Rep. Norm Thurston — Voting Record

Utah House District 62 · complete roll-call record from le.utah.gov
← All votes

Bill

Environmental Quality Modifications
Number
S.B. 159 (2025GS)
Sponsor
Sen. Stratton, Keven J.
Final action
Governor Signed 3/24/2025
Outcome
Became law — signed by Gov. Spencer J. Cox

Summary

This bill addresses nonhazardous solid waste.

What it does

  • This bill:
  • prohibits approval of an operation plan or permit for certain nonhazardous solid waste landfill facilities unless specific conditions are met;
  • addresses the treatment of certain existing nonhazardous solid waste facilities; and
  • makes technical changes.

Every vote on this bill

1/31/2025Senate Comm - Substitute Recommendation
Senate Natural Resources, Agriculture, and Environment Committee
6-0-1not eligible / no record
1/31/2025Senate Comm - Favorable Recommendation
Senate Natural Resources, Agriculture, and Environment Committee
6-0-1not eligible / no record
2/10/2025Senate/ passed 2nd reading
Senate 3rd Reading Calendar
25-0-4not eligible / no record
2/11/2025Senate/ passed 3rd reading
Clerk of the House
28-0-1not eligible / no record
2/24/2025House Comm - Favorable Recommendation
House Natural Resources, Agriculture, and Environment Committee
11-0-3not eligible / no record
2/26/2025House/ passed 3rd reading
House Speaker
69-0-6ABSENT

