:
(a)
determine the correctness of the land use authority's interpretation and application of 
the plain meaning of the land use regulations; and
(b)
interpret and apply a land use regulation to favor a land use application unless the 
land use regulation plainly restricts the land use application.
(5)
(a)
An appeal authority's land use decision is a quasi-judicial act.
(b)
A
Except as provided in Subsection 
(5)(c)
, a
 legislative body may 
not 
act as an 
appeal authority unless both the legislative body and the appealing party agree to 
allow a third party to act as the appeal authority.
(c)
Beginning on July 1, 2026, the legislative body of a county described in Subsection 
17-79-302(5)(a)(i)
 may not act as an appeal authority unless:
(i)
a land use ordinance designated the legislative body as the appeal authority when 
the appellant filed the appeal; and
(ii)
the appellant filed the appeal on or before June 30, 2026.
(6)
Only a decision in which a land use authority has applied a land use regulation to a 
particular land use application, person, or parcel may be appealed to an appeal authority.
Section 47. Section 
17-79-1009
 is amended to read:
17-79-1009
Effective 
05/06/26
. No district court review until administrative 
remedies exhausted -- Time for filing -- Tolling of time -- Standards governing court 
review -- Record on review -- Staying of decision.
(1)
No
A
 person may challenge in district court a land use decision 
until that
if the
 person 
has exhausted the person's administrative remedies as provided in 
Part 7, Appeal 
Authority and Variances
this part
, if applicable.
(2)
(a)
Subject to Subsection 
(1)
, a land use applicant or adversely affected party may file 
a petition for review of a land use decision with the district court within 30 days after 
the decision is final.
(b)
(i)
The time under Subsection 
(2)(a)
 to file a petition is tolled from the date a 
property owner files a request for arbitration of a constitutional taking issue with 
the property rights ombudsman under Section 
13-43-204
 until 30 days after:
(A)
the arbitrator issues a final award; or
(B)
the property rights ombudsman issues a written statement under Subsection 
13-43-204(3)(b)
 declining to arbitrate or to appoint an arbitrator.
(ii)
A tolling under Subsection 
(2)(b)(i)
 operates only as to the specific constitutional 
taking issue that is the subject of the request for arbitration filed with the property 
rights ombudsman by a property owner.
(iii)
A request for arbitration filed with the property rights ombudsman after the time 
under Subsection 
(2)(a)
 to file a petition has expired does not affect the time to 
file a petition.
(3)
(a)
A court shall:
(i)
presume that a land use regulation properly enacted under the authority of this 
chapter is valid; and
(ii)
determine only whether:
(A)
the land use regulation is expressly preempted by, or was enacted contrary to, 
state or federal law; and
(B)
it is reasonably debatable that the land use regulation is consistent with this 
chapter.
(b)
A court shall presume that a final land use decision of a land use authority or an 
appeal authority is valid unless the land use decision is:
(i)
arbitrary and capricious; or
(ii)
illegal.
(c)
(i)
A land use decision is arbitrary and capricious if the land use decision is not 
supported by substantial evidence in the record.
(ii)
A land use decision is illegal if the land use decision:
(A)
is based on an incorrect interpretation of a land use regulation;
(B)
conflicts with the authority granted by this title; or
(C)
is contrary to law.
(d)
(i)
A court may affirm or reverse a land use decision.
(ii)
If the court reverses a land use decision, the court shall remand the matter to the 
land use authority with instructions to issue a land use decision consistent with the 
court's decision.
(4)
The provisions of Subsection 
(2)(a)
 apply from the date on which the county takes final 
action on a land use application, if the county conformed with the notice provisions of 
Part 2, Notice
, or for any person who had actual notice of the pending land use decision.
(5)
If the county has complied with Section 
17-79-205
, a challenge to the enactment of a 
land use regulation
 or
,
 general plan
, or specified land use law
 may not be filed with the 
district court more than 30 days after the enactment.
(6)
A challenge to a land use decision is barred unless the challenge is filed within 30 days 
after the land use decision is final.
