Bill
Solar Power Amendments
- Number
- H.B. 340 (2025GS)
- Sponsor
- Rep. Ward, Raymond P.
- Final action
- Governor Signed 3/25/2025
- Outcome
- Became law — signed by Gov. Spencer J. Cox
Summary
This bill modifies provisions related to residential solar energy generation by creating a new category for small portable solar generation devices.
What it does
- This bill:
- defines terms;
- creates exemptions from interconnection requirements for portable solar generation devices;
- establishes basic safety requirements for portable solar generation devices; and
- provides liability protections for electrical corporations.
Every vote on this bill
2/4/2025House Comm - Substitute Recommendation
House Public Utilities and Energy Committee
8-0-5not eligible / no record2/4/2025House Comm - Favorable Recommendation
House Public Utilities and Energy Committee
8-0-5not eligible / no record2/13/2025House/ passed 3rd reading
Senate Secretary
72-0-3YEA2/19/2025Senate Comm - Favorable Recommendation
Senate Transportation, Public Utilities, Energy, and Technology Committee
5-0-3not eligible / no record2/26/2025Senate/ circled
Senate 2nd Reading Calendar
0-0-29not eligible / no record2/27/2025Senate/ uncircled
Senate 2nd Reading Calendar
0-0-29not eligible / no record2/27/2025Senate/ passed 2nd reading
Senate 3rd Reading Calendar
27-0-2not eligible / no record2/28/2025Senate/ circled
Senate 3rd Reading Calendar
0-0-29not eligible / no record2/28/2025Senate/ uncircled
Senate 3rd Reading Calendar
0-0-29not eligible / no record2/28/2025Senate/ passed 3rd reading
Senate President
26-0-3not eligible / no recordBill text
enrolled version · official source
5 54-15-102 54-15-601 0 Solar Power Amendments 2025 GENERAL SESSION STATE OF UTAH Chief Sponsor: Raymond P. Ward Senate Sponsor: Wayne A. Harper LONG TITLE General Description: This bill modifies provisions related to residential solar energy generation by creating a new category for small portable solar generation devices. Highlighted Provisions: This bill: defines terms; creates exemptions from interconnection requirements for portable solar generation devices; establishes basic safety requirements for portable solar generation devices; and provides liability protections for electrical corporations. Money Appropriated in this Bill: None Other Special Clauses: None Utah Code Sections Affected: AMENDS: 54-15-102 , as last amended by Laws of Utah 2014, Chapter 53 ENACTS: 54-15-601 , Utah Code Annotated 1953 Be it enacted by the Legislature of the state of Utah: Section 1, Section 54-15-102 is amended to read: 54-15-102 . Definitions. As used in this chapter: (1) "Annualized billing period" means: (a) a 12-month billing cycle beginning on April 1 of one year and ending on March 31 of the following year; or (b) an additional 12-month billing cycle as defined by an electrical corporation's net metering tariff or rate schedule. (2) "Customer-generated electricity" means electricity that: (a) is generated by a customer generation system for a customer participating in a net metering program; (b) exceeds the electricity the customer needs for the customer's own use; and (c) is supplied to the electrical corporation administering the net metering program. (3) "Customer generation system": (a) means an eligible facility that is used to supply energy to or for a specific customer that: (i) has a generating capacity of: (A) more than 1,200 watts but not more than 25 kilowatts for a residential facility; or (B) not more than two megawatts for a non-residential facility, unless the governing authority approves a greater generation capacity; (ii) is located on, or adjacent to, the premises of the electrical corporation's customer, subject to the electrical corporation's service requirements; (iii) operates in parallel and is interconnected with the electrical corporation's distribution facilities; (iv) is intended primarily to offset part or all of the customer's requirements for electricity; and (v) is controlled by an inverter; and (b) includes an electric generator and its accompanying equipment package . ; and (c) does not include a portable solar generation device. (4) "Eligible facility" means a facility that uses energy derived from one of the following to generate electricity: (a) solar photovoltaic and solar thermal energy; (b) wind energy; (c) hydrogen; (d) organic waste; (e) hydroelectric energy; (f) waste gas and waste heat capture or recovery; (g) biomass and biomass byproducts, except for the combustion of: (i) wood that has been treated with chemical preservatives such as creosote, pentachlorophenol, or