Bill text

enrolled version · official source
3
19-6-108
0
Environmental Quality Modifications
2025 GENERAL SESSION
STATE OF UTAH
Chief Sponsor: Keven J. Stratton
House Sponsor: Carl R. Albrecht
LONG TITLE
General Description:
This bill addresses nonhazardous solid waste.
Highlighted Provisions:
This bill:
prohibits approval of an operation plan or permit for certain nonhazardous solid waste 
landfill facilities unless specific conditions are met; 
addresses the treatment of certain existing nonhazardous solid waste facilities; and
makes technical changes.
Money Appropriated in this Bill:
None
Other Special Clauses:
None
Utah Code Sections Affected:
AMENDS:
19-6-108
, as last amended by Laws of Utah 2021, Chapter 302
Be it enacted by the Legislature of the state of Utah:
Section 1, Section 
19-6-108
 is amended to read:
19-6-108
. New nonhazardous solid or hazardous waste operation plans for 
facility or site -- Approval required -- Exemptions from legislative and gubernatorial 
approval -- Time periods for review -- Information required -- Other conditions -- 
Automatic revocation of approval -- Periodic review.
(1)
For purposes of this section, the following items shall be treated as submission of a new 
operation plan:
(a)
the submission of a revised operation plan specifying a different geographic site than 
a previously submitted plan;
(b)
an application for modification of a commercial hazardous waste incinerator if the 
construction or the modification would increase the hazardous waste incinerator 
capacity above the capacity specified in the operation plan as of January 1, 1990, or 
the capacity specified in the operation plan application as of January 1, 1990, if no 
operation plan approval has been issued as of January 1, 1990;
(c)
an application for modification of a commercial nonhazardous solid waste 
incinerator if the construction of the modification would cost 50% or more of the cost 
of construction of the original incinerator or the modification would result in an 
increase in the capacity or throughput of the incinerator of a cumulative total of 50% 
above the total capacity or throughput that was approved in the operation plan as of 
January 1, 1990, or the initial approved operation plan if the initial approval is 
subsequent to January 1, 1990;
(d)
an application for modification of a commercial nonhazardous solid or hazardous 
waste treatment, storage, or disposal facility, other than an incinerator, if the 
modification would be outside the boundaries of the property owned or controlled by 
the applicant, as shown in the application or approved operation plan as of January 1, 
1990, or the initial approved operation plan if the initial approval is subsequent to 
January 1, 1990; or
(e)
a submission of an operation plan to construct a facility, if previous approvals of the 
operation plan to construct the facility have been revoked pursuant to Subsection 
(3)(c)(iv)
 or 
(v)
.
(2)
Capacity under Subsection 
(1)(b)
 shall be calculated based on the throughput tonnage 
specified for the trial burn in the operation plan or the operation plan application if no 
operation plan approval has been issued as of January 1, 1990, and on annual operations 
of 7,000 hours.
(3)
(a)
(i)
Except as specified in Subsection 
(3)(a)(ii)(C)
, a person may not own, 
construct, modify, or operate a facility or site for the purpose of transferring, 
treating, or disposing of nonhazardous solid waste or treating, storing, or 
disposing of hazardous waste without first submitting and receiving the approval 
of the director for an operation plan for that facility or site.
(ii)
(A)
A permittee who is the current owner of a facility or site that is subject to 
an operation plan may submit to the director information, a report, a plan, or 
other request for approval for a proposed activity under an operation plan:
(I)
after obtaining the consent of any other permittee who is a current owner of 
the facility or site; and
(II)
without obtaining the consent of any other permittee who is not a current 
owner of the facility or site.
(B)
The director may not:
(I)
withhold an approval of an operation plan requested by a permittee who is a 
current owner of the facility or site on the grounds that another permittee 
who is not a current owner of the facility or site has not consented to the 
request; or
(II)
give an approval of an operation plan requested by a permittee who is not a 
current owner before receiving consent of the current owner of the facility 
or site.
(C)
A facility referred to in Subsection 
(3)(a)(i)
 does not include a facility when 
the waste from the extraction, beneficiation, and processing of ores and 
minerals listed in 40 C.F.R. Sec. 261.4(b)(7)(ii), or cement kiln dust, is 
generated and the disposal occurs at an on-site location owned and operated by 
the generator of the waste.
(b)
(i)
Except for a facility that receives the following wastes solely for the purpose of 
recycling, reuse, or reprocessing, a person may not own, construct, modify, or 
operate any commercial facility that accepts for treatment or disposal, with the 
intent to make a profit, any of the wastes listed in Subsection 
(3)(b)(ii)
 without 
first submitting a request to and receiving the approval of the director for an 
operation plan for that facility site.
(ii)
Wastes referred to in Subsection 
(3)(b)(i)
 are:
(A)
fly ash waste, bottom ash waste, slag waste, or flue gas emission control waste 
generated primarily from the combustion of coal or other fossil fuels;
(B)
wastes from the extraction, beneficiation, and processing of ores and minerals; 
