Rep. Norm Thurston — Voting Record

Utah House District 62 · complete roll-call record from le.utah.gov
← All votes

Bill

Sustainable Transportation and Energy Plan Act
Number
S.B. 115 Fourth Substitute (2016GS)
Sponsor
Sen. Adams, J. S.
Final action
Governor Signed 3/29/2016
Outcome
Became law — signed by Gov. Gary R. Herbert

Summary

This bill amends provisions related to a public utility providing electrical service.

What it does

  • This bill:
  • defines terms;
  • allows the Public Service Commission to authorize a large-scale electric utility to implement tariffs to provide funding for a sustainable transportation and energy pilot program;
  • allows an electrical corporation to recover 100% of the electrical corporation's prudently incurred costs in an energy balancing account;
  • allows a large-scale electric utility to establish innovative electric efficiency technology programs;
  • allows a large-scale electric utility to provide an incentive for:
  • a generation facility to curtail electricity generation to improve air quality; and
  • creation of an electric vehicle infrastructure;
  • provides that the commission may authorize a large-scale electric utility to implement:
  • a clean coal program; and
  • other utility programs;
  • provides a repeal date;
  • enacts a provision related to withdrawal of notice to transfer electric service; and
  • allows the commission to implement a conservation, efficiency, or technology program if the program is cost-effective and in the public interest.

Every vote on this bill

2/26/2016Senate/ circled
Senate 2nd Reading Calendar
Voice votenot eligible / no record
3/1/2016Senate/ uncircled
Senate 2nd Reading Calendar
Voice votenot eligible / no record
3/1/2016Senate/ substituted from # 0 to # 1
Senate 2nd Reading Calendar
Voice votenot eligible / no record
3/1/2016Senate/ passed 2nd reading
Senate 3rd Reading Calendar
20 7 2not eligible / no record
3/2/2016Senate/ circled
Senate 3rd Reading Calendar
Voice votenot eligible / no record
3/3/2016Senate/ uncircled
Senate 3rd Reading Calendar
Voice votenot eligible / no record
3/3/2016Senate/ substituted from # 1 to # 3
Senate 3rd Reading Calendar
Voice votenot eligible / no record
3/3/2016Senate/ floor amendment # 1
Senate 3rd Reading Calendar
Voice votenot eligible / no record
3/3/2016Senate/ circled
Senate 3rd Reading Calendar
Voice votenot eligible / no record
3/4/2016Senate/ uncircled
Senate 3rd Reading Calendar
Voice votenot eligible / no record
3/4/2016Senate/ floor amendment # 2
Senate 3rd Reading Calendar
Voice votenot eligible / no record
3/4/2016Senate/ passed 3rd reading
Clerk of the House
20 7 2not eligible / no record
3/10/2016House/ floor amendment # 3
House 3rd Reading Calendar for Senate bills
Voice votenot eligible / no record
3/10/2016House/ floor amendment # 4
House 3rd Reading Calendar for Senate bills
Voice votenot eligible / no record
3/10/2016House/ floor amendment failed # 2
House 3rd Reading Calendar for Senate bills
Voice votenot eligible / no record
3/10/2016House/ floor amendment failed # 5
House 3rd Reading Calendar for Senate bills
Voice votenot eligible / no record
3/10/2016House/ failed
Clerk of the House
33 40 2NAY
3/10/2016House/ motion to reconsider
Clerk of the House
49 24 2YEA
3/10/2016House/ passed 3rd reading
Senate Secretary
46 26 3NAY
3/10/2016Senate/ concurs with House amendment
House Speaker
20 8 1not eligible / no record

Bill text

enrolled version · official source
SUSTAINABLE TRANSPORTATION AND ENERGY PLAN ACT
GENERAL SESSION
STATE OF UTAH
Chief Sponsor: J. Stuart Adams
House Sponsor: 
V. Lowry Snow
LONG TITLE
General Description:
This bill amends provisions related to a public utility providing electrical service.
Highlighted Provisions:
This bill:
▸ defines terms;
▸ allows the Public Service Commission to authorize a large-scale electric utility to
implement tariffs to provide funding for a sustainable transportation and energy
pilot program;
▸ allows an electrical corporation to recover 100% of the electrical corporation's
prudently incurred costs in an energy balancing account;
▸ allows a large-scale electric utility to establish innovative electric efficiency
technology programs;
▸ allows a large-scale electric utility to provide an incentive for:
• a generation facility to curtail electricity generation to improve air quality; and
• creation of an electric vehicle infrastructure;
▸ provides that the commission may authorize a large-scale electric utility to
implement:
• a clean coal program; and
• other utility programs;
▸ provides a repeal date;
▸ enacts a provision related to withdrawal of notice to transfer electric service; and
▸ allows the commission to implement a conservation, efficiency, or technology
program if the program is cost-effective and in the public interest.
Money Appropriated in this Bill:
None
Other Special Clauses:
None
Utah Code Sections Affected:
AMENDS:
54-2-1
, as last amended by Laws of Utah 2014, Chapters 20, 381, and 388
54-7-12.8
, as last amended by Laws of Utah 2009, Chapter 237
54-7-13.5
, as enacted by Laws of Utah 2009, Chapter 319
54-17-801
, as last amended by Laws of Utah 2014, Chapter 34
63I-1-254
, as last amended by Laws of Utah 2013, Chapter 311
ENACTS:
54-3-33
, Utah Code Annotated 1953
54-17-806
, Utah Code Annotated 1953
54-20-101
, Utah Code Annotated 1953
54-20-102
, Utah Code Annotated 1953
54-20-103
, Utah Code Annotated 1953
54-20-104
, Utah Code Annotated 1953
54-20-105
, Utah Code Annotated 1953
54-20-106
, Utah Code Annotated 1953
54-20-107
, Utah Code Annotated 1953
Be it enacted by the Legislature of the state of Utah:
Section 1. Section 
54-2-1
 is amended to read:
54-2-1.