(7)
(a)
The land use authority or appeal authority, as the case may be, shall transmit to 
the reviewing court the record of the proceedings of the land use authority or appeal 
authority, including the minutes, findings, orders and, if available, a true and correct 
transcript of the proceedings.
(b)
If the proceeding was recorded, a transcript of that recording is a true and correct 
transcript for purposes of this Subsection 
(7)
.
(8)
(a)
(i)
If there is a record, the district court's review is limited to the record 
provided by the land use authority or appeal authority, as the case may be.
(ii)
The court may not accept or consider any evidence outside the record of the land 
use authority or appeal authority, as the case may be, unless that evidence was 
offered to the land use authority or appeal authority, respectively, and the court 
determines that the evidence was improperly excluded.
(b)
If there is no record, the court may call witnesses and take evidence.
(9)
(a)
The filing of a petition does not stay the land use decision of the land use 
authority or appeal authority, as the case may be.
(b)
(i)
Before filing a petition under this section or a request for mediation or 
arbitration of a constitutional taking issue under Section 
13-43-204
, a land use 
applicant may petition the appeal authority to stay the appeal authority's decision.
(ii)
Upon receipt of a petition to stay, the appeal authority may order the appeal 
authority's decision stayed pending district court review if the appeal authority 
finds the order to be in the best interest of the county.
(iii)
After a petition is filed under this section or a request for mediation or arbitration 
of a constitutional taking issue is filed under Section 
13-43-204
, the petitioner 
may seek an injunction staying the appeal authority's land use decision.
(10)
If the court determines that a party initiated or pursued a challenge to a land use 
decision on a land use application in bad faith, the court may award attorney fees.
Section 48. Section 
17B-1-120
 is amended to read:
17B-1-120
Effective 
05/06/26
. Exactions -- Exaction for water interest -- 
Requirement to offer to original owner property acquired by exaction.
(1)
A special district may impose an exaction on a service received by an applicant, 
including, subject to Subsection 
(2)
, an exaction for a water interest if:
(a)
the special district establishes that a legitimate special district interest makes the 
exaction essential; and
(b)
the exaction is roughly proportionate, both in nature and extent, to the impact of the 
proposed service on the special district.
(2)
(a)
(i)
Subject to the requirements of this Subsection 
(2)
, a special district shall 
base an exaction for a water interest on the culinary water authority's established 
calculations of projected water interest requirements.
(ii)
Except as described in Subsection 
(2)(a)(iii)
, a culinary water authority shall base 
an exaction for a culinary water interest on:
(A)
consideration of the system-wide minimum sizing standards established for 
the culinary water authority by the Division of Drinking Water 
pursuant to
in 
accordance with
 Section 
19-4-114
; and
(B)
the number of equivalent residential connections associated with the culinary 
water demand for each specific development proposed in the development's 
land use application, applying lower exactions for developments with lower 
equivalent residential connections as demonstrated by at least five years of 
usage data for like land uses within the special district.
(iii)
A special district may impose an exaction for a culinary water interest that 
results in less water being exacted than would otherwise be exacted under 
Subsection 
(2)(a)(ii)
 if the special district, at the special district's sole discretion, 
determines there is good cause to do so.
(iv)
A special district shall make public the methodology used to comply with 
Subsection 
(2)(a)(ii)(B)
. A service applicant may appeal to the special district's 
governing body an exaction calculation used by the special district under 
Subsection 
(2)(a)(ii)
. A service applicant may present data and other information 
that illustrates a need for an exaction recalculation and the special district's 
governing body shall respond with due process.
(v)
If requested by a service applicant, the culinary authority shall provide the basis 
for the culinary water authority's calculations described in Subsection 
(2)(a)(i)
.
(b)
(i)
A special district may not impose an exaction for a water interest if
:
(A)
the culinary water authority's existing available water interests exceed the 
water interests needed to meet the reasonable future water requirement of the 
public
, as determined in accordance with Section 
73-1-4
.
; or
(B)
the special district or the special district's culinary water authority does not 
have a written plan in accordance with Subsection 
(2)(b)(ii)
.
