Rep. Norm Thurston — Voting Record

Utah House District 62 · complete roll-call record from le.utah.gov
← All votes

Bill

Nonuse Application Amendments
Number
H.B. 222 (2016GS)
Sponsor
Rep. Hawkes, T.
Final action
Governor Signed 3/18/2016
Outcome
Became law — signed by Gov. Gary R. Herbert

Summary

This bill deals with nonuse applications.

What it does

  • This bill:
  • states that approval of one or more nonuse applications, or successive overlapping nonuse applications, does not protect a water right that is already subject to forfeiture, nor does the approval of one or more nonuse applications constitute beneficial use of water; and
  • makes technical changes.

Every vote on this bill

2/12/2016House/ passed 3rd reading
Senate Secretary
73 1 1YEA
2/23/2016Senate/ passed 3rd reading
Senate President
26 0 3not eligible / no record

Bill text

enrolled version · official source
NONUSE APPLICATION AMENDMENTS
GENERAL SESSION
STATE OF UTAH
Chief Sponsor: Timothy D. Hawkes
Senate Sponsor: 
Margaret Dayton
LONG TITLE
General Description:
This bill deals with nonuse applications.
Highlighted Provisions:
This bill:
▸ states that approval of one or more nonuse applications, or successive overlapping
nonuse applications, does not protect a water right that is already subject to
forfeiture, nor does the approval of one or more nonuse applications constitute
beneficial use of water; and
▸ makes technical changes.
Money Appropriated in this Bill:
None
Other Special Clauses:
None
Utah Code Sections Affected:
AMENDS:
73-1-4
, as last amended by Laws of Utah 2015, Chapters 249 and 282
Be it enacted by the Legislature of the state of Utah:
Section 1. Section 
73-1-4
 is amended to read:
73-1-4.
Reversion to the public by abandonment or forfeiture for nonuse within
seven years -- Nonuse application.
(1) As used in this section:
(a) "Public entity" means:
(i) the United States;
(ii) an agency of the United States;
(iii) the state;
(iv) a state agency;
(v) a political subdivision of the state; or
(vi) an agency of a political subdivision of the state.
(b) "Public water supplier" means an entity that:
(i) supplies water, directly or indirectly, to the public for municipal, domestic, or
industrial use; and
(ii) is:
(A) a public entity;
(B) a water corporation, as defined in Section 
54-2-1
, that is regulated by the Public
Service Commission;
(C) a community water system:
(I) that:
(Aa) supplies water to at least 100 service connections used by year-round residents; or
(Bb) regularly serves at least 200 year-round residents; and
(II) whose voting members:
(Aa) own a share in the community water system;
(Bb) receive water from the community water system in proportion to the member's
share in the community water system; and
(Cc) pay the rate set by the community water system based on the water the member
receives; or
(D) a water users association:
(I) in which one or more public entities own at least 70% of the outstanding shares; and
(II) that is a local sponsor of a water project constructed by the United States Bureau of
Reclamation.
(c) "Shareholder" means the same as that term is defined in Section 
73-3-3.5
.
(d) "Water company" means the same as that term is defined in Section 
73-3-3.5
.
(e) "Water supply entity" means an entity that supplies water as a utility service or for
irrigation purposes and is also:
(i) a municipality, water conservancy district, metropolitan water district, irrigation
district, or other public agency;
(ii) a water company regulated by the Public Service Commission; or
(iii) any other owner of a community water system.
(2) (a) Except as provided in Subsection (2)(b) or (e), when an appropriator or the
appropriator's successor in interest abandons or ceases to use all or a portion of a water right for
a period of seven years, the water right or the unused portion of that water right is subject to
forfeiture in accordance with Subsection (2)(c).
(b) (i) An appropriator or the appropriator's successor in interest may file an
application for nonuse with the state engineer.
(ii) If a person described in Subsection (2)(b)(i) files and receives approval on a nonuse
application, nonuse of the water right subject to the application is not counted toward a
seven-year period described in Subsection (2)(a) during the period of time beginning on the day
on which the person files the application and ending on the day on which the application
expires without being renewed.
(iii) If a person described in Subsection (2)(b)(i) files and receives approval on
successive, overlapping nonuse applications, nonuse of the water right subject to the
applications is not counted toward a seven-year period described in Subsection (2)(a) during
the period of time beginning on the day on which the person files the first application and
ending on the day on which the last application expires without being renewed.
(iv) Approval of [
a
] 
one or more
 nonuse [
application
] 
applications, or successive
overlapping nonuse applications,
 does not protect a water right that is already subject to
forfeiture under Subsection (2)(a) for full or partial nonuse of the water right
, nor does the
approval of one or more nonuse applications constitute beneficial use of the water for purposes
of calculating the 15-year period in Subsection (2)(c)(i)
.
(v) A nonuse application may be filed on all or a portion of the water right, including
water rights held by a water company.
(vi) After giving written notice to the water company, a shareholder may file a nonuse
application with the state engineer on the water represented by the stock.
(c) (i) Except as provided in Subsection (2)(c)(ii), a water right or a portion of the water
right may not be forfeited unless a judicial action to declare the right forfeited is commenced
within 15 years from the end of the latest period of nonuse of at least seven years.
(ii) (A) The state engineer, in a proposed determination of rights prepared in
accordance with Section 
73-4-11
, may not assert that a water right was forfeited unless a period
of nonuse of seven years ends or occurs during the 15 years immediately preceding the day on
which the state engineer files the proposed determination of rights with the court.
(B) After the day on which a proposed determination of rights is filed with the court a
person may not assert that a water right subject to that determination was forfeited during the
15-year period described in Subsection (2)(c)(ii)(A), unless the state engineer asserts forfeiture
in the proposed determination, or a person makes, in accordance with Section 
73-4-11
, an
objection to the proposed determination that asserts forfeiture.
(iii) A water right, found to be valid in a decree entered in an action for general
determination of rights under Chapter 4, Determination of Water Rights, is subject to a claim
