Rep. Norm Thurston — Voting Record

Utah House District 62 · complete roll-call record from le.utah.gov
← All votes

Bill

Water Infrastructure Amendments
Number
H.B. 489 (2026GS)
Sponsor
Rep. Peterson, Thomas W.
Final action
House/ filed 3/6/2026
Outcome
Failed / filed without passage

Summary

This bill addresses use of retention and detention basins.

What it does

  • This bill:
  • defines terms;
  • limits use of retention basins within the Great Salt Lake basin;
  • imposes design standards on certain detention basins within the Great Salt Lake basin; and
  • makes technical and conforming changes.

Every vote on this bill

2026-02-18House Comm - Favorable Recommendation
House Public Utilities and Energy Committee
10-0-2not eligible / no record
2026-03-02Senate Comm - Favorable Recommendation
Senate Revenue and Taxation Committee
5-0-2not eligible / no record
2026-02-24House/ circled
House 3rd Reading Calendar for House bills
0-0-75not eligible / no record
2026-02-24House/ uncircled
House 3rd Reading Calendar for House bills
0-0-75not eligible / no record
2026-02-24House/ floor amendment
House 3rd Reading Calendar for House bills
0-0-75not eligible / no record
2026-02-24House/ passed 3rd reading
Senate Secretary
60-5-10YEA

Bill text

introduced version · official source
17
19-5-108.5
0
Water Infrastructure Amendments
2026 GENERAL SESSION
STATE OF UTAH
Chief Sponsor: Thomas W. Peterson
Senate Sponsor: Calvin R. Musselman
LONG TITLE
General Description:
This bill addresses use of retention and detention basins.
Highlighted Provisions:
This bill:
defines terms;
limits use of retention basins within the Great Salt Lake basin;
imposes design standards on certain detention basins within the Great Salt Lake basin; and
makes technical and conforming changes.
Money Appropriated in this Bill:
None
Other Special Clauses:
None
Utah Code Sections Affected:
AMENDS:
19-5-108.5
, as last amended by Laws of Utah 2024, Chapter 438
Be it enacted by the Legislature of the state of Utah:
Section 1. Section 
19-5-108.5
 is amended to read:
19-5-108.5
. Storm water permits.
(1)
As used in this section:
(a)
"Applicant" means a person who
 is conducting or proposing 
:
(i)
conducts or proposes 
to conduct a use of land
;
 and
 who
(ii)
a permittee requires or allows to use low impact development.
(b)
"Detention basin" means a best management practice designed to temporarily capture 
and store storm water runoff, releasing the storm water runoff slowly over time to:
(i)
prevent downstream flooding;
(ii)
reduce erosion; and
(iii)
improve water quality by allowing sediment to settle out.
(c)
"Great Salt Lake basin" means the area within:
(i)
the surveyed meander line of the Great Salt Lake;
(ii)
the drainage areas of the Bear River or the Bear River's tributaries;
(iii)
the drainage areas of Bear Lake or Bear Lake's tributaries;
(iv)
the drainage areas of the Weber River or the Weber River's tributaries;
(v)
the drainage areas of the Jordan River or the Jordan River's tributaries;
(vi)
the drainage areas of Utah Lake or Utah Lake's tributaries;
(vii)
other water drainages lying between the Bear River and the Jordan River that are 
tributary to the Great Salt Lake and not included in the drainage areas described in 
Subsections 
(1)(c)(ii)
 through 
(vi)
; and
(viii)
the drainage area of Tooele Valley.
(b)
(d)
"Independent review" is a review conducted:
(i)
in accordance with this section; and
(ii)
by an engineer
,
 or engineering firm, designated by the division as having 
technical expertise in the area of storm water calculations.
(c)
(e)
"Low impact development" means 
a 
structural or natural engineered 
systems
system
 located close to the source of storm water that 
use or mimic
uses or mimics
natural processes to encourage infiltration, evapotranspiration, or reuse of the storm 
water.
(d)
(f)
"Permittee" means a municipality or county with a storm water permit under the 
Utah Pollutant Discharge Elimination System.
(g)
"Retention basin" means a best management practice designed to hold water to 
manage storm water runoff by capturing the storm water runoff to:
(i)
reduce peak flow rates to prevent flooding; and
(ii)
improve water quality through sedimentation.
(e)
(h)
"Storm water" means storm water runoff, snow melt runoff, and surface runoff 
and drainage.
(f)
(i)
"Storm water permit" means a permit issued to a permittee by the division for the 
permittee's municipal separate storm sewer system.
(g)
(j)
"Utah Pollutant Discharge Elimination System" means the state-wide program 
for issuing, modifying, revoking and reissuing, terminating, monitoring and enforcing 
permits
a permit
 under this chapter.
(2)
A permittee shall reduce any requirement for an applicant to manage or control storm 
water runoff rates or storm water runoff volumes for flood control purposes to account 
for the reduction in storm water associated with approved low impact development 
practices.
(3)
The director shall create and maintain a list of engineers, including engineering firms, 
capable of providing independent review of low impact development designs and storm 
water calculations for use by an applicant and a permittee pursuant to an appeal 
described in Subsection 
(4)
.
(4)
(a)
An applicant who appeals a permittee's determination regarding post-construction 
retention requirements under the permittee's storm water permit may request the 
permittee to refer the appeal to independent review for purposes of determining the 
technical aspects of the appeal, including:
(i)
the required size of any low impact development system;
(ii)
the calculations of reductions in storm water runoff rates or storm water runoff 
volumes for flood control due to the use of low impact development; and
(iii)
the feasibility of constructing low impact development practices required by the 
permittee.
(b)
(i)
If an applicant makes a request under Subsection 
(4)(a)
:
,
(i)
the permittee shall:
(A)
select an engineer or engineering firm from the list described in Subsection 
(3)
; 
and
(B)
pay one-half of the cost of the independent review.
(ii)
An 
A permittee may not select an 
engineer or engineering firm
 selected by the 
permittee
 under Subsection 
(4)(b)(i)
 may not be
:
(A)
associated with the application that is the subject of the appeal; or
(B)
employed by the permittee.
(iii)
The applicant shall pay:
(A)
one-half of the cost of the independent review; and
(B)
the municipality's published appeal fee.
(5)
(a)
For long-term storm water management control, a permittee in the Great Salt Lake 
basin shall prioritize a low impact development practice other than use of a retention 
basin, unless the applicant establishes to the satisfaction of the permittee that no 
feasible alternative to use of a retention basin is available.
(b)
If a detention basin is required for post-construction retention requirements in the 
Great Salt Lake basin, the applicant shall design the detention basin to release all 
water as soon as possible, except that the design of the detention basin may not 
interfere with flood control management or drainage system capacity.
Section 2. 
Effective Date.
This bill takes effect on 
May 6, 2026
.
2-4-26 10:43 AM