Definitions.
As used in this title:
(1) "Avoided costs" means the incremental costs to an electrical corporation of electric
energy or capacity or both that, due to the purchase of electric energy or capacity or both from
small power production or cogeneration facilities, the electrical corporation would not have to
generate itself or purchase from another electrical corporation.
(2) "Clean coal technology" means a technology that may be researched, developed, or
used for reducing emissions or the rate of emissions from a thermal electric generation plant
that uses coal as a fuel source.
[
(2)
] 
(3)
 "Cogeneration facility":
(a) means a facility that produces:
(i) electric energy; and
(ii) steam or forms of useful energy, including heat, that are used for industrial,
commercial, heating, or cooling purposes; and
(b) is a qualifying cogeneration facility under federal law.
[
(3)
] 
(4)
 "Commission" means the Public Service Commission [
of Utah
].
[
(4)
] 
(5)
 "Commissioner" means a member of the commission.
[
(5)
] 
(6)
 (a) "Corporation" includes an association and a joint stock company having
any powers or privileges not possessed by individuals or partnerships.
(b) "Corporation" does not include towns, cities, counties, conservancy districts,
improvement districts, or other governmental units created or organized under any general or
special law of this state.
[
(6)
] 
(7)
 "Distribution electrical cooperative" includes an electrical corporation that:
(a) is a cooperative;
(b) conducts a business that includes the retail distribution of electricity the cooperative
purchases or generates for the cooperative's members; and
(c) is required to allocate or distribute savings in excess of additions to reserves and
surplus on the basis of patronage to the cooperative's:
(i) members; or
(ii) patrons.
[
(7)
] 
(8)
 (a) "Electrical corporation" includes every corporation, cooperative
association, and person, their lessees, trustees, and receivers, owning, controlling, operating, or
managing any electric plant, or in any way furnishing electric power for public service or to its
consumers or members for domestic, commercial, or industrial use, within this state.
(b) "Electrical corporation" does not include:
(i) an independent energy producer;
(ii) where electricity is generated on or distributed by the producer solely for the
producer's own use, or the use of the producer's tenants, or the use of members of an
association of unit owners formed under Title 57, Chapter 8, Condominium Ownership Act,
and not for sale to the public generally;
(iii) an eligible customer who provides electricity for the eligible customer's own use or
the use of the eligible customer's tenant or affiliate; or
(iv) a nonutility energy supplier who sells or provides electricity to:
(A) an eligible customer who has transferred the eligible customer's service to the
nonutility energy supplier in accordance with Section 
54-3-32
; or
(B) the eligible customer's tenant or affiliate.
(c) "Electrical corporation" does not include an entity that sells electric vehicle battery
charging services, unless the entity conducts another activity in the state that subjects the entity
to the jurisdiction and regulation of the commission as an electrical corporation.
[
(8)
] 
(9)
 "Electric plant" includes all real estate, fixtures, and personal property owned,
controlled, operated, or managed in connection with or to facilitate the production, generation,
transmission, delivery, or furnishing of electricity for light, heat, or power, and all conduits,
ducts, or other devices, materials, apparatus, or property for containing, holding, or carrying
conductors used or to be used for the transmission of electricity for light, heat, or power.
[
(9)
] 
(10)
 "Eligible customer" means a person who:
(a) on December 31, 2013:
(i) was a customer of a public utility that, on December 31, 2013, had more than
200,000 retail customers in this state; and
(ii) owned an electric plant that is an electric generation plant that, on December 31,
2013, had a generation name plate capacity of greater than 150 megawatts; and
(b) produces electricity:
(i) from a qualifying power production facility for sale to a public utility in this state;
(ii) primarily for the eligible customer's own use; or
(iii) for the use of the eligible customer's tenant or affiliate.
[
(10)
] 
(11)
 "Eligible customer's tenant or affiliate" means one or more tenants or
affiliates:
(a) of an eligible customer; and
(b) who are primarily engaged in an activity:
(i) related to the eligible customer's core mining or industrial businesses; and
(ii) performed on real property that is:
(A) within a 25-mile radius of the electric plant described in Subsection [
(9)
]
(10)
(a)(ii); and
(B) owned by, controlled by, or under common control with, the eligible customer.
[
(11)
] 
(12)
 "Gas corporation" includes every corporation and person, their lessees,
trustees, and receivers, owning, controlling, operating, or managing any gas plant for public
service within this state or for the selling or furnishing of natural gas to any consumer or
consumers within the state for domestic, commercial, or industrial use, except in the situation
that:
(a) gas is made or produced on, and distributed by the maker or producer through,
private property:
(i) solely for the maker's or producer's own use or the use of the maker's or producer's
tenants; and
(ii) not for sale to others;
(b) gas is compressed on private property solely for the owner's own use or the use of
the owner's employees as a motor vehicle fuel; or
(c) gas is compressed by a retailer of motor vehicle fuel on the retailer's property solely
for sale as a motor vehicle fuel.
[
(12)
] 
(13)
 "Gas plant" includes all real estate, fixtures, and personal property owned,
controlled, operated, or managed in connection with or to facilitate the production, generation,
transmission, delivery, or furnishing of gas, natural or manufactured, for light, heat, or power.
[
(13)
] 
(14)
 "Heat corporation" includes every corporation and person, their lessees,
trustees, and receivers, owning, controlling, operating, or managing any heating plant for public
service within this state.