of forfeiture based on a seven-year period of nonuse that begins after the day on which the state
engineer filed the related proposed determination of rights with the court, unless the decree
provides otherwise.
(iv) If in a judicial action a court declares a water right forfeited, on the date on which
the water right is forfeited:
(A) the right to use the water reverts to the public; and
(B) the water made available by the forfeiture:
(I) first, satisfies other water rights in the hydrologic system in order of priority date;
and
(II) second, may be appropriated as provided in this title.
(d) Except as provided in Subsection (2)(e), this section applies whether the unused or
abandoned water or a portion of the water is:
(i) permitted to run to waste; or
(ii) used by others without right with the knowledge of the water right holder.
(e) This section does not apply to:
(i) the use of water according to a lease or other agreement with the appropriator or the
appropriator's successor in interest;
(ii) a water right if its place of use is contracted under an approved state agreement or
federal conservation fallowing program;
(iii) those periods of time when a surface water or groundwater source fails to yield
sufficient water to satisfy the water right;
(iv) a water right when water is unavailable because of the water right's priority date;
(v) a water right to store water in a surface reservoir or an aquifer, in accordance with
Title 73, Chapter 3b, Groundwater Recharge and Recovery Act, if:
(A) the water is stored for present or future use; or
(B) storage is limited by a safety, regulatory, or engineering restraint that the
appropriator or the appropriator's successor in interest cannot reasonably correct;
(vi) a water right if a water user has beneficially used substantially all of the water right
within a seven-year period, provided that this exemption does not apply to the adjudication of a
water right in a general determination of water rights under Chapter 4, Determination of Water
Rights;
(vii) except as provided by Subsection (2)(g), a water right:
(A) (I) owned by a public water supplier;
(II) represented by a public water supplier's ownership interest in a water company; or
(III) to which a public water supplier owns the right of use; and
(B) conserved or held for the reasonable future water requirement of the public, which
is determined according to Subsection (2)(f);
(viii) a supplemental water right during a period of time when another water right
available to the appropriator or the appropriator's successor in interest provides sufficient water
so as to not require use of the supplemental water right; or
(ix) a period of nonuse of a water right during the time the water right is subject to an
approved change application where the applicant is diligently pursuing certification.
(f) (i) The reasonable future water requirement of the public is the amount of water
needed in the next 40 years by:
(A) the persons within the public water supplier's reasonably anticipated service area
based on reasonably anticipated population growth; or
(B) other water use demand.
(ii) For purposes of Subsection (2)(f)(i), a community water system's reasonably
anticipated service area:
(A) is the area served by the community water system's distribution facilities; and
(B) expands as the community water system expands the distribution facilities in
accordance with Title 19, Chapter 4, Safe Drinking Water Act.
(g) For a water right acquired by a public water supplier on or after May 5, 2008,
Subsection (2)(e)(vii) applies if:
(i) the public water supplier submits a change application under Section 
73-3-3
; and
(ii) the state engineer approves the change application.
(3) (a) The state engineer shall furnish a nonuse application form requiring the
following information:
(i) the name and address of the applicant;
(ii) a description of the water right or a portion of the water right, including the point of
diversion, place of use, and priority;
(iii) the quantity of water;
(iv) the period of use;
(v) the extension of time applied for;
(vi) a statement of the reason for the nonuse of the water; and
(vii) any other information that the state engineer requires.
(b) (i) Upon receipt of the application, the state engineer shall publish a notice of the
application once a week for two successive weeks:
(A) in a newspaper of general circulation in the county in which the source of the water
supply is located and where the water is to be used; and
(B) as required in Section 
45-1-101
.
(ii) The notice shall:
(A) state that an application has been made; and
(B) specify where the interested party may obtain additional information relating to the
application.
(c) Any interested person may file a written protest with the state engineer against the
granting of the application:
(i) within 20 days after the notice is published, if the adjudicative proceeding is
informal; and
(ii) within 30 days after the notice is published, if the adjudicative proceeding is
formal.
(d) In any proceedings to determine whether the nonuse application should be
approved or rejected, the state engineer shall follow the procedures and requirements of Title
63G, Chapter 4, Administrative Procedures Act.
(e) After further investigation, the state engineer may approve or reject the application.
(4) (a) The state engineer shall grant a nonuse application on all or a portion of a water
right for a period of time not exceeding seven years if the applicant shows a reasonable cause
for nonuse.
(b) A reasonable cause for nonuse includes:
(i) a demonstrable financial hardship or economic depression;
(ii) physical causes or changes that render use beyond the reasonable control of the
water right owner so long as the water right owner acts with reasonable diligence to resume or
restore the use;
(iii) the initiation of water conservation or efficiency practices, or the operation of a
groundwater recharge recovery program approved by the state engineer;
(iv) operation of legal proceedings;
(v) the holding of a water right or stock in a mutual water company without use by any
water supply entity to meet the reasonable future requirements of the public;
(vi) situations where, in the opinion of the state engineer, the nonuse would assist in
implementing an existing, approved water management plan; or
(vii) the loss of capacity caused by deterioration of the water supply or delivery
equipment if the applicant submits, with the application, a specific plan to resume full use of
the water right by replacing, restoring, or improving the equipment.
(5) (a) Sixty days before the expiration of a nonuse application, the state engineer shall
notify the applicant by mail or by any form of electronic communication through which receipt
is verifiable, of the date when the nonuse application will expire.
(b) An applicant may file a subsequent nonuse application in accordance with this
section.