chromated copper arsenate; or (ii) municipal waste in a solid form; (h) forest or rangeland woody debris from harvesting or thinning conducted to improve forest or rangeland ecological health and to reduce wildfire risk; (i) agricultural residues; (j) dedicated energy crops; (k) landfill gas or biogas produced from organic matter, wastewater, anaerobic digesters, or municipal solid waste; or (l) geothermal energy. (5) "Equipment package" means a group of components connecting an electric generator to an electric distribution system, including all interface equipment and the interface equipment's controls, switchgear, inverter, and other interface devices. (6) "Excess customer-generated electricity" means the amount of customer-generated electricity in excess of the customer's consumption from the customer generation system during a monthly billing period, as measured at the electrical corporation's meter. (7) "Fuel cell" means a device in which the energy of a reaction between a fuel and an oxidant is converted directly and continuously into electrical energy. (8) "Governing authority" means: (a) for a distribution electrical cooperative, its board of directors; and (b) for each other electrical corporation, the Public Service Commission. (9) "Inverter" means a device that: (a) converts direct current power into alternating current power that is compatible with power generated by an electrical corporation; and (b) has been designed, tested, and certified to UL1741 and installed and operated in accordance with the latest revision of IEEE1547, as amended. (10) "Net electricity" means the difference, as measured at the meter owned by the electrical corporation between: (a) the amount of electricity that an electrical corporation supplies to a customer participating in a net metering program; and (b) the amount of customer-generated electricity delivered to the electrical corporation. (11) "Net metering" means measuring the amount of net electricity for the applicable billing period. (12) "Net metering program" means a program administered by an electrical corporation whereby a customer with a customer generation system may: (a) generate electricity primarily for the customer's own use; (b) supply customer-generated electricity to the electrical corporation; and (c) if net metering results in excess customer-generated electricity during a billing period, receive a credit as provided in Section 54-15-104 . (13) "Portable solar generation device" means a moveable photovoltaic generation device that: (a) has a maximum power output of not more than 1,200 watts; (b) is designed to be connected to a building's electrical system through a standard 120-volt alternating current outlet; (c) is intended primarily to offset part of the customer's electricity consumption; (d) meets the standards of the most recent version of the National Electrical Code; and (e) is certified by Underwriters Laboratories or an equivalent nationally recognized testing laboratory. (13) (14) "Switchgear" means the combination of electrical disconnects, fuses, or circuit breakers: (a) used to: (i) isolate electrical equipment; and (ii) de-energize equipment to allow work to be performed or faults downstream to be cleared; and (b) that is: (i) designed, tested, and certified to UL1741; and (ii) installed and operated in accordance with the latest revision of IEEE1547, as amended. Section 2, Section 54-15-601 is enacted to read: 6. Portable Solar Generation Device 54-15-601 . Portable solar generation device -- Exemptions -- Requirements. (1) A portable solar generation device that meets the requirements of this part: (a) is exempt from: (i) the interconnection requirements described in Section 54-15-106 ; and (ii) requirements to enter into an interconnection agreement under Section 54-15-103 ; and (b) is not subject to the net metering program requirements under this chapter. (2) A portable solar generation device shall include a device or feature that prevents the system from energizing the building's electrical system during a power outage. (3) An electrical corporation: (a) may not require a customer using a portable solar generation device to: (i) obtain the electrical corporation's approval before installing or using the system; (ii) pay any fee or charge related to the system; or (iii) install any additional controls or equipment beyond what is integrated into the system; and (b) is not liable for any damage or injury caused by a portable solar generation device. Section 3. Effective Date. This bill takes effect on May 7, 2025 . 3-7-25 10:15 PM