[
(14)
] 
(15)
 (a) "Heating plant" includes all real estate, fixtures, machinery, appliances,
and personal property controlled, operated, or managed in connection with or to facilitate the
production, generation, transmission, delivery, or furnishing of artificial heat.
(b) "Heating plant" does not include either small power production facilities or
cogeneration facilities.
[
(15)
] 
(16)
 "Independent energy producer" means every electrical corporation, person,
corporation, or government entity, their lessees, trustees, or receivers, that own, operate,
control, or manage an independent power production or cogeneration facility.
[
(16)
] 
(17)
 "Independent power production facility" means a facility that:
(a) produces electric energy solely by the use, as a primary energy source, of biomass,
waste, a renewable resource, a geothermal resource, or any combination of the preceding
sources; or
(b) is a qualifying power production facility.
(18) "Large-scale electric utility" means a public utility that provides retail electric
service to more than 200,000 retail customers in the state.
[
(17)
] 
(19)
 "Nonutility energy supplier" means a person that:
(a) has received market-based rate authority from the Federal Energy Regulatory
Commission in accordance with 16 U.S.C. Sec. 824d, 18 C.F.R. Part 35, Filing of Rate
Schedules and Tariffs, or applicable Federal Energy Regulatory Commission orders; or
(b) owns, leases, operates, or manages an electric plant that is an electric generation
plant that:
(i) has a capacity of greater than 100 megawatts; and
(ii) is hosted on the site of an eligible customer that consumes the output of the electric
plant, in whole or in part, for the eligible customer's own use or the use of the eligible
customer's tenant or affiliate.
[
(18)
] 
(20)
 "Private telecommunications system" includes all facilities for the
transmission of signs, signals, writing, images, sounds, messages, data, or other information of
any nature by wire, radio, lightwaves, or other electromagnetic means, excluding mobile radio
facilities, that are owned, controlled, operated, or managed by a corporation or person,
including their lessees, trustees, receivers, or trustees appointed by any court, for the use of that
corporation or person and not for the shared use with or resale to any other corporation or
person on a regular basis.
[
(19)
] 
(21)
 (a) "Public utility" includes every railroad corporation, gas corporation,
electrical corporation, distribution electrical cooperative, wholesale electrical cooperative,
telephone corporation, telegraph corporation, water corporation, sewerage corporation, heat
corporation, and independent energy producer not described in Subsection [
(19)
] 
(21)
(d),
where the service is performed for, or the commodity delivered to, the public generally, or in
the case of a gas corporation or electrical corporation where the gas or electricity is sold or
furnished to any member or consumers within the state for domestic, commercial, or industrial
use.
(b) (i) If any railroad corporation, gas corporation, electrical corporation, telephone
corporation, telegraph corporation, water corporation, sewerage corporation, heat corporation,
or independent energy producer not described in Subsection [
(19)
] 
(21)
(d), performs a service
for or delivers a commodity to the public, it is considered to be a public utility, subject to the
jurisdiction and regulation of the commission and this title.
(ii) If a gas corporation, independent energy producer not described in Subsection
[
(19)
] 
(21)
(d), or electrical corporation sells or furnishes gas or electricity to any member or
consumers within the state, for domestic, commercial, or industrial use, for which any
compensation or payment is received, it is considered to be a public utility, subject to the
jurisdiction and regulation of the commission and this title.
(c) Any corporation or person not engaged in business exclusively as a public utility as
defined in this section is governed by this title in respect only to the public utility owned,
controlled, operated, or managed by the corporation or person, and not in respect to any other
business or pursuit.
(d) An independent energy producer is exempt from the jurisdiction and regulations of
the commission with respect to an independent power production facility if it meets the
requirements of Subsection [
(19)
] 
(21)
(d)(i), (ii), (iii), or (iv), or any combination of these:
(i) the commodity or service is produced or delivered, or both, by an independent
energy producer solely for a use described in Subsections [
(7)
] 
(8)
(b)(ii) through (iv) or for the
use of state-owned facilities;
(ii) the commodity or service is sold by an independent energy producer solely to an
electrical corporation or other wholesale purchaser;
(iii) (A) the commodity or service produced or delivered by the independent energy
producer is delivered to an entity that controls, is controlled by, or affiliated with the
independent energy producer or to a user located on real property managed or controlled by the
independent energy producer; and
(B) the real property on which the service or commodity is used is contiguous to real
property that is owned or controlled by the independent energy producer or is separated only by
a public road or an easement for a public road; or
(iv) the independent energy producer:
(A) supplies energy for direct consumption by a customer that is:
(I) a United States governmental entity, including an entity of the United States
military, or a county, municipality, city, town, other political subdivision, local district, special
service district, state institution of higher education, school district, charter school, or any
entity within the state system of public education; or
(II) an entity qualifying as a charitable organization under 26 U.S.C. Sec. 501(c)(3)
operated for religious, charitable, or educational purposes that is exempt from federal income
tax and able to demonstrate its tax-exempt status;
(B) supplies energy to the customer through use of a customer generation system, as
defined in Section 
54-15-102
, for use on the real property where the customer generation
system is located;
(C) supplies energy using a customer generation system designed to supply the lesser
of:
(I) no more than 90% of the average annual consumption of electricity by the customer
at that site, based on an annualized billing period; or
(II) the maximum size allowable under net metering provisions, defined in Section
54-15-102
;
(D) notifies the customer before installing the customer generation system of:
(I) all costs the customer is required to pay for the customer generation system,
including any interconnection costs; and
(II) the potential for future changes in amounts paid by the customer for energy
received from the public utility and the possibility of changes to the customer fees or charges to
the customer associated with net metering and generation;
(E) enters into and performs in accordance with an interconnection agreement with a
public utility providing retail electric service where the real property on which the customer
generation system is located, with the rates, terms, and conditions of the retail service and
interconnection agreement subject to approval by the governing authority of the public utility,
as defined in Subsection 
54-15-102
(8); and
(F) installs the relevant customer generation system by December 31, 2021.