or
(C)
cement kiln dust wastes.
(c)
(i)
A person may not construct a facility listed under Subsection 
(3)(c)(ii)
 until the 
person receives:
(A)
local government approval and the approval described in Subsection 
(3)(a)
;
(B)
approval from the Legislature that, on and after May 5, 2021, is required to be 
obtained after the person submits an application under this section; and
(C)
after receiving the approvals described in Subsections 
(3)(c)(i)(A)
 and 
(B)
, 
approval from the governor.
(ii)
A facility referred to in Subsection 
(3)(c)(i)
 is:
(A)
a commercial nonhazardous solid waste disposal facility;
(B)
except for a facility that receives a waste listed in Subsection 
(3)(c)(iii)
, solely 
for the purpose of recycling, reuse, or reprocessing, any commercial facility 
that accepts for treatment or disposal, with the intent to make a profit; or
(C)
a commercial hazardous waste treatment, storage, or disposal facility.
(iii)
Subsection 
(3)(c)(ii)(B)
 applies to the following wastes:
(A)
fly ash waste, bottom ash waste, slag waste, or flue gas emission control waste 
generated primarily from the combustion of coal or other fossil fuels;
(B)
wastes from the extraction, beneficiation, and processing of ores and minerals; 
or 
(C)
cement kiln dust wastes.
(iv)
The required approvals described in Subsection 
(3)(c)(i)
 for a facility described 
in Subsection 
(3)(c)(ii)(A)
 or 
(B)
 are automatically revoked if:
(A)
the governor's approval is received on or after May 10, 2011, and the facility 
is not operational within five years after the day on which the governor's 
approval is received; or
(B)
the governor's approval is received before May 10, 2011, and the facility is not 
operational on or before May 10, 2016.
(v)
For legislative approval described in Subsection 
(3)(c)(i)(B)
, the required 
legislative approval for a facility described in Subsection 
(3)(c)(ii)
 is 
automatically revoked if:
(A)
after receiving the legislative approval, the person seeking to construct the 
facility withdraws the application submitted under this section by providing the 
division a written statement of withdrawal for the facility that is the basis of the 
legislative approval; or
(B)
after five years from the day on which the required legislative approval takes 
effect, the application for the facility is not approved by the division.
(vi)
The required approvals described in Subsection 
(3)(c)(i)
 for a facility described 
in Subsection 
(3)(c)(ii)(A)
 or 
(B)
, including the approved operation plan, are not 
transferrable to another person for five years after the day on which the governor's 
approval is received.
(d)
A person need not obtain gubernatorial or legislative approval for the construction of 
a hazardous waste facility for which an operating plan has been approved by or 
submitted for approval to the executive secretary of the board under this section 
before April 24, 1989, and which has been determined, on or before December 31, 
1990, by the executive secretary of the board to be complete, in accordance with state 
and federal requirements for operating plans for hazardous waste facilities even if a 
different geographic site is subsequently submitted.
(e)
A person need not obtain gubernatorial and legislative approval for the construction 
of a commercial nonhazardous solid waste disposal facility for which an operation 
plan has been approved by or submitted for approval to the executive secretary of the 
board under this section on or before January 1, 1990, and which, on or before 
December 31, 1990, the executive secretary of the board determines to be complete, 
in accordance with state and federal requirements applicable to operation plans for 
nonhazardous solid waste facilities.
(f)
A person owning or operating a facility or site on or before November 19, 1980, who 
has given timely notification as required by Section 3010 of the Resource 
Conservation and Recovery Act of 1976, 42 U.S.C. Sec. 6921, et seq., and who has 
submitted a proposed hazardous waste plan under this section for that facility or site, 
may continue to operate that facility or site without violating this section until the 
plan is approved or disapproved under this section.
(g)
(i)
The director shall suspend acceptance of further applications for a commercial 
nonhazardous solid or hazardous waste facility upon a finding that the director 
cannot adequately oversee existing and additional facilities for permit compliance, 
monitoring, and enforcement.
(ii)
The director shall report any suspension to the Natural Resources, Agriculture, 
and Environment Interim Committee.
(4)
The director shall review a proposed nonhazardous solid or hazardous waste operation 
plan to determine whether that plan complies with this part and the applicable rules of 
the board.
(5)
(a)
If the facility is a class I or class II facility, the director shall approve or 
disapprove that plan within 270 days from the date the plan is submitted.
(b)
Within 60 days after receipt of the plans, specifications, or other information 
required by this section for a class I or II facility, the director shall determine whether 
the plan is complete and contains the information necessary to process the plan for 
approval.
(c)
(i)
If the plan for a class I or II facility is determined to be complete, the director 
shall issue a notice of completeness.
(ii)
If the plan is determined by the director to be incomplete, the director shall issue 
a notice of deficiency, listing the additional information to be provided by the 