(ii)
Beginning on January 1, 2028, a special district shall determine the special 
district's water interests needed to meet the reasonable future water requirement of 
the public by completing a written plan described in Subsection 
73-1-4(2)(f)
.
(3)
(a)
If a special district plans to dispose of surplus real property that was acquired 
under this section and has been owned by the special district for less than 15 years, 
the special district shall offer to reconvey the surplus real property, without receiving 
additional consideration, first to a person who granted the real property to the special 
district.
(b)
The person described in Subsection 
(3)(a)
 shall, within 90 days after the day on 
which a special district makes an offer under Subsection 
(3)(a)
, accept or reject the 
offer.
(c)
If a person rejects an offer under Subsection 
(3)(b)
, the special district may sell the 
real property.
Section 49. Section 
63I-2-210
 is amended to read:
63I-2-210
Effective 
05/06/26
. Repeal dates: Title 10.
(1)
Subsection 
10-2a-205(2)(b)(iii)
, regarding a feasibility study for the proposed 
incorporation of a community council area, is repealed July 1, 2028.
(2)
Section 
10-2a-205.5
, Additional feasibility consultant considerations for proposed 
incorporation of community council area -- Additional feasibility study requirements, is 
repealed July 1, 2028.
(3)
Subsection 
10-20-904(4)(c)
, regarding an inspection fee on a qualified water 
conservancy district, is repealed July 1, 2026.
(4)
Section 
10-20-626
, Structure height, is repealed July 1, 2027.
Section 50. Section 
63I-2-217
 is amended to read:
63I-2-217
Effective 
05/06/26
. Repeal dates: Titles 17 through 17D.
(1)
Subsection 
17-79-804(4)(c)
, regarding an inspection fee on a qualified water 
conservancy district, is repealed July 1, 2026.
(2)
Subsection 
17-62-102(3)
, regarding the process for changing a form of county 
government, is repealed January 1, 2028.
(3)
Subsections 
17-62-203(10)
 through 
(12)
, regarding the process to create a districting 
commission and implementing a district map, are repealed July 1, 2029.
(4)
Section 
17-79-621
, Structure height, is repealed July 1, 2027.
Section 51. Section 
73-1-4
 is amended to read:
73-1-4
Effective 
05/06/26
Partially Repealed 
12/31/30
. Reversion to the public 
by abandonment or forfeiture for nonuse within seven years -- Saved water -- Nonuse 
application -- Written plan standards for future water.
(1)
As used in this section:
(a)
"Public entity" means:
(i)
the United States;
(ii)
an agency of the United States;
(iii)
the state;
(iv)
a state agency;
(v)
a political subdivision of the state; or
(vi)
an agency of a political subdivision of the state.
(b)
"Public water supplier" means an entity that:
(i)
supplies water, directly or indirectly, to the public for municipal, domestic, or 
industrial use; and
(ii)
is:
(A)
a public entity;
(B)
a water corporation, as defined in Section 
54-2-1
, that is regulated by the 
Public Service Commission;
(C)
a community water system:
(I)
that:
(Aa)
supplies water to at least 100 service connections used by year-round 
residents; or
(Bb)
regularly serves at least 200 year-round residents; and
(II)
whose voting members:
(Aa)
own a share in the community water system;
(Bb)
receive water from the community water system in proportion to the 
member's share in the community water system; and
(Cc)
pay the rate set by the community water system based on the water the 
member receives; or
(D)
a water users association:
(I)
in which one or more public entities own at least 70% of the outstanding 
shares; and
(II)
that is a local sponsor of a water project constructed by the United States 
Bureau of Reclamation.
(c)
"Saved water" means the same as that term is defined in Section 
73-3-3
.
(d)
"Shareholder" means the same as that term is defined in Section 
73-3-3.5
.
(e)
"Water company" means the same as that term is defined in Section 
73-3-3.5
.
(f)
"Water supply entity" means an entity that supplies water as a utility service or for 
irrigation purposes and is also:
(i)
a municipality, water conservancy district, metropolitan water district, irrigation 
district, or other public agency;
(ii)
a water company regulated by the Public Service Commission; or
(iii)
any other owner of a community water system.