(e) Any person or corporation defined as an electrical corporation or public utility
under this section may continue to serve its existing customers subject to any order or future
determination of the commission in reference to the right to serve those customers.
(f) (i) "Public utility" does not include any person that is otherwise considered a public
utility under this Subsection [
(19)
] 
(21)
 solely because of that person's ownership of an interest
in an electric plant, cogeneration facility, or small power production facility in this state if all of
the following conditions are met:
(A) the ownership interest in the electric plant, cogeneration facility, or small power
production facility is leased to:
(I) a public utility, and that lease has been approved by the commission;
(II) a person or government entity that is exempt from commission regulation as a
public utility; or
(III) a combination of Subsections [
(19)
] 
(21)
(f)(i)(A)(I) and (II);
(B) the lessor of the ownership interest identified in Subsection [
(19)
] 
(21)
(f)(i)(A) is:
(I) primarily engaged in a business other than the business of a public utility; or
(II) a person whose total equity or beneficial ownership is held directly or indirectly by
another person engaged in a business other than the business of a public utility; and
(C) the rent reserved under the lease does not include any amount based on or
determined by revenues or income of the lessee.
(ii) Any person that is exempt from classification as a public utility under Subsection
[
(19)
] 
(21)
(f)(i) shall continue to be [
so
] exempt from classification following termination of
the lessee's right to possession or use of the electric plant for so long as the former lessor does
not operate the electric plant or sell electricity from the electric plant. If the former lessor
operates the electric plant or sells electricity, the former lessor shall continue to be so exempt
for a period of 90 days following termination, or for a longer period that is ordered by the
commission. This period may not exceed one year. A change in rates that would otherwise
require commission approval may not be effective during the 90-day or extended period
without commission approval.
(g) "Public utility" does not include any person that provides financing for, but has no
ownership interest in an electric plant, small power production facility, or cogeneration facility. 
In the event of a foreclosure in which an ownership interest in an electric plant, small power
production facility, or cogeneration facility is transferred to a third-party financer of an electric
plant, small power production facility, or cogeneration facility, then that third-party financer is
exempt from classification as a public utility for 90 days following the foreclosure, or for a
longer period that is ordered by the commission. This period may not exceed one year.
(h) (i) The distribution or transportation of natural gas for use as a motor vehicle fuel
does not cause the distributor or transporter to be a "public utility," unless the commission,
after notice and a public hearing, determines by rule that it is in the public interest to regulate
the distributers or transporters, but the retail sale alone of compressed natural gas as a motor
vehicle fuel may not cause the seller to be a "public utility."
(ii) In determining whether it is in the public interest to regulate the distributors or
transporters, the commission shall consider, among other things, the impact of the regulation
on the availability and price of natural gas for use as a motor fuel.
(i) "Public utility" does not include:
(i) an eligible customer who provides electricity for the eligible customer's own use or
the use of the eligible customer's tenant or affiliate; or
(ii) a nonutility energy supplier that sells or provides electricity to:
(A) an eligible customer who has transferred the eligible customer's service to the
nonutility energy supplier in accordance with Section 
54-3-32
; or
(B) the eligible customer's tenant or affiliate.
(j) "Public utility" does not include an entity that sells electric vehicle battery charging
services, unless the entity conducts another activity in the state that subjects the entity to the
jurisdiction and regulation of the commission as a public utility.
[
(20)
] 
(22)
 "Purchasing utility" means any electrical corporation that is required to
purchase electricity from small power production or cogeneration facilities pursuant to the
Public Utility Regulatory Policies Act, 16 U.S.C. Section 824a-3.
[
(21)
] 
(23)
 "Qualifying power producer" means a corporation, cooperative association,
or person, or the lessee, trustee, and receiver of the corporation, cooperative association, or
person, who owns, controls, operates, or manages any qualifying power production facility or
cogeneration facility.
[
(22)
] 
(24)
 "Qualifying power production facility" means a facility that:
(a) produces electrical energy solely by the use, as a primary energy source, of biomass,
waste, a renewable resource, a geothermal resource, or any combination of the preceding
sources;
(b) has a power production capacity that, together with any other facilities located at
the same site, is no greater than 80 megawatts; and
(c) is a qualifying small power production facility under federal law.
[
(23)
] 
(25)
 "Railroad" includes every commercial, interurban, and other railway, other
than a street railway, and each branch or extension of a railway, by any power operated,
together with all tracks, bridges, trestles, rights-of-way, subways, tunnels, stations, depots,
union depots, yards, grounds, terminals, terminal facilities, structures, and equipment, and all
other real estate, fixtures, and personal property of every kind used in connection with a
railway owned, controlled, operated, or managed for public service in the transportation of
persons or property.
[
(24)
] 
(26)
 "Railroad corporation" includes every corporation and person, their lessees,
trustees, and receivers, owning, controlling, operating, or managing any railroad for public
service within this state.
[
(25)
] 
(27)
 (a) "Sewerage corporation" includes every corporation and person, their
lessees, trustees, and receivers, owning, controlling, operating, or managing any sewerage
system for public service within this state.
(b) "Sewerage corporation" does not include private sewerage companies engaged in
disposing of sewage only for their stockholders, or towns, cities, counties, conservancy
districts, improvement districts, or other governmental units created or organized under any
general or special law of this state.
[
(26)
] 
(28)
 "Telegraph corporation" includes every corporation and person, their
lessees, trustees, and receivers, owning, controlling, operating, or managing any telegraph line
for public service within this state.