owner or operator to complete the plan.
(d)
The director shall review information submitted in response to a notice of deficiency 
within 30 days after receipt.
(e)
The following time periods may not be included in the 270 day plan review period 
for a class I or II facility:
(i)
time awaiting response from the owner or operator to requests for information 
issued by the director;
(ii)
time required for public participation and hearings for issuance of plan approvals; 
and
(iii)
time for review of the permit by other federal or state government agencies.
(6)
(a)
If the facility is a class III or class IV facility, the director shall approve or 
disapprove that plan within 365 days from the date the plan is submitted.
(b)
The following time periods may not be included in the 365 day review period:
(i)
time awaiting response from the owner or operator to requests for information 
issued by the director;
(ii)
time required for public participation and hearings for issuance of plan approvals; 
and
(iii)
time for review of the permit by other federal or state government agencies.
(7)
If, within 365 days after receipt of a modification request or closure plan for any 
facility, the director determines that the proposed plan or request, or any part of the 
proposed plan or request, will not comply with applicable rules, the director shall issue 
an order prohibiting any action under the proposed plan or request for modification or 
closure in whole or in part.
(8)
A person who owns or operates a facility or site required to have an approved hazardous 
waste operation plan under this section and who has pending a permit application before 
the United States Environmental Protection Agency shall be treated as having an 
approved plan until final administrative disposition of the permit application is made 
under this section, unless the director determines that final administrative disposition of 
the application has not been made because of the failure of the owner or operator to 
furnish any information requested, or the facility's interim status has terminated under 
Section 3005
(e) of the Resource Conservation and Recovery Act, 42 U.S.C. Sec. 6925
(e).
(9)
The director may not approve a proposed nonhazardous solid or hazardous waste 
operation plan unless the plan contains the information that the board requires, including:
(a)
estimates of the composition, quantities, and concentrations of any hazardous waste 
identified under this part and the proposed treatment, storage, or disposal of the 
hazardous waste;
(b)
evidence that the transfer, treatment, or disposal of nonhazardous solid waste or 
treatment, storage, or disposal of hazardous waste will not be done in a manner that 
may cause or significantly contribute to an increase in mortality, an increase in 
serious irreversible or incapacitating reversible illness, or pose a substantial present 
or potential hazard to human health or the environment;
(c)
consistent with the degree and duration of risks associated with the transfer, 
treatment, or disposal of nonhazardous solid waste or treatment, storage, or disposal 
of specified hazardous waste, evidence of financial responsibility in whatever form 
and amount that the director determines is necessary to ensure continuity of operation 
and that upon abandonment, cessation, or interruption of the operation of the facility 
or site, the reasonable measures consistent with the available knowledge will be taken 
to ensure that the waste subsequent to being treated, stored, or disposed of at the site 
or facility will not present a hazard to the public or the environment;
(d)
evidence that the personnel employed at the facility or site have education and 
training for the safe and adequate handling of nonhazardous solid or hazardous waste;
(e)
plans, specifications, and other information that the director considers relevant to 
determine whether the proposed nonhazardous solid or hazardous waste operation 
plan will comply with this part and the rules of the board;
(f)
compliance schedules, when applicable, including schedules for corrective action or 
other response measures for releases from a solid waste management unit at the 
facility, regardless of the time the waste was placed in the unit;
(g)
for a proposed operation plan submitted on or after July 1, 2013, for a new solid or 
hazardous waste facility other than a water treatment facility that treats, stores, or 
disposes site-generated solid or hazardous waste onsite, a traffic impact study that:
(i)
takes into consideration the safety, operation, and condition of roadways serving 
the proposed facility; and
(ii)
is reviewed and approved by the Department of Transportation or a local highway 
authority, whichever has jurisdiction over each road serving the proposed facility, 
with the cost of the review paid by the person who submits the proposed operation 
plan; and
(h)
for a proposed operation plan submitted on or after July 1, 2013, for a new 
nonhazardous solid waste facility owned or operated by a local government, financial 
information that discloses the costs of establishing and operating the facility, 
including:
(i)
land acquisition and leasing;
(ii)
construction;
(iii)
estimated annual operation;
(iv)
equipment;
(v)
ancillary structures;
(vi)
roads;
(vii)
transfer stations; and
(viii)
using other operations that are not contiguous to the proposed facility but are 
necessary to support the facility's construction and operation.
(10)
The director may not approve a commercial nonhazardous solid or hazardous waste 