(2)
(a)
Except as provided in Subsection 
(2)(b)
 or 
(e)
, when an appropriator or the 
appropriator's successor in interest abandons or ceases to beneficially use all or a 
portion of a water right for a period of at least seven years, the water right or the 
unused portion of that water right is subject to forfeiture in accordance with 
Subsection 
(2)(c)
.
(b)
(i)
An appropriator or the appropriator's successor in interest may file an 
application for nonuse with the state engineer.
(ii)
A nonuse application may be filed on all or a portion of the water right, including 
water rights held by a water company.
(iii)
After giving written notice to the water company, a shareholder may file a 
nonuse application with the state engineer on the water represented by the stock.
(iv)
(A)
The approval of a nonuse application excuses the requirement of 
beneficial use of water from the date of filing.
(B)
The time during which an approved nonuse application is in effect does not 
count toward the seven-year period described in Subsection 
(2)(a)
.
(v)
The filing or approval of a nonuse application or a series of nonuse applications 
under Subsection 
(3)
 does not:
(A)
constitute beneficial use of a water right;
(B)
protect a water right that is already subject to forfeiture under this section; or
(C)
bar a water right owner from:
(I)
using the water under the water right as permitted under the water right; or
(II)
claiming the benefit of Subsection 
(2)(e)
 or any other forfeiture defense 
provided by law.
(c)
(i)
Except as provided in Subsection 
(2)(c)(ii)
, a water right or a portion of the 
water right may not be forfeited unless a judicial action to declare the right 
forfeited is commenced:
(A)
within 15 years from the end of the latest period of nonuse of at least seven 
years; or
(B)
within the combined time of 15 years from the end of the most recent period 
of nonuse of at least seven years and the time the water right was subject to one 
or more nonuse applications.
(ii)
(A)
The state engineer, in a proposed determination of rights filed with the 
court and prepared in accordance with Section 
73-4-11
, may not assert that a 
water right was forfeited unless the most recent period of nonuse of seven 
years ends or occurs:
(I)
during the 15 years immediately preceding the day on which the state 
engineer files the proposed determination of rights with the court; or
(II)
during the combined time immediately preceding the day on which the 
state engineer files the proposed determination of rights consisting of 15 
years and the time the water right was subject to one or more approved 
nonuse applications.
(B)
After the day on which a proposed determination of rights is filed with the 
court a person may not assert that a water right subject to that determination 
was forfeited before the issuance of the proposed determination, unless the 
state engineer asserts forfeiture in the proposed determination, or a person, in 
accordance with Section 
73-4-11
, makes an objection to the proposed 
determination that asserts forfeiture.
(iii)
A water right, found to be valid in a decree entered in an action for general 
determination of rights under Chapter 4, Determination of Water Rights, is subject 
to a claim of forfeiture based on a seven-year period of nonuse that begins after 
the day on which the state engineer filed the related proposed determination of 
rights with the court, unless the decree provides otherwise.
(iv)
If in a judicial action a court declares a water right forfeited, on the date on which 
the water right is forfeited:
(A)
the right to beneficially use the water reverts to the public; and
(B)
the water made available by the forfeiture:
(I)
first, satisfies other water rights in the hydrologic system in order of priority 
date; and
(II)
second, may be appropriated as provided in this title.
(d)
Except as provided in Subsection 
(2)(e)
, this section applies whether the unused or 
abandoned water or a portion of the water is:
(i)
permitted to run to waste; or
(ii)
beneficially used by others without right with the knowledge of the water right 
holder.