[
(27)
] 
(29)
 "Telegraph line" includes all conduits, ducts, poles, wires, cables,
instruments, and appliances, and all other real estate, fixtures, and personal property owned,
controlled, operated, or managed in connection with or to facilitate communication by
telegraph, whether that communication be had with or without the use of transmission wires.
[
(28)
] 
(30)
 (a) "Telephone corporation" means any corporation or person, and their
lessees, trustee, receivers, or trustees appointed by any court, who owns, controls, operates,
manages, or resells a public telecommunications service as defined in Section 
54-8b-2
.
(b) "Telephone corporation" does not mean a corporation, partnership, or firm
providing:
(i) intrastate telephone service offered by a provider of cellular, personal
communication systems (PCS), or other commercial mobile radio service as defined in 47
U.S.C. Sec. 332 that has been issued a covering license by the Federal Communications
Commission;
(ii) Internet service; or
(iii) resold intrastate toll service.
[
(29)
] 
(31)
 "Telephone line" includes all conduits, ducts, poles, wires, cables,
instruments, and appliances, and all other real estate, fixtures, and personal property owned,
controlled, operated, or managed in connection with or to facilitate communication by
telephone whether that communication is had with or without the use of transmission wires.
[
(30)
] 
(32)
 "Transportation of persons" includes every service in connection with or
incidental to the safety, comfort, or convenience of the person transported, and the receipt,
carriage, and delivery of that person and that person's baggage.
[
(31)
] 
(33)
 "Transportation of property" includes every service in connection with or
incidental to the transportation of property, including in particular its receipt, delivery,
elevation, transfer, switching, carriage, ventilation, refrigeration, icing, dunnage, storage, and
hauling, and the transmission of credit by express companies.
[
(32)
] 
(34)
 "Water corporation" includes every corporation and person, their lessees,
trustees, and receivers, owning, controlling, operating, or managing any water system for
public service within this state. It does not include private irrigation companies engaged in
distributing water only to their stockholders, or towns, cities, counties, water conservancy
districts, improvement districts, or other governmental units created or organized under any
general or special law of this state.
[
(33)
] 
(35)
 (a) "Water system" includes all reservoirs, tunnels, shafts, dams, dikes,
headgates, pipes, flumes, canals, structures, and appliances, and all other real estate, fixtures,
and personal property owned, controlled, operated, or managed in connection with or to
facilitate the diversion, development, storage, supply, distribution, sale, furnishing, carriage,
appointment, apportionment, or measurement of water for power, fire protection, irrigation,
reclamation, or manufacturing, or for municipal, domestic, or other beneficial use.
(b) "Water system" does not include private irrigation companies engaged in
distributing water only to their stockholders.
[
(34)
] 
(36)
 "Wholesale electrical cooperative" includes every electrical corporation that
is:
(a) in the business of the wholesale distribution of electricity it has purchased or
generated to its members and the public; and
(b) required to distribute or allocate savings in excess of additions to reserves and
surplus to members or patrons on the basis of patronage.
Section 2. Section 
54-3-33
 is enacted to read:
 54-3-33.
Eligible customer energy supply contract.
(1) The commission may approve a contract between a large-scale electric utility and a
customer of a large-scale electric utility that is eligible to transfer electric service to a
non-utility energy supplier under Section 
54-3-32
.
(2) The commission shall exempt a customer that enters into a contract described in
Subsection (1) from paying the costs recovered under Subsection 
54-7-12.8
(3), except the costs
of the Utah solar incentive program included in Subsection 
54-7-12.8
(3)(b).
(3) If an eligible customer that enters into a contract described in Subsection (1) has
provided notice to the commission under Subsection 
54-3-32
(3), the notice is not considered
withdrawn under Subsection 
54-3-32
(4)(c) by the customer entering into the contract.
(4) Notwithstanding Subsection 
54-3-32
(4)(c), if the commission approves a contract
under this section for an eligible customer that states a contract termination date that is after
December 31, 2020, the notice described in Subsection 
54-3-32
(3)(a) is not considered to be
withdrawn unless a transfer of service under Section 
54-3-32
 does not occur before the later of:
(a) the day three years after the termination date stated in the contract; or
(b) 18 months after the intended date of transfer of service described in Subsection
54-3-32
(3)(a)(ii).
Section 3. Section 
54-7-12.8
 is amended to read:
54-7-12.8.
Electric energy efficiency, sustainable transportation and energy, and
conservation tariff.
(1) As used in this section[
, "demand
]
:
(a) "Demand
 side management" means [
activities or programs that promote
] 
an activity
or program that promotes
 electric energy efficiency or conservation or more efficient
management of electric energy loads.
(b) "Pilot program period" means a period of five years, beginning on January 1, 2017,
during which the sustainable transportation and energy plan is effective.
(c) "Sustainable transportation and energy plan" means the same as that term is defined
in Section 
54-20-102
.
(d) "Utah solar incentive program" means the eligible utility rooftop solar pilot
program established by commission order in 2012.
(2) 
(a)
 As provided in this section, the commission may approve a tariff under which
an electrical corporation includes a line item charge on [
its
] 
the electrical corporation's
customers' bills to recover costs incurred by the electrical corporation for demand side
management.
(b) The commission shall authorize a large-scale electric utility that is allowed to
charge a customer for demand side management under Subsection (2)(a) to:
(i) if requested by the large-scale electric utility, capitalize the annual costs incurred for
demand side management provided in Subsection (2)(a);
(ii) amortize the annual cost for demand side management over a period of 10 years;
(iii) apply a carrying charge to the unamortized balance that is equal to the large-scale
electric utility's pretax weighted average cost of capital approved by the commission in the
large-scale electric utility's most recent general rate proceeding; and
(iv) recover the amortization cost described in Subsection (2)(b)(ii) and the carrying
charge described in Subsection (2)(b)(iii) in customer rates.
