Rep. Norm Thurston — Voting Record

Utah House District 62 · complete roll-call record from le.utah.gov
← All votes

Bill

Water Quality Amendments
Number
S.B. 110 Third Substitute (2016GS)
Sponsor
Sen. Hinkins, D.
Final action
Governor Signed 3/28/2016
Outcome
Became law — signed by Gov. Gary R. Herbert

Summary

This bill modifies provisions of the Water Quality Act.

What it does

  • This bill:
  • defines terms;
  • establishes an independent peer review process for challenges made to proposals from the Division of Water Quality; and
  • establishes the requirements, including selecting the panel of independent experts, for an independent peer review.

Every vote on this bill

2/23/2016Senate/ substituted from # 1 to # 3
Senate 2nd Reading Calendar
Voice votenot eligible / no record
2/23/2016Senate/ passed 2nd reading
Senate 3rd Reading Calendar
21 2 6not eligible / no record
2/24/2016Senate/ passed 3rd reading
Clerk of the House
18 2 9not eligible / no record
3/8/2016House/ passed 3rd reading
House Speaker
63 10 2YEA

Bill text

enrolled version · official source
WATER QUALITY AMENDMENTS
GENERAL SESSION
STATE OF UTAH
Chief Sponsor: David P. Hinkins
House Sponsor: 
Mike K. McKell
LONG TITLE
General Description:
This bill modifies provisions of the Water Quality Act.
Highlighted Provisions:
This bill:
▸ defines terms;
▸ establishes an independent peer review process for challenges made to proposals
from the Division of Water Quality; and
▸ establishes the requirements, including selecting the panel of independent experts,
for an independent peer review.
Money Appropriated in this Bill:
None
Other Special Clauses:
None
Utah Code Sections Affected:
ENACTS:
19-5-105.3
, Utah Code Annotated 1953
Be it enacted by the Legislature of the state of Utah:
Section 1. Section 
19-5-105.3
 is enacted to read:
 19-5-105.3.
Independent peer review of a proposal.
(1) As used in this section:
(a) "Challenging party" means a person who has or is seeking a permit in accordance
with this chapter and chooses to use the independent peer review process described in this
section to challenge a proposal.
(b) "Independent peer review" is a review conducted:
(i) in accordance with this section;
(ii) by experts having technical expertise in the proposal being reviewed; and
(iii) by individuals who are not:
(A) currently conducting research funded by the division or the challenging party;
(B) employed by an entity that is regulated under this chapter;
(C) a spouse or family member of someone who is employed by the division or the
challenging party; or
(D) an active, participatory member of a non-profit organization that advocates
positions with the division or the Legislature.
(c) "Proposal" means any science-based initiative proposed by the division on or after
January 1, 2016, that would financially impact a challenging party and that would:
(i) change water quality standards;
(ii) develop or modify total maximum daily load requirements;
(iii) modify wasteloads or other regulatory requirements for permits; or
(iv) change rules or other regulatory guidance.
(d) "Study" means a written analysis conducted by or otherwise relied upon by the
division in support of a proposal.
(e) "Technology based nutrient effluent limits" are maximum nutrient limitations based
on the availability of technology to achieve the limitations, rather than on a water quality
standard or a total maximum daily load standard.
(2) The director shall initiate an independent peer review when the following
conditions are met:
(a) a challenging party challenges in writing a study or the technical or scientific data
upon which a proposal is based and requests an independent peer review;
(b) if the independent peer review is related to examining a technology based nutrient
effluent limit, the challenging party provides written notice to the division requesting an
independent peer review before the technology based nutrient effluent limit is adopted into a
permit issued by the division;
(c) if the independent peer review is not related to examining a technology based
nutrient effluent limit, the challenging party provides written notice to the division requesting
an independent peer review related to a proposal before the proposal has been adopted by the
division or the board;
(d) the challenging party agrees to provide the funding to pay for the independent peer
review; and
(e) the challenging party would be substantially impacted by the adoption of the
proposal.
(3) The director shall ensure that the independent peer review is completed within one
year from the date the peer review panel described in Subsection (5) is selected.
(4) (a) If there is more than one challenging party challenging a study or the technical
or scientific data upon which a proposal is based, the challenges will be consolidated into one
independent peer review.
(b) If challenges are consolidated into one independent peer review, the challenging
parties will be responsible for allocating the costs of the independent peer review among the
challenging parties.
(5) (a) When an independent peer review is conducted, there shall be appointed to a
peer review panel a minimum of three independent experts who are mutually agreeable to both
the division and the challenging party.
(b) Any additional independent experts appointed to the panel shall be mutually
agreeable to both the division and the challenging party.
(c) If an independent peer review panel has not been appointed within 60 days of the
day on which the director receives a written request for an independent peer review, a
three-person panel shall be selected as follows:
(i) one independent expert selected by the division;
(ii) one independent expert selected by the challenging party or, if more than one
challenge has been consolidated as described in Subsection (4), one independent expert
selected and mutually agreed to by the challenging parties; and
(iii) one independent expert mutually agreeable to the independent experts described in
Subsections (5)(c)(i) and (ii).
(6) (a) An independent peer review panel shall conduct its review in general
accordance with the guidance contained in the United States Environmental Protection
Agency's Peer Review Handbook.
(b) As part of an independent peer review, the independent peer review panel shall
allow for written public comment on the proposal being reviewed prior to issuing a written
report.
(7) An independent peer review panel shall prepare a final written report that:
(a) includes the findings of each member of the panel;
(b) is supported by the majority of the panel;
(c) includes an analysis of the panel's confidence, certainty, and major data gaps, if any,
related to the scientific basis behind the proposal; and
(d) includes one of the following findings:
(i) the proposal is scientifically defensible;
(ii) the proposal is not scientifically defensible; or
(iii) the proposal is scientifically defensible with conditions developed by the panel.
(8) In addition to the requirements described in Subsection (7), if an independent peer
review panel is examining a technology based nutrient effluent limit for a specified
downstream water body or a series of hydrologically connected water bodies, the panel's
written report shall find one of the following:
(a) the technology based nutrient effluent limit is scientifically necessary to protect the
designated beneficial uses of the specified downstream water body or the series of
hydrologically connected water bodies; or
(b) the technology based nutrient effluent limit is not scientifically necessary to protect
the designated beneficial uses of the specified downstream water body or the series of
hydrologically connected water bodies.
(9) The findings and any conditions of an independent peer review panel shall be
incorporated into a proposal as needed to ensure the scientific accuracy of the proposal.
(10) A proposal reviewed by an independent peer review panel that is found
scientifically defensible or scientifically defensible with conditions may be forwarded to the
board or to the director for further consideration and action as applicable.
(11) If technology based nutrient effluent limits in a proposal are found by an
independent peer review to not be scientifically necessary to protect a specified downstream
water body or series of hydrologically connected water bodies, the challenging party shall be
granted a variance by the division exempting compliance with the technology based effluent
limitation.