(e)
This section does not apply to:
(i)
the beneficial use of water according to a written, terminable lease or other 
agreement with the appropriator or the appropriator's successor in interest;
(ii)
a water right if its place of use is contracted under an approved state agreement or 
federal conservation fallowing program;
(iii)
those periods of time when a surface water or groundwater source fails to yield 
sufficient water to satisfy the water right;
(iv)
a water right when water is unavailable because of the water right's priority date;
(v)
a water right to store water in a surface reservoir, or an aquifer in accordance with 
Chapter 3b, Groundwater Recharge and Recovery Act
, if the water is stored for 
present or future beneficial use;
(vi)
a water right if a water user has beneficially used substantially all of the water 
right within a seven-year period, provided that this exemption does not apply to 
the adjudication of a water right in a general determination of water rights under 
Chapter 4, Determination of Water Rights;
(vii)
except as provided by Subsection 
(2)(g)
, a water right:
(A)
(I)
owned by a public water supplier;
(II)
represented by a public water supplier's ownership interest in a water 
company; or
(III)
to which a public water supplier owns the right of beneficial use; and
(B)
conserved or held for the reasonable future water requirement of the public, 
which is determined according to Subsection 
(2)(f)
;
(viii)
a supplemental water right during a period of time when another water right 
available to the appropriator or the appropriator's successor in interest provides 
sufficient water so as to not require beneficial use of the supplemental water right;
(ix)
a period of nonuse of a water right during the time the water right is subject to an 
approved change application where the applicant is diligently pursuing 
certification;
(x)
a water right to store water in a surface reservoir if:
(A)
storage is limited by a safety, regulatory, or engineering restraint that the 
appropriator or the appropriator's successor in interest cannot reasonably 
correct; and
(B)
not longer than seven years have elapsed since the limitation described in 
Subsection 
(2)(e)(x)(A)
 is imposed; 
(xi)
a water right subject to an approved change application for use within a water 
bank that has been authorized but not dissolved under Chapter 31, Water Banking 
Act, during the period of time the state engineer authorizes the water right to be 
used within the water bank; or
(xii)
subject to Subsection 
(2)(h)
, that portion of a water right that is quantified as 
saved water in a final order from the state engineer approving a change 
application, but not to exceed the amount subsequently verified by the state 
engineer in a certificate issued under Section 
73-3-17
.
(f)
(i)
The reasonable future water requirement of the public is the amount of water 
needed in the next 40 years by:
(A)
the persons within the public water supplier's reasonably anticipated service 
area based on reasonably anticipated population growth; or
(B)
other water use demand.
(ii)
For purposes of Subsection 
(2)(f)(i)
, a community water system's reasonably 
anticipated service area:
(A)
is the area served by the community water system's distribution facilities; and
(B)
expands as the community water system expands the distribution facilities in 
accordance with Title 19, Chapter 4, Safe Drinking Water Act.
(iii)
The state engineer shall by rule made in accordance with Subsection 73-2-1(4) 
establish standards for a written plan that may be presented as evidence in 
conformance with this Subsection (2)(f), except that before a rule establishing 
standards for a written plan under this Subsection (2)(f) takes effect, in addition to 
complying with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, the 
state engineer shall present the rule to:
(A)
if the Legislature is not in session, the Natural Resources, Agriculture, and 
Environment Interim Committee; or
(B)
if the Legislature is in session, the House of Representatives and Senate 
Natural Resources, Agriculture, and Environment standing committees.
(iii)
In accordance with Subsection 
73-2-1(4)
 and Title 63G, Chapter 3, Utah 
Administrative Rulemaking Act, the state engineer shall make rules to establish 
standards for a written plan under this Subsection 
(2)(f)
 that:
(A)
determines the reasonable future water requirement of the public for a public 
water supplier; and
(B)
a public water supplier shall complete to demonstrate compliance with this 
Subsection 
(2)(f)
.
(iv)
The state engineer shall present rules developed under Subsection 
(2)(f)(iii)
, 
before the rules take effect, to:
(A)
if the Legislature is not in session, the Natural Resources, Agriculture, and 
Environment Interim Committee; or
(B)
if the Legislature is in session, the House and Senate Natural Resources, 
Agriculture, and Environment standing committees.