(3) The commission shall, before January 1, 2017, authorize a large-scale electric
utility to implement a combined line item charge on the large-scale electric utility's customers'
bills to recover the cost to the large-scale electric utility of:
(a) demand side management, including the cost of amortizing a deferred balance;
(b) the sustainable transportation and energy plan; and
(c) the additional expense described in Subsection (5)(a)(i).
(4) On December 31, 2016, the commission shall end the Utah solar incentive program
and surcharge tariff and the large-scale electric utility shall stop accepting new applications for
solar incentive program incentives.
(5) (a) The commission may authorize a large-scale electric utility that capitalizes
demand side management costs under Subsection (2)(b) to:
(i) recognize the difference between the annual revenues the large-scale electric utility
collects for demand side management and the annual amount of the large-scale electric utility's
demand side management cost amortization expense as an additional expense;
(ii) establish and fund, via the additional expense described in Subsection (5)(a)(i), a
regulatory liability; and
(iii) use the regulatory liability described in Subsection (5)(a)(ii) to depreciate thermal
generation plant.
(b) (i) The commission may authorize the large-scale electric utility to use the
regulatory liability described in Subsection (5)(a)(ii) to depreciate thermal generation plant for
which the commission determines depreciation is in the public interest for compliance with an
environmental regulation or another purpose.
(ii) The commission may not consider the existence of the regulatory liability described
in Subsection (5)(a)(ii) in a determination to accelerate depreciation under Subsection (5)(b)(i).
(c) The commission shall allow the large-scale electric utility to apply a carrying
charge to the regulatory liability described in Subsection (5)(a)(ii) in an amount equal to the
large-scale electric utility's pretax average weighted cost of capital approved by the
commission in the large-scale electric utility's most recent general rate proceeding.
(d) The commission may allow a large-scale electric utility to use the regulatory
liability carrying charge described in Subsection (5)(c) to offset the carrying charge described
in Subsection (2)(b)(iii).
(e) The large-scale electric utility shall apply the carrying charge described in
Subsection (5)(c) to funds that a large-scale electric utility is authorized to use to depreciate
thermal generation plant under Subsection (5)(a) until the reduction in the large-scale electric
utility's rate base associated with the thermal generation plant depreciation for which the funds
are used is reflected in the large-scale electric utility's customers' rates.
(f) If the commission determines that funds established in the regulatory liability under
Subsection (5)(a) are no longer needed for the purpose of depreciating thermal generation
plant, the large-scale electric utility shall use the balance of the funds in the regulatory liability
to offset the capitalized demand side management costs described in Subsection (2)(b)(i).
(6) (a) During the pilot program period, of the funds a large-scale electric utility
collects via the line item charge described in Subsection (3), the commission shall authorize the
large-scale electric utility to allocate on an annual basis:
(i) $10,000,000 to the sustainable transportation and energy plan; and
(ii) the funds not allocated to the sustainable transportation and energy plan to demand
side management.
(b) The commission shall authorize a large-scale electric utility to spend up to:
(i) $2,000,000 annually for the electric vehicle incentive program described in Section
54-20-103
; and
(ii) an annual average of:
(A) $1,000,000 for the clean coal technology program described in Section 
54-20-104
;
and
(B) $3,400,000 for the innovative utility programs described in Section 
54-20-105
.
(c) The commission shall authorize a large-scale electric utility to recoup the
large-scale electric utility's unrecovered costs paid through the Utah solar incentive program
from the funds allocated under Subsection (6)(a)(i).
(d) The commission may authorize a large-scale electric utility to allocate funds the
large-scale electric utility collects via the line item charge described in Subsection (3) not spent
under Subsection (6) to a conservation, efficiency, or new technology program if the
conservation, efficiency, or new technology program is cost-effective and in the public interest.
(7) A large-scale electric utility shall establish a balancing account that includes:
(a) funds allocated under Subsection (6)(a)(i);
(b) the program expenditures described in Subsection (6)(b);
(c) the unrecovered Utah solar incentive program costs described in Subsection (6)(c);
and
(d) a carrying charge in an amount determined by the commission.
(8) A customer that is paying a contract rate under an agreement with a large-scale
electric utility as of January 1, 2016, is exempt from the costs recovered under Subsection (3),
except for costs created by or arising from the Utah solar incentive program included in
Subsection 
54-7-12.8
(3)(b).
(9) (a) In any proceeding commenced under Section 
54-3-32
, the commission may not
consider or assess to an eligible customer an expenditure, cost, amortization, charge, or liability
of any kind that is created by or arises in whole or in part from:
(i) any program created under Title 54, Chapter 20, Sustainable Transportation and
Energy Plan Act; or
(ii) this section, except for costs created by or arising from the Utah solar incentive
program included in Subsection 
54-7-12.8
(3)(b).
(b) Except as provided in Subsection (9)(a) and in Section 
54-3-33
, this section and
Title 54, Chapter 20, Sustainable Transportation and Energy Plan Act, do not:
(i) amend or repeal any provision of Section 
54-3-32
; or
(ii) affect any right, defense, or credit available to an eligible customer under Section
54-3-32
.
[
(3)
] 
(10)
 Each electrical corporation proposing a tariff under this section shall, before
submitting the tariff to the commission for approval, seek [
and receive
] input from:
(a) the Division of Public Utilities;
(b) the Office of Consumer Services [
created in Section 
54-10a-201
]; and
[
(c) other interested parties.
]
(c) a person that files a request for notice with the commission.
[
(4)
] 
(11)
 Before approving a tariff under this section, the commission shall hold a
hearing if:
(a) requested in writing by the electrical corporation, a customer of the electrical
corporation, or any other interested party within 15 days after the tariff filing; or
(b) the commission determines that a hearing is appropriate.