operation plan that meets the requirements of Subsection 
(9)
 unless the operation plan 
contains the information required by the board, including:
(a)
evidence that the proposed commercial facility has a proven market of nonhazardous 
solid or hazardous waste, including:
(i)
information on the source, quantity, and price charged for treating, storing, and 
disposing of potential nonhazardous solid or hazardous waste in the state and 
regionally;
(ii)
a market analysis of the need for a commercial facility given existing and 
potential generation of nonhazardous solid or hazardous waste in the state and 
regionally; and
(iii)
a review of other existing and proposed commercial nonhazardous solid or 
hazardous waste facilities regionally and nationally that would compete for the 
treatment, storage, or disposal of the nonhazardous solid or hazardous waste;
(b)
a description of the public benefits of the proposed facility, including:
(i)
the need in the state for the additional capacity for the management of 
nonhazardous solid or hazardous waste;
(ii)
the energy and resources recoverable by the proposed facility;
(iii)
the reduction of nonhazardous solid or hazardous waste management methods, 
that are less suitable for the environment, that would be made possible by the 
proposed facility; and
(iv)
whether any other available site or method for the management of hazardous 
waste would be less detrimental to the public health or safety or to the quality of 
the environment; and
(c)
compliance history of an owner or operator of a proposed commercial nonhazardous 
solid or hazardous waste treatment, storage, or disposal facility, that may be applied 
by the director in a nonhazardous solid or hazardous waste operation plan decision, 
including any plan conditions.
(11)
The director may not approve a commercial nonhazardous solid or hazardous waste 
facility operation plan unless based on the application, and in addition to the 
determination required in Subsections 
(9)
 and 
(10)
, the director determines that:
(a)
the probable beneficial environmental effect of the facility to the state outweighs the 
probable adverse environmental effect; and
(b)
there is a need for the facility to serve industry within the state.
(12)
(a)
The director may not approve an operation plan or permit for a nonhazardous 
solid waste class VII landfill facility unless, based on the application, the operation 
plan and permit contain engineering plans and specifications for cell design that 
includes:
(i)
an impervious synthetic liner system that has hydraulic conductivity no greater 
than 1E-7 centimeters per second; or
(ii)
a clay liner system equivalent to a liner system described in Subsection (12)(a)(i).
(b)
A nonhazardous solid waste class VII landfill facility is considered to have an 
approved operation plan or permit for purposes of Subsection (12)(a) if the 
nonhazardous solid waste class VII landfill facility:
(i)
on January 1, 2025, was permitted by the Division of Oil, Gas, and Mining; and
(ii)
on or before May 7, 2025, obtains a temporary permit, as defined by rule made in 
accordance with Title 63G, Chapter 3, Utah Administrative Rulemaking Act, for 
the nonhazardous solid waste class VII landfill facility.
(c)
Notwithstanding Subsection 
(12)(b)
, a nonhazardous solid waste class VII landfill 
facility described in Subsection (12)(b) shall ensure that as of July 1, 2030, each cell 
within the nonhazardous solid waste class VII landfill facility has:
(i)
an impervious synthetic liner system that has hydraulic conductivity no greater 
than 1E-7 centimeters per second; or
(ii)
a clay liner system equivalent to a liner system described in Subsection (12)(c)(i).
(12)
(13)
Approval of a nonhazardous solid or hazardous waste operation plan may be 
revoked, in whole or in part, if the person to whom approval of the plan has been given 
fails to comply with that plan.
(13)
(14)
The director shall review approved nonhazardous solid and hazardous waste 
operation plans at least once every five years.
(14)
(15)
Subsections 
(10)
 and 
(11)
 do not apply to a hazardous waste facility in existence 
or to an application filed or pending in the department before April 24, 1989, that are 
determined by the executive secretary of the board on or before December 31, 1990, to 
be complete, in accordance with state and federal requirements applicable to operation 
plans for hazardous waste facilities.
(15)
(16)
Subsections 
(9)
, 
(10)
, and 
(11)
 do not apply to a nonhazardous solid waste 
facility in existence or to an application filed or pending in the department before 
January 1, 1990, that is determined by the director, on or before December 31, 1990, to 
be complete in accordance with state and federal requirements applicable to operation 
plans for nonhazardous solid waste facilities.
(16)
(17)
Nonhazardous solid waste generated outside of this state that is defined as 
hazardous waste in the state where the nonhazardous solid waste is generated and that is 
received for disposal in this state may not be disposed of at a nonhazardous waste 
disposal facility owned and operated by local government or a facility under contract 
with a local government solely for disposal of nonhazardous solid waste generated 
within the boundaries of the local government, unless disposal is approved by the 
director.
(17)
(18)
This section may not be construed to exempt a facility from applicable regulation 
under the federal Atomic Energy Act, 42 U.S.C. Sec. 2014 and 2021 through 2114.
Section 2. 
Effective Date.
This bill takes effect on 
May 7, 2025
.
3-6-25 12:58 PM