(v)
The rules that the state engineer makes to establish standards for a written plan in 
accordance with Subsection 
(2)(f)(iii)
 shall include a standard for determining:
(A)
a population estimate, including anticipated population growth, consistent 
with an estimate or methodology under Title 63C, Chapter 20, Utah Population 
Committee;
(B)
an impact of current and future drought conditions;
(C)
an anticipated loss of a water source due to a natural disaster, including an 
earthquake or a change in climate;
(D)
an impact of a water conservation activity described in a public water 
supplier's water conservation plan described in Section 
73-10-32
;
(E)
the amount of water a public water supplier needs per capita; and
(F)
any other factor relevant to establishing the reasonable future water 
requirement of the public for a public water supplier.
(g)
For a water right acquired by a public water supplier on or after May 5, 2008, 
Subsection 
(2)(e)(vii)
 applies if:
(i)
the public water supplier submits a change application under Section 
73-3-3
; and
(ii)
the state engineer approves the change application.
(h)
Saved water does not retain the protection of Subsection 
(2)(e)(xii)
 and any period of 
nonuse for saved water begins to run the day on which:
(i)
the underlying water right that serves as the basis for the saved water is declared 
by court decree to have been lost due to forfeiture under this section; or
(ii)
the title of a right to saved water segregated under Section 
73-3-27
 is conveyed 
independent of the underlying water right.
(3)
(a)
The state engineer shall furnish a nonuse application form requiring the following 
information:
(i)
the name and address of the applicant;
(ii)
a description of the water right or a portion of the water right, including the point 
of diversion, place of use, and priority;
(iii)
the quantity of water;
(iv)
the period of use;
(v)
the extension of time applied for;
(vi)
a statement of the reason for the nonuse of the water; and
(vii)
any other information that the state engineer requires.
(b)
(i)
Upon receipt of the application, the state engineer shall publish a notice of the 
application once a week for two successive weeks:
(A)
in a newspaper of general circulation in the county in which the source of the 
water supply is located and where the water is to be beneficially used; and
(B)
as required in Section 
45-1-101
.
(ii)
The notice shall:
(A)
state that an application has been made; and
(B)
specify where the interested party may obtain additional information relating 
to the application.
(c)
An interested person may file a written protest with the state engineer against the 
granting of the application:
(i)
within 20 days after the notice is published, if the adjudicative proceeding is 
informal; and
(ii)
within 30 days after the notice is published, if the adjudicative proceeding is 
formal.
(d)
In a proceeding to determine whether the nonuse application should be approved or 
rejected, the state engineer shall follow Title 63G, Chapter 4, Administrative 
Procedures Act.
(e)
After further investigation, the state engineer may approve or reject the application.
(4)
(a)
The state engineer shall grant a nonuse application on all or a portion of a water 
right for a period of time not exceeding seven years if the applicant shows a 
reasonable cause for nonuse.
(b)
A reasonable cause for nonuse includes:
(i)
a demonstrable financial hardship or economic depression;
(ii)
a physical cause or change that renders use beyond the reasonable control of the 
water right owner so long as the water right owner acts with reasonable diligence 
to resume or restore the use;
(iii)
the initiation of water conservation or an efficiency practice, or the operation of a 
groundwater recharge recovery program approved by the state engineer;
(iv)
operation of a legal proceeding;
(v)
the holding of a water right or stock in a mutual water company without use by a 
water supply entity to meet the reasonable future requirements of the public;
(vi)
situations where, in the opinion of the state engineer, the nonuse would assist in 
implementing an existing, approved water management plan; or
(vii)
the loss of capacity caused by deterioration of the water supply or delivery 
equipment if the applicant submits, with the application, a specific plan to resume 
full use of the water right by replacing, restoring, or improving the equipment.
(5)
(a)
Sixty days before the expiration of a nonuse application, the state engineer shall 
notify the applicant by mail or by a form of electronic communication through which 
receipt is verifiable, of the date when the nonuse application will expire.
(b)
An applicant may file a subsequent nonuse application in accordance with this 
section.
Section 52. 
Effective Date.
(1)
Except as provided in Subsection (2), this bill takes effect 
May 6, 2026
.
(2)
The actions affecting Section 10-21-304 
Effective 
10/01/26
 take effect on 
October 1, 
2026
.
3-12-26 12:11 PM