[
(5)
] 
(12)
 The commission may approve a 
demand side management
 tariff under this
section either with or without a provision allowing an end-use customer to receive a credit
against the charges imposed under the tariff for electric energy efficiency measures that:
(a) the customer implements or has implemented at the customer's expense; and
(b) qualify for the credit under criteria established by the [
Utah Public Service
Commission
] 
commission
.
[
(6)
] 
(13)
 In approving a tariff under this section, the commission may impose
whatever conditions or limits it considers appropriate, including a maximum annual cost.
[
(7)
] 
(14)
 Unless otherwise ordered by the commission, each tariff under this section
approved by the commission shall take effect no sooner than 30 days after the electrical
corporation files the tariff with the commission.
Section 4. Section 
54-7-13.5
 is amended to read:
54-7-13.5.
Energy balancing accounts.
(1) As used in this section:
(a) "Base rates" [
is as
] 
means the same as that term is
 defined in Subsection
54-7-12
(1).
(b) "Energy balancing account" means an electrical corporation account for some or all
components of the electrical corporation's incurred actual power costs, including:
(i) (A) fuel;
(B) purchased power; and
(C) wheeling expenses; and
(ii) the sum of the power costs described in Subsection (1)(b)(i) less wholesale
revenues.
(c) "Gas balancing account" means a gas corporation account to recover on a
dollar-for-dollar basis, purchased gas costs, and gas cost-related expenses.
(2) (a) The commission may authorize an electrical corporation to establish an energy
balancing account.
(b) An energy balancing account shall become effective upon a commission finding
that the energy balancing account is:
(i) in the public interest;
(ii) for prudently-incurred costs; and
(iii) implemented at the conclusion of a general rate case.
(c) An electrical corporation:
(i) may, with approval from the commission, recover costs under this section through:
(A) base rates;
(B) contract rates;
(C) surcredits; or
(D) surcharges; and
(ii) shall file a reconciliation of the energy balancing account with the commission at
least annually with actual costs and revenues incurred by the electrical corporation.
(d) Beginning June 1, 2016, for an electrical corporation with an energy balancing
account established before January 1, 2016, the commission shall allow an electrical
corporation to recover 100% of the electrical corporation's prudently incurred costs as
determined and approved by the commission under this section.
[
(d)
] 
(e)
 An energy balancing account may not alter:
(i) the standard for cost recovery; or
(ii) the electrical corporation's burden of proof.
[
(e)
] 
(f)
 The collection method described in Subsection (2)(c)(i) shall:
(i) apply to the appropriate billing components in base rates; and
(ii) be incorporated into base rates in an appropriate commission proceeding.
[
(f)
] 
(g)
 The collection of costs related to an energy balancing account from customers
paying contract rates shall be governed by the terms of the contract.
[
(g)
] 
(h)
 Revenues collected in excess of prudently incurred actual costs shall:
(i) be refunded as a bill surcredit to an electrical corporation's customers over a period
specified by the commission; and
(ii) include a carrying charge.
[
(h)
] 
(i)
 Prudently incurred actual costs in excess of revenues collected shall:
(i) be recovered as a bill surcharge over a period to be specified by the commission;
and
(ii) include a carrying charge.
[
(i)
] 
(j)
 The carrying charge applied to the balance in an energy balancing account shall
be:
(i) determined by the commission; and
(ii) symmetrical for over or under collections.
(3) (a) The commission may:
(i) establish a gas balancing account for a gas corporation; and
(ii) set forth procedures for a gas corporation's gas balancing account in the gas
corporation's commission-approved tariff.
(b) A gas balancing account may not alter:
(i) the standard of cost recovery; or
(ii) the gas corporation's burden of proof.
(4) (a) All allowed costs and revenues associated with an energy balancing account or
gas balancing account shall remain in the respective balancing account until charged or
refunded to customers.
(b) The balance of an energy balancing account or gas balancing account may not be:
(i) transferred by the electrical corporation or gas corporation; or
(ii) used by the commission to impute earnings or losses to the electrical corporation or
gas corporation.
(c) An energy balancing account or gas balancing account that is formed and
maintained in accordance with this section does not constitute impermissible retroactive
ratemaking or single-issue ratemaking.
(5) This section does not create a presumption for or against approval of an energy
balancing account.
(6) The commission shall report to the Public Utilities and Technology Interim
Committee before December 1 in 2017 and 2018 regarding whether allowing an electrical
corporation to continue to recover costs under Subsection (2)(d) is reasonable and in the public
interest.
Section 5. Section 
54-17-801
 is amended to read:
54-17-801.
Definitions.
As used in this part:
(1) "Contract customer" means a person who executes or will execute a renewable
energy contract with a qualified utility.
(2) "Qualified utility" means an electric corporation that serves more than 200,000
retail customers in the state.
(3) "Renewable energy contract" means a contract under this part for the delivery of
electricity from one or more renewable energy facilities to a contract customer requiring the use
of a qualified utility's transmission or distribution system to deliver the electricity from a
renewable energy facility to the contract customer.
(4) "Renewable energy facility":
(a) except as provided in Subsection (4)(b), means a renewable energy source defined
in Section 
54-17-601
 that is located in the state; and
(b) does not include an electric generating facility whose costs have been included in a
qualified utility's rates as a facility providing electric service to the qualified utility's system.
(5) "Renewable energy tariff" means a tariff offered by a qualified utility that allows
the qualified utility to procure renewable generation on behalf of and to serve its customers.
Section 6. Section 
54-17-806
 is enacted to read:
 54-17-806.
Qualified utility renewable energy tariff.
(1) The commission may authorize a qualified utility to implement a renewable energy
tariff in accordance with this section if the commission determines the tariff that the qualified
utility proposes is reasonable and in the public interest.
(2) If a tariff is authorized under Subsection (1), a qualified utility customer with an
aggregated electrical load of at least five megawatts and who agrees to service that is subject to
the renewable energy tariff shall pay:
(a) the customer's normal tariff rate;
(b) an incremental charge in an amount equal to the difference between the cost to the
qualified utility to supply renewable generation to the renewable energy tariff customer and the
qualified utility's avoided costs as defined in Subsection 
54-2-1
(1), or a different methodology
recommended by the qualified utility; and
(c) an administrative fee in an amount approved by the commission.
(3) The commission shall allow a qualified utility to recover the qualified utility's
prudently incurred cost of renewable generation procured pursuant to the tariff established in
this section that is not otherwise recovered from the proceeds of the tariff paid by customers
agreeing to service that is subject to the renewable energy tariff.
Section 7. Section 
54-20-101
 is enacted to read:
CHAPTER 20. SUSTAINABLE TRANSPORTATION AND ENERGY PLAN ACT
 54-20-101.
Title.
This chapter is known as the "Sustainable Transportation and Energy Plan Act."
Section 8. Section 
54-20-102
 is enacted to read:
 54-20-102.
Definitions.
As used in this chapter:
(1) "Demand side management" means the same as that term is defined in Section
54-7-12.8
.
(2) "Pilot program period" means a period of 5 years, beginning on January 1, 2017,
during which the sustainable transportation and energy plan is effective.
(3) "Sustainable transportation and energy plan" means the programs approved by the
commission and undertaken by a large-scale electric utility during the pilot program period,
including:
(a) the electric vehicle incentive program described in Section 
54-20-103
;
(b) the clean coal technology program described in Section 
54-20-104
; and
(c) the innovative technology programs described in Section 
54-20-105
.
Section 9. Section 
54-20-103
 is enacted to read:
 54-20-103.
Electric vehicle incentive program.
(1) The commission shall, before July 1, 2017, authorize a large-scale electric utility to
establish a program that promotes customer choice in electric vehicle charging equipment and
service that includes:
(a) an incentive to a large-scale electric utility customer to install or provide electric
vehicle infrastructure;
(b) time of use pricing for electric vehicle charging;
(c) any measure that the commission determines is in the public interest that
incentivizes the competitive deployment of electric vehicle charging infrastructure.
(2) The commission may review the expenditures made by a large-scale electric utility
for the program described in Subsection (1) in order to determine if the large-scale electric
utility made the expenditures prudently in accordance with the purposes of the program.
(3) A large-scale electric utility proposing a program for approval by the commission
under this section shall, before submitting the program to the commission for approval, seek
input from:
(a) the Division of Public Utilities;
(b) the Office of Consumer Services;
(c) the Division of Air Quality; and
(d) any person that files a request for notice with the commission.
Section 10. Section 
54-20-104
 is enacted to read:
 54-20-104.
Clean coal technology program.
(1) Subject to Subsection (2), the commission shall authorize, before July 1, 2017, and,
subject to funding, approve a program that authorizes a large-scale electric utility to
investigate, analyze, and research clean coal technology.
(2) The commission may review the expenditures made by a large-scale electric utility
for a program described in Subsection (1) in order to determine if the large-scale electric utility
made the expenditures prudently in accordance with the purposes of the program.
Section 11. Section 
54-20-105
 is enacted to read:
 54-20-105.
Innovative utility programs.
(1) The commission may authorize, subject to funding available under Subsection
54-7-12.8
(6)(b)(ii)(B), a large-scale electric utility to implement programs that the commission
determines are in the interest of large-scale electric utility customers to provide for the
investigation, analysis, and implementation of:
(a) an economic development incentive rate;
(b) a solar generation incentive;
(c) a battery storage or electric grid related project;
(d) a commercial line extension pilot program;
(e) a program to curtail emissions from thermal generation plant in the Salt Lake
non-attainment area during a non-attainment event as defined by the Division of Air Quality;
(f) an additional electric vehicle incentive program incremental to the program
described in Section 
54-20-103
;
(g) an additional clean coal program incremental to the program described in Section
54-20-104
; and
(h) any other technology program.
(2) The commission may review the expenditures made by a large-scale electric utility
for a program described in Subsection (1) in order to determine if the large-scale electric utility
made the expenditures prudently in accordance with the purposes of the program.
(3) The commission may authorize and establish funding for a conservation, efficiency,
or new technology program in addition to the programs described in this chapter if the
conservation, efficiency, or new technology program is cost-effective and in the public interest.
Section 12. Section 
54-20-106
 is enacted to read:
 54-20-106.
Extension of pilot program.
Before the first day of the legislative session in the final year of the pilot program
period, the commission shall submit a report and recommendation to the Legislature regarding
whether, in the discretion of the commission, the Legislature should, for the sustainable
transportation and energy plan:
(1) extend the plan or a portion of the plan as a ratepayer funded program;
(2) implement the plan or a portion of the plan as a state funded program; or
(3) discontinue the plan or a portion of the plan.
Section 13. Section 
54-20-107
 is enacted to read:
 54-20-107.
Other programs.
The commission may authorize a large-scale electric utility to establish a program in
addition to the programs described in this chapter if the commission determines that the
program is cost-effective and in the public interest.
Section 14. Section 
63I-1-254
 is amended to read:
63I-1-254.
Repeal dates -- Title 54.
(1)
 The language of Subsection 
54-4-13.4
(1)(a)(ii) after "do not exceed $5,000,000 in
any calendar year" is repealed July 1, 2018.
(2) Subsection 
54-7-13.5
(2)(d) is repealed on December